Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance ALAGAPURAM PERIYAPUTHUR SALEM | SALEM | TAMIL NADU | 636001 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
15 Sept 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Deputy General Manager(ITPD)
Repair works at ELCOT IT Park, Gangaikondan, Tirunelveli
Repair works at ELCOT IT Park Gangaikondan Tirunelveli
2023_ELCO_365343_1
ELCOT/ITPD/016/TVL-Repair works/2023
Open Tender
Civil Works
Works
75 days
Tirunelveli Gangaikondan
Please refer Tender documents.
6 documents required · 6 mandatory
₹11,800
Payable To ELCOT
₹40,000
15 Sept 2023
31 Aug 2023
15 Sept 2023
31 Aug 2023
15 Sept 2023
8 Sept 2023
PART-A (CIVIL)
Dismantling the existing Brick work In Cement Mortar under 3m height carefully without disturbing the adjoining structures and Stacking the unservicable materials at site complying with standard specification.
Clean removal of Cement plaster from walls and roofing min 20mm deep
Paving the Top of roof with Solar refelective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three crushed stone sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
Painting the wall two coats with approved weather proof Exterior Emulsion paint with one primer coat of over cement plastered wall surface ect., complete complying with standard specification.
Existing pressed tiles joint pointed removing Damage area refilling new Cement Mortar 1:3 (One Cement and Three Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers
Supply, erection, testing and commissioning of following MS 'C' Class Heavy Duty Pipe as per IS 1239 to withstand a developing pressure of 10kg /sq.cm including necessary fittings like MS flange of table 'E' elbows, reducers, gaskets, bolt, nuts wth washerr & joints as per standard method of arc welding, including one coat of metal primer and two coat of Post Officer Red painting including conveyance, all incidental charges, necessary scaffolding and re-doing the dismantled portions to its original condition whererver found necessary etc complete as per standard specification and as directed by the Departmental Officers. Make: JINDAL/ EQUIVALENT.
Painting two coats of old plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved over the existing priming coat in all floors excluding cost of priming coat etc.,complete complying with standard specification.,(The make, quality be got approved by the Executive Engineer before use on works.)
Painting one coats of old celling surface with ready mixed plastic emulsion paint of first class quality and of approved over the existing priming coat in all floors excluding cost of priming coat etc.,complete complying with standard specification.,(The make, quality be got approved by the Executive Engineer before use on works.)
Painting the wall two coats with approved weather proof Exterior Emulsion paint over the existing priming coat in all floors excluding cost of priming coat etc.,complete complying with standard specification.,(The make, quality be got approved by the Executive Engineer before use on works.)
Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Stilt / Ground Floor
In First Floor
In Second Floor
In Third floor
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
For plane surfaces such as vertical slab, side slabs of boxing, vertical drops, facia, vertical wall, etc.
Centering for curved surfaces of all RCC items of work
Painting the wall one coats with approved weather proof Synthetic Enamel paint of over cement plastered or Primer wall surface ect., complete complying with standard specification.(The make, quality be got approved by the Executive Engineer before use on works.)
Painting the wall one coats with approved Water based primer of over cement plastered wall surface ect., complete complying with standard specification.
Painting old wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors excluding the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Providing two legged scaffolding using 15cm diameter casurina props props of 4m overall length (3m height + 0.5m in to the ground +0.5m projection) the distance between the two rows being 1.25m, and the spacing of props at 2m, in both the rows with two horizontal props with 0.5m overlap on either side and braces at 2m, c/c including longitudinal and transverse middle braces to step up and providing a platform with Silver Oak planks of 40mm thick and 1m width using coir and nails etc. complete
Ground to 3.00m Height
Additional Height of 2.50M or part there of
Structural Glazing: Providing and fixing structural glazing fabricated from roll formed sections made of galvanized steel colour coated (Base steel as per IS 513 of 'D' quality, galvanized as per IS 277 with zinc of 120 grams / sqm.) with total coated thickness of 0.72mm. The glass holding section made of 304 grade SS of 0.6mm thick. Galvanized steel sections are to be used as stiffeners inside the colour coated steel / powder coated sections as per the design requirement. Design calculations are made to suit wind pressures as given in IS 875.including coat scaffolding, Remove the existing damaged structural glazing. Paint Specifications: Primer coat with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with alkyd backer of 5-7 microns or powder coated with pure polyester powder upto 50-60 microns thick. Dimensions: The section should be of 37 x 53mm for frame vertical, 37 x 53mm for frame horizontal section and section for reinforcement should be of 31 x 55mm. glass holding section should be of 37 x 37mm for top and bottom grids in between should be of 37 x 18mm.
joseph sahaya selvam
NIXON ALVIN R
SG ASSOCIATES
Revathi Infra
Mookambika Construction
BARANI CONSTRUCTION
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .