| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.6 LAccepted-AOC | 1 | Accepted-AOC L-1 Bidder | |
| 2 | 2₹7.4 L+₹1.5 L (6.44%)Accepted-AOC NEAR KRAYA VIKRAY SAMITI ASHOK NAGAR DISTRICT FATEHPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | 2 | Accepted-AOC L-2 Bidder | |
| 3 | 3₹24.5 L+₹1.5 L (6.49%)Rejected-AOC | 3 | Rejected-AOC L-3 Bidder |
Tender Value
Refer Docs
EMD Value
₹39,500
Closing Date
28 Mar 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer O and MC II BTPS
Office of Superintending Engineer, O and MC II, BTPS Anpara
Routine and Breakdown maintenance of Electrostatic Precipitator and Breakdown maintenance of PC Pipe (Pulverized Fuel Pipe)
2024_RVUNL_913758_1
N-ANP/B/OMC2/BMD1/6000004918
Open Tender
Miscellaneous Works
Fixed-rate
548 days
Anpara Thermal Power Plant, Anpara
As per Pre Qualifications Conditions in Tender Document
2 documents required · 2 mandatory
₹1,180
Dy CAO, CFA and BO, BTPS, Anpara
₹39,500
8 May 2024
8 Mar 2024
29 Mar 2024
8 Mar 2024
28 Mar 2024
8 Mar 2024
Amount
Electro-static Precipitator
Cleaning and sweeping of railing of ESP top cover and cleaning of double geared motors of emitting electrode rapping mechanism (EERM). Installed capacity in each unit EERM-56 nos., thus total-112 nos. In both the units.
Cleaning and sweeping of platform between pass A&B and pass C&D and cleaning of double geared motors of Collecting electrode rapping mechanism (CERM) and gas distribution rapping mechanism (GDRM). Installed capacity in each unit of CERM-28 nos. and GDRM-04 nos. total-32 nos., thus total-64 nos. In both the units.
Checking of oil level and attending oil leakage in all double geared motors, CERM, GDRM & EERM in both units.
Cleaning and sweeping of all stairs, railings and platforms from '0' to '40' M up to ESP top of both units.
Cleaning and sweeping of outside casing walls between pass A&B and C&D from CERM level to ESP top walls and also in front of ball mills from '0' to '40' M of ESP top walls of both units.
Inspection & tightening of nuts & bolts of CERM, GDRM & EERM if found in loose condition.
Cleaning of ash dust from ESP top roof of one pass. One job involves cleaning of collected ash dust from top roof, cleaning of jhallas from beams and columns of ESP pass. Disposal of ash collected from top floor of ESP during cleaning of roof of ESP.
Cleaning of complete structure, electrodes, shock bar, rapping mechanism & hoppers from inside of ESP of one field by wire brush, hard broom and old cloth.
Evacuation of ESP ash hoppers.
Cleaning & Removal of ash/ dust from support insulator by fine cloth.
Alignment of disturbed emitting structure by opening all the cover plates of support structure. Lifting the emitting structure about 50 mm after loosing all the nuts of the structure suspension rod and then restoring the cover plates and loosened nuts after alignment.
Repairing / Replacement of pin wheel of emitting electrode rapping mechanism.
Cleaning and Removal of ash /dust from shaft Insulator by fine cloth.
Replacement/ Repairing of CERM shaft.
Replacement/ Repairing of GDRM shaft.
Replacement/ Repairing of EERM shaft.
Repairing of emitting frame by patch welding.
Replacement of primary/ secondary screen of GDRM.
Replacement of asbestos rope of ESP manhole.
Servicing of gear box EERM.
Servicing of gear box CERM.
Repairing of cover of geared motor of CERM.
Repairing/replacement of clutch or coupling of CERM.
Repairing/replacement of shaft of double gear motor of EERM/CERM.
Replacement of Rapping Hammer
Replacement of Plane bearing of Rapping Mechanism
Replacement of Rapping Shaft
Repairing of Bent collecting electrodes in ESP Chamber in fix position
Fixing of collecting electrodes with clamp/strip by bolting & welding
Repair/Replacement of Shock bar
Replacement of Shock pads
Repairing of shock bar guide (front/rear) and shock bar guide attachment by welding or grinding wherever required.
Straigtening of bent stay guide bar of collecting structure
Removal of damaged emitting electrode and fixing the new emitting electrode.
Changing the damaged support insulator.
Changing the damaged shaft insulator.
Alignment of disturbed emitting electrode.
Repairing of support insulator screen pipe inside the ESP
Replacement of asbestos rope of ESP Shaft insulators cover.
Replacement of damaged motor gear box of rapping system.
Repairing of damaged rapping gear box.
Repairing of coupling of reduction gear box of collecting/emitting/GD rapping system.
Replacement of asbestos rope of ESP Hopper manhole/ casing manhole/ casing top manhole.
Repairing of manhole by replacing damaged plate portion with new one.
Repairing of eroded portion by welding in Ash hopper, ESP roof and other place inside and outside of ESP chamber.
Reapir/fixing/welding of ash deflector plate.
Repairing of refabrication / support of duct plate at ESP inlet.
Repairing of bracing between ESP inlet gate and GD screen and rear side of ESP by providing patch at eroded area or changing new piece by bracing pipe as per size.
Repairing / refixing of deflector plate on gas distribution screen.
Inspection and checking of ESP field and removal of minor defects.
Repairing of GD screen
Pulverized Fuel Pipe (PC Pipe)
Replacement of Mill Outlet Elbow
Repairing of mill outlet elbow in installed condition by providing patch on eroded portion.
Replacement of straight coal pipe up to 2-meter length per joint.
Replacement of straight coal pipe above 2-meter length per meter (escl. Joints)
Replacement/Refixing o pulverized fuel pipe bends 60 deg. To 90 deg.
Replacement/Refixing o pulverized fuel pipe bends below 60 deg.
Preparation of temporary platform required to carry out the work of replacement of P.C. pipe bends, repairing of P.C. piping in installed condition.
Turning of straight coal pipe by 180 Deg. max.
Replacement/Repairing of Victaulic coupling.
Removal and Re-fixing of locking plate and clamps at the ends of fuel pipe bends.
Repairing/Replacement of coal pipe flanges after revolving Victaulic coupling & rubber gasket and putting back the rubber gasket coupling after repairing.
Replacement of orifices or reversing the position of orifices.
Replacement / refixing of rubber gasket of Victaulic coupling/closer joint of P.C. piping.
Removal of pulverized coal chocking from fuel piping in between Mill out let to furnace inlet by gas cutting a window type opening at various place of fuel pipe to ascertain the opening the place of chocking, removal of chocking by taking out coal from and then restoring the openings by welding.
Fabrication, Erection of plate form, ladders, grills etc. and miscellaneous steel structural works consisting of light and heavy steel sections required at various places in the Boiler area.
Repairing of straight coal pipe by providing over patch of size 25cmx25cm to 40cm X40cm on eroded portion in installed condition.
Bending of 10 mm Selma plate of size: 1500 x 2035 mm in profile of P.C. pipe of O.D. 660.4 mm.
Repairing of straight coal pipe by providing a level patch of size 400X400 mm to 600 mm X 600 mm by cutting the eroded portion and weld a level patch of same size in installed condition.
Repairing of P.C. pipe support and realignment of related P.C. pipe.
Repairing of fuel mill inlet elbow in installed condition by welding/providing patch on eroded portion.
Repairing/replacement socket pipe-I/ socket pipe-II/ spigot pipe of closure joint assembly.
Retrieval of healthy coal pipe collar form scrap coal pipe for use by gas cutting.
Repairing of Closure joint assembly completed housing by way of metal build up with suitable electrodes and as per metal composition and grinding as per original profile.
Replacement of old closure joint assembly along with housing by repaired / new assembly.
Repairing and reclamation of Mill outlet elbow for P.C. Piping.
Repairing and reclamation of Bend for P.C. Piping.
M/S SURYA CONSTRUCTION COMPANY
M/S NISHA ENTERPRISES
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .