| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-Finance | ₹13.0 L | L1 | Accepted-Finance L1,L2 |
| 2 | L2₹13.7 L+₹66,827.50 (5.13%)Rejected-Finance | ₹13.7 L+₹66,827.50 (5.13%) | L2 | Rejected-Finance L1,L2 |
Tender Value
₹13.4 L
EMD Value
₹26,800
Closing Date
23 Mar 2026, 5:00 pmClosed
E.E. Bangana
Executive Engineer Bangana Division HPPWD Bangana
Preparation of Detailed project report, General Arrangement Drawing, Structural design of sub structue and super structure, preparation of working drawings and preparation of Detailed project report of bridge and road under NABARD.)
2026_PWD_131713_1
11479-11509 dated 12.03.2026
Open Tender
Civil Works - Roads
Percentage
30 days
Bangana
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
₹26,800
29 Jul 2026
17 Mar 2026
24 Mar 2026
17 Mar 2026
23 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preparation of DPR, Topographical survey plan & Mark provisions on the Survey plan which include the following provision as given below:-
a) Topography survey by digital total station with two second accuracy, showing all features on survey plan like trees, culverts, bridges, electric poles, telephone poles, hand pumps, schools, Habitants villages etc.
b) Draw cross-sections at 15m (fifteen meter) intervals, L-section & calculate the quantity of earth work in standard format of autocad showing all layer of pavement components as applicable.
c) Preparation of survey plan showing all provision on the topographical survey plan and preparation of detailed project report as per MORTH Guidelines. | 1 | Per K.M. | 35,000 | ₹34,965 |
| 2 | CBR-Value & Pavement design of crust as per IRC:SP-72-2015 | - | Each | 3,500 | - |
| 3 | Preparation of General arrangement Drawing (G.A.D.) for construction of Bridge. | - | No. | 2,25,000 | - |
| 4 | Structural design of sub structure and super structure and preparation of working drawings complete in all respect. | - | No. | 6,65,000 | - |
| 5 | Preparation of detailed project report including submission of 5-set of DPR after manuscript copy from Chief office as per latest guidelines | - | No. | 1,55,000 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 0.34 MB
BOQ_194783.xls
BOQ • 0.31 MB
3.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .