Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.4 LAccepted-AOC | L1 | Accepted-AOC BEING L1 BID
AND EAS
ACCEPTED BY
TC | |
| 2 | L2₹31.4 L+₹93,506 (3.07%)Rejected-Finance B 259 RAJAJI PURAM LUCKNOW 226017 | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226017 | L2 | Rejected-Finance Being other
than L1 | |
| 3 | L3₹35.2 L+₹4.7 L (15.4%)Rejected-Finance GALI NO 5 6 H NO 6 275 JHARODA MAARA EXTN PART III BURARI NEW DELHI 110084 | NEW DELHI | CENTRAL DELHI | DELHI | 110084 | L3 | Rejected-Finance Being other
than L1 | |
| 4 | L4₹35.9 L+₹5.4 L (17.9%)Rejected-Finance 58 SHAHEED NAGAR OPP BHIMRAO AMBEDEKAR UNIVERSITY RBL ROAD LUCKNOW 226025 UP | LUCKNOW | LUCKNOW | UTTAR PRADESH | 226025 | L4 | Rejected-Finance Being other
than L1 | |
| 5 | L5₹42.6 L+₹12.2 L (39.9%)Rejected-Finance | L5 | Rejected-Finance Being other
than L1 |
| Sl No | Description | Qty | Unit | QUALITY CONSTRUCTIONS CO L3 | M/S Agnihotri Construction Co L1 | M/S S S A ASSOCIATES L4 | m/s raghubar dayal L5 | M/s Rathore Traders L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Removing existing roof treatment and preparing surfaces to the entire satisfaction of Engr-in Charge /GE including taking down existing plaster,cleaning of all foreign material such as grass roots dust etc and roughening the concrete surfaces by wire brushes and washing down to remove dust etc . flushing at junction of parapets complete and removing the same to the places where complete all as specified and as directed by Engr-in-Charge. | 90 | Sqm | 30 ₹2,700 | 50 ₹4,500 | 10 ₹900 | 25 ₹2,250 | 5 ₹450 Lowest |
| 2.00 | M&L for plain cement concrete 1:2:4 type B1 using 12.5 mm graded aggregate as in roof for maint. the uniform slope etc any thickness at any height and in any position complete all as specified and as directed by engr-in-charge at site. | 3.6 | Cum | 4,000 ₹14,400 | 4,800 ₹17,280 | 5,200 ₹18,720 | 5,600 ₹20,160 | 3,500 ₹12,600 Lowest |
| 3.00 | M & L for 20 mm thick rendering in cement mortar 1:4 on brick work or concrete surfaces on other than fair face surface , surface finished even and smooth without using extra cement using water proofing compound fair and complete all as specified and as directed | 90 | Sqm | 110 ₹9,900 Lowest | 180 ₹16,200 | 200 ₹18,000 | 170 ₹15,300 | 150 ₹13,500 |
| 4.00 | Supply only integral water proofing compound complete all as specified and as directed | 30 | KG | 40 ₹1,200 | 40 ₹1,200 | 60 ₹1,800 | 50 ₹1,500 | 35 ₹1,050 Lowest |
| 5.00 | M&L for roof treatment with polymeric water proofing membrane consisting of following complete all as specified and directed :- (a) Applying bituminous primer conforming to IS 702-1988 @ 1.20 Kgs/ sqm.
(b) APP modified bitumenous membrane minium weight 3 kg/sqm and minimum 3 mm thick reinforced with polyester non wove fabric ( wt. not less than 150 gms/sqm) laid on primed surface by heat process, over laps of 100 mm shall be sealed / fused by flame torch application as per manufacturer instructions.
(c) Applying two coat of bituminous bases aluminium paint @ 0.2 kgs/sqm over APP membrane. | 90 | Sqm | 600 ₹54,000 | 250 ₹22,500 Lowest | 600 ₹54,000 | 550 ₹49,500 | 400 ₹36,000 |
| 6.00 | M & L for PCC 1:2:4 for PCC type B-1 using 20 mm graded stone aggregate as in coping steps bed blocks/roof gola etc.complete all as specified and as directed | 7 | Cum | 3,800 ₹26,600 | 4,500 ₹31,500 | 5,500 ₹38,500 | 5,600 ₹39,200 | 3,500 ₹24,500 Lowest |
| 7.00 | Dismantling of CGI/ Galvalume/ PGI sheets in roof coverings including ridges complete all as specified and as directed | 140 | Sqm | 30 ₹4,200 | 30 ₹4,200 | 15 ₹2,100 | 20 ₹2,800 | 10 ₹1,400 Lowest |
| 8.00 | S&F pre-painted galvalume aluminium zinc coating GI based corrugated steel sheet 0.50 mm thick of an colour having tensile strength of 550 Mpa as in roof covering /cladding to wall, fixed with self tapping screws as specified complete all as specified and as directed. | 216 | Sqm | 670 ₹1,44,720 | 450 ₹97,200 Lowest | 640 ₹1,38,240 | 620 ₹1,33,920 | 605 ₹1,30,680 |
| 9.00 | Demolition of plain Concrete of any description and in any position not otherwise specifically provided for complete all as specified & directed. | 1 | Cum | 200 ₹200 | 500 ₹500 | 150 ₹150 | 250 ₹250 | 100 ₹100 Lowest |
| 10.00 | Dismantling of wall and ceiling boards (fibre,pulp insulation,AC plain sheets etc.)any thickness including cover fillets complete all as specified and as directed | 30 | Sqm | 20 ₹600 | 40 ₹1,200 | 10 ₹300 | 20 ₹600 | 5 ₹150 Lowest |
Tender Value
₹48.3 L
EMD Value
₹96,520
Closing Date
22 Sept 2025, 6:00 pmClosed
GE (EAST) LUCKNOW
GE EAST LUCKNOW PIN 226002
PROVN OF SHED IN FRONT OF P 26A OR MESS AND COVERED MESH IN CORRIDOR OF FIRST FLOOR P26 AND P27 OR LINE AND GD POST ALONGWITH STAIRS AND RAILING ON ROOF OF GD ROOMS AT 25 WEU AND OTHER MINOR WORK UNDER GE EAST LUCKNOW
2025_MES_727467_1
GE/E/LKO/T-45 OF 2025-26
Open Tender
Civil Works
Item Rate
270 days
GE (EAST) LUCKNOW
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹500
GE (EAST) LUCKNOW
₹96,520
Yes
26 Nov 2025
25 Aug 2025
29 Sept 2025
25 Aug 2025
22 Sept 2025
8 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .