| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹65.6 LAccepted-AOC | ₹65.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹66.2 L+₹68,993 (1.05%)Rejected-AOC 417 SHAHPUR NIJ MORTA DISTT GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | ₹66.2 L+₹68,993 (1.05%) | L2 | Rejected-AOC L2 |
| 3 | L3₹67.3 L+₹1.8 L (2.70%)Rejected-AOC | ₹67.3 L+₹1.8 L (2.70%) | L3 | Rejected-AOC L3 |
| 4 | L4₹68.1 L+₹2.6 L (3.90%)Rejected-AOC | ₹68.1 L+₹2.6 L (3.90%) | L4 | Rejected-AOC L4 |
| 5 | Rejected-Technical 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | - | - | Rejected-Technical Documents Incomplete |
| Sl No | Description | Qty | Unit | NARENDRA KUMAR L4 | MOHAMMAD AWAIS L3 | M/S OM ENTERPRISES L2 | S R CONTRACTORS L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as directed by Engineer in Charge. | 4,841.93 | Sqm | 8 ₹38,735.44 | 10 ₹48,419.3 | 10 ₹48,419.3 | 2.5 ₹12,104.83 Lowest |
| 2.00 | Demolishing cement mortar brick work manually means including stacking of serviceable material and disposal of unserviceable material / Bricks shall be preapred as brick ballast and shall be used in Pathway & Aproach Road within 50 metres lead as per direction of Engineer-in-charge. | 88.14 | cum | 1,200 ₹1,05,768 | 1,300 ₹1,14,582 | 1,210 ₹1,06,649.4 | 500 ₹44,070 Lowest |
| 3.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.with All kinds of soil. as directed by Engineer in Charge. | 262.58 | cum | 170 ₹44,638.6 | 105 ₹27,570.9 | 150 ₹39,387 | 90 ₹23,632.2 Lowest |
| 4.00 | Ordinary Centring and Shuttring of Ply Wood or Steel For RCC Work. as directed by Engineer in Charge. | 229.03 | Sqm | 500 ₹1,14,515 | 500 ₹1,14,515 | 640 ₹1,46,579.2 | 450 ₹1,03,063.5 Lowest |
| 5.00 | Centering and Shuttering in straight portion of PCC as directed by Engineer in Charge. | 193.32 | Sqm | 400 ₹77,328 | 350 ₹67,662 | 400 ₹77,328 | 180 ₹34,797.6 Lowest |
| 6.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources) as directed by Engineer in Charge. | 45.79 | cum | 5,000 ₹2,28,950 | 4,600 ₹2,10,634 | 4,557 ₹2,08,665.03 Lowest | 5,200 ₹2,38,108 |
| 7.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) as directed by Engineer in Charge. | 29 | cum | 6,500 ₹1,88,500 | 5,800 ₹1,68,200 | 5,700 ₹1,65,300 Lowest | 6,700 ₹1,94,300 |
| 8.00 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. With Thermo-Mechanically Treated bars of grade Fe-500D or more. as directed by Engineer in Charge. | 3,377.04 | Kg | 75 ₹2,53,278 | 65 ₹2,19,507.6 Lowest | 70 ₹2,36,392.8 | 70 ₹2,36,392.8 |
| 9.00 | Brick Aggregate (Single size) : 40 mm nominal size | 9.16 | cum | 514 ₹4,708.24 | 475 ₹4,351 | 410 ₹3,755.6 Lowest | 1,000 ₹9,160 |
| 10.00 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. as directed by Engineer in Charge. | 10.21 | cum | 1,560 ₹15,927.6 | 1,000 ₹10,210 | 1,260 ₹12,864.6 | 950 ₹9,699.5 Lowest |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
1 Sept 2025, 5:00 pmClosed
S.E.
E.G.C. Circle, Bijnor
Renovation work of Kiratpur colony under Eastern Ganga Canal Construction Division-4, Bijnor in Distt. Bijnor.
2025_UPIDC_1068279_1
01/SE/2025-26
Open Tender
Civil Works - Buildings
Item Wise
180 days
Bijnor
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
28 Oct 2025
27 Aug 2025
2 Sept 2025
27 Aug 2025
1 Sept 2025
27 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .