Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.4 LAccepted-Finance 692 BAHRA SAUDAGAR NABI PURWA HARDOI UTTAR PRADESH | HARDOI | HARDOI | UTTAR PRADESH | L1 | Accepted-Finance L1 | |
| 2 | L2₹72.1 L+₹72,914.62 (1.02%)Rejected-Finance 221 | HARDOI | UTTAR PRADESH | 209869 | L2 | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹5.7 L
Closing Date
18 Sept 2026, 12:00 pmClosed
S. E. UNNAO CIRCLE, PWD UNNAO
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
Re-Construction work of Mohalla Akhtiyarpurwa to Daulatiyapur Part-1 and 5 years maintenance work in F.Y. 2026-27 in District Hardoi.
2026_CEUCZ_1185210_4
3775M/1MT/ E-TENDER/UC/26-27 DATE 01.09.2026
Open Tender
Civil Works
Percentage
90 days
HARDOI
Re-Construction work of Mohalla Akhtiyarpurwa to Daulatiyapur Part-1 and 5 years maintenance work in F.Y. 2026-27 in District Hardoi.
2 documents required · 2 mandatory
₹2,714
₹5.7 L
Yes
OFFICE OF S. E. UNNAO CIRCLE, PWD UNNAO
23 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
18 Sept 2026
12 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits availble land with all lifts and leads, spreading, grading to required slope and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specitaion Clause 303 . Including Labour Cess but Excluding G.S.T. | 924 | Cum | 85 | ₹78,540 |
| 2 | Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density Including Labour Cess but Excluding G.S.T. | 231 | Cum | 5,100 | ₹11,78,100 |
| 3 | Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.Including Labour Cess but Excluding G.S.T. | 693 | Cum | 8,350 | ₹57,86,550 |
| 4 | Maintenance of constructed of CC road for next five years after the actual date of completion, the contractor shall be paid total maintenance cost as Rs. 46878.38 for five year in the form of installment as below, The payment shall the inclusive of cess but excluding GST. Payment shall be done as per satisfaction of engineer in charge regarding maintenance work carried out by contractor. (Including Labour cess but Excluding GST)
(i) Ist Year zero and 2nd year after the actual date of completion @ 0.25% of total Construction cost | 1.54 | Km | 11,433.75 | ₹17,607.98 |
| 5 | (ii)3rd year @ 0.50% of total Construction cost | 1.54 | Km | 22,867.5 | ₹35,215.95 |
| 6 | (iii) 4th year @ 0.75% of total Construction cost | 1.54 | Km | 34,301.25 | ₹52,823.93 |
| 7 | (iv) 5th year @ 1.0% of total Construction cost | 1.54 | Km | 45,735 | ₹70,431.9 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.01 MB
T23775.pdf
Tender Documents • 1.02 MB
BOQ_2230230.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .