Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.4 LAdmitted-Finance | -32.00% | ₹3.4 L | L1 | Admitted-Finance |
| 2 | L2₹3.5 L+₹5,000.95 (1.47%)Admitted-Finance | -31.00% | ₹3.5 L+₹5,000.95 (1.47%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 L+₹30,155.75 (8.87%)Admitted-Finance | -25.97% | ₹3.7 L+₹30,155.75 (8.87%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 L+₹35,006.68 (10.3%)Admitted-Finance | -25.00% | ₹3.8 L+₹35,006.68 (10.3%) | L4 | Admitted-Finance |
| 5 | L5₹4.0 L+₹60,011.44 (17.6%)Admitted-Finance | -20.00% | ₹4.0 L+₹60,011.44 (17.6%) | L5 | Admitted-Finance |
Tender Value
₹5 L
EMD Value
₹10,000
Closing Date
24 Aug 2026, 6:00 pmClosed
Er. Sanjeev Sharma
XEN PWD Akhnoor
BOQ
2026_PWDJK_317854_18
e-NIT No. 34 of 2026-27 Dated 22-07-2026
Open Tender
Civil Works
Percentage
60 days
Akhnoor
NIT
2 documents required · 2 mandatory
₹600
XEN PWD Akhnoor
₹10,000
7 Sept 2026
27 Jul 2026
25 Aug 2026
27 Jul 2026
24 Aug 2026
27 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour engaged for Removing Trees, herbs, shrubs for preparation of site | 8 | Days | 553 | ₹4,424 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 25 | cum | 256.85 | ₹6,421.25 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 5 | cum | 5,202.9 | ₹26,014.5 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 20 | cum | 5,733.6 | ₹1,14,672 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 85 | sqm | 286.35 | ₹24,339.75 |
| 6 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 11 | sqm | 416.5 | ₹4,581.5 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 22 | cum | 7,571.55 | ₹1,66,574.1 |
| 8 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 22 | cum | 1,455.65 | ₹32,024.3 |
| 9 | 12mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 96 | sqm | 266.2 | ₹25,555.2 |
| 10 | 15mm Cement plaster on the rough side of single or half brick wall of mix: 1 : 6 ( 1 cement : 6 fine sand) | 107 | sqm | 306.85 | ₹32,832.95 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_1044549.xls
BOQ • 0.24 MB
Scan.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .