Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.6 LAccepted-AOC | ₹8.6 L | L1 | Accepted-AOC Qualified in AOC |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Original EMD not received |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Price Bid not complied |
| Sl No | Description | Qty | Unit | S.Muralikumar L1 |
|---|---|---|---|---|
| 1.00 | Earht work excavation in all clauses of soil and subsoil to full depth as may be directed except hard rock including all materials to site etc complete. As Per SS 2`0B | 25.04 | CUM | 263 ₹6,585.52 Lowest |
| 2.00 | Refilling with excavated earth including cost and convenyance all materials to site etc complete. | 7.28 | CUM | 45 ₹327.6 Lowest |
| 3.00 | Cement concrete 1:4:8 mix using 40mm HBG metal including cost and convenyance all materials to site etc complete. | 8.29 | CUM | 5,454 ₹45,213.66 Lowest |
| 4.00 | Reinforced Cement concrete 1:1.5:3 using 20mm ISS HBG metal including cost and convenyance all materials to site etc complete | 10 | CUM | 9,357 ₹93,570 Lowest |
| 5.00 | Brick work in CM 1 :5mix using country bricks including cost and convenyance all materials to site etc complete. | 20.14 | CUM | 6,149 ₹1,23,840.86 Lowest |
| 6.00 | Supplying and Erecting centering for Rcc itmes of works as per design including cost of shutting and labour chargers etc complete | 65 | SQM | 1,095 ₹71,175 Lowest |
| 7.00 | Supplying and Fabricating and placing in position MS steel or ribbed for steel for all reinforced cement 5 concrete works as per the design given jncluding cost of steel and binding wire in all floors ete, Complete complying with stanard specification. | 1.65 | MT | 91,932 ₹1,51,687.8 Lowest |
| 8.00 | Providing ceramic tiles size 305x305x6mm in CM 1:3 20mm thick of cost and conveyance to site of all charges etc. | 24.66 | SQM | 1,068 ₹26,336.88 Lowest |
| 9.00 | Plastering with CM 1:5,mix using 12mm thick including cost and convenyance all materials to site etc complete | 157.35 | SQM | 285 ₹44,844.75 Lowest |
| 10.00 | Finishing the exposed surface of RCC item of work CM 1 :3, 10mm thick. including cost and convenyance all materials to site etc | 24.32 | SQM | 328 ₹7,976.96 Lowest |
Tender Value
₹8.7 L
EMD Value
₹9,000
Closing Date
22 Oct 2025, 3:00 pmClosed
The Block Development Officer BP
Panchayat union office Building Lathur at Pavunju
Construction of Kitchen shed in PUP School in Perundhuravu at Mugaiyur Panchayat in Lathur Panchayat Union in Chengalpattu district.
2025_RDTN_614336_1
Tender ref no . 2993/2025/A9 dt.19.09.2025
Open Tender
Civil Works
Item Wise
Construction of Kitchen shed in PUP School in Peru
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,000
Yes
25 Oct 2025
15 Oct 2025
22 Oct 2025
15 Oct 2025
22 Oct 2025
15 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Technical.pdf
Tender Documents • 0.85 MB
BOQ_734010.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .