| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.5 LAccepted-AOC | 1 | Accepted-AOC quoted rate is lower than bidder 2 and lower than estimate amount | |
| 2 | 2₹13.7 L+₹21,028.96 (1.56%)Rejected-Finance | 2 | Rejected-Finance Quoted rate is higher than bitter 1 amount |
| Sl No | Description | Qty | Unit | SELVANAYAKKIAMMAN BUILDERS L1 | SHREE VEERAIYAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub soils and full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting,and baling out water wherever necessary and refilling in sides of foundation with excavated more than 15cm thick | 89.42 | Cum | 263.78 ₹23,587.21 Lowest | 264.5 ₹23,651.59 |
| 2.00 | Collection and supply of sand and filling in to the basement including cost and including cost and conveyance of all materials to site and labour charges etc complete | 7.56 | Cum | 547.94 ₹4,142.43 Lowest | 550.58 ₹4,162.38 |
| 3.00 | Cement conceret 1:4:8 mix using 40mm ISS gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers morethan 15cm thick | 8.35 | Cum | 5,578.83 ₹46,583.23 Lowest | 5,578.83 ₹46,583.23 Lowest |
| 4.00Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete | |||||
| 5.00 | BGL | 87.15 | sqm | 547.5 ₹47,714.63 Lowest | 547.5 ₹47,714.63 Lowest |
| 6.00 | AGL | 48.3 | sqm | 1,095 ₹52,888.5 Lowest | 1,250 ₹60,375 |
| 7.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete | 1.93 | MT | 91,957.3 ₹1,77,753.46 Lowest | 91,960.3 ₹1,77,759.26 |
| 8.00 | Reinforced Cement Concrete in 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to site and labour charges etc complete | 21.97 | Cum | 9,327.09 ₹1,81,411.9 Lowest | 9,420.56 ₹1,83,229.89 |
| 9.00 | Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification. | 33.45 | Cum | 7,340.19 ₹2,45,529.36 Lowest | 7,450.58 ₹2,49,221.9 |
| 10.00 | Plastering in CM 1:5, 12mm thick including cost and conveyance charges etc., | 339.15 | Sqm | 285.09 ₹96,688.27 Lowest | 290 ₹98,353.5 |
Tender Value
₹13.6 L
EMD Value
₹27,300
Closing Date
28 Nov 2025, 3:00 pmClosed
Block development Officer (V.P.)
Block Development Officer (V.P.)
Construction of compound wall and Paver block for Kabarsthan at Mevani
2025_RDTN_625563_1
Roc No 4564/2025/B1 date 21.11.2025
Open Tender
Civil Works
Item Rate
120 days
Mevani
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹27,300
Yes
2 Dec 2025
22 Nov 2025
28 Nov 2025
22 Nov 2025
28 Nov 2025
22 Nov 2025
Amount
Earth work excavation for foundation in all soils and sub soils and full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting,and baling out water wherever necessary and refilling in sides of foundation with excavated more than 15cm thick
Collection and supply of sand and filling in to the basement including cost and including cost and conveyance of all materials to site and labour charges etc complete
Cement conceret 1:4:8 mix using 40mm ISS gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers morethan 15cm thick
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete
Reinforced Cement Concrete in 1:1.5:3 mix using 20mm metal including cost and conveyance of all materials to site and labour charges etc complete
Brick work in following Cement Mortar using best quality Fly ash bricks of size 23x11x7cm for foundation and basement including curing etc.,complete complying with standard specification.
Plastering in CM 1:5, 12mm thick including cost and conveyance charges etc.,
Painting two coats over NEW Plastered surface using Approved Quality of Exterior Emulsion Paint including cost and all Labour charges etc., complete
Paver block Sub estimate
Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation.
Cement conceret 1:4:8 mix using 40mm ISS gauge hand broken hard granite stone jelly for foundation including dewatering if found necessary and laid in layers morethan 15cm thick
Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete
Plain Cement Concrete 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials and labour charges etc. complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying interlocking paver block of 80mm thick including all other labour charges etc
Provision For Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SHREE VEERAIYAN CONSTRUCTIONS (BID ID -1522849)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748051.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
techbit.pdf
Tender Documents • 0.34 MB
BOQ_748051.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .