Tender Value
₹6.5 Cr
EMD Value
₹6.5 L
Closing Date
5 Apr 2022, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT - NABARD XXVII 2021-22 - Hosur Block Construction of Bridge across Thenpennai River of Chokkarasanapalli Belathur Road Package No- TN-04-KRI-18
2022_RDTN_224874_1
Go_10_2021_SGS1_Date_31_01_22
Open Tender
Civil Works - Bridges
Item Rate
540 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹6.5 L
DRDA Krishnagiri
11 Apr 2022
10 Mar 2022
5 Apr 2022
10 Mar 2022
5 Apr 2022
10 Mar 2022
15 Mar 2022
Amount
Construction of Bridge across Thenpennai River of Chokkarasanapalli Belathur Road.
Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER ABUTMENTS & PIERS.
Earthwork excavation in Medium Rock & Dense Medium rock not requiring blasting except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for (OPEN FOUNDATION, CUT OFF WALL) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL.
Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for TOE / CUT OFF WALL.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for below ABUTMENT, WNGS and PIERS.
Vibrated Cement Concrete of grade M 20 Design Mix using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for TOE WALL / CUT OFF WALL.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RIGID APRON
Vibrated Cement Concrete of grade M 20 Design Mix using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RIGID APRON.
Providing and making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire Mesh Gabion Boxes as per IS 16014 : 2012, MORTH Clause 2500, of required size, Mesh Type 10 x 12 (D=100mm with tolerance of +- 2 % ) Zinc Coated, Mesh Wire diameter 3.0 mm, mechanically edged / selvedged with partitions at every 1 m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2 mm, supplied @ 3 % by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per direction of Engineer-in-Charge
Vibrated reinforced Cement Concrete of grade M 35 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for footing under ABUTMENT, WNGS and PIERS
Vibrated reinforced cement concrete M 35, Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS BELOW SILL LEVEL -
Vibrated reinforced cement concrete M 35, Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications , for SUBSTRUCTURE OF ABUTMENTS and WINGS ABOVE SILL LEVEL -
Vibrated reinforced Cement Concrete of grade M 35 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Below SILL LEVEL
Vibrated reinforced Cement Concrete of grade M 35 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Circular Column Pier Above SILL LEVEL
Vibrated Reinforced Cement Concrete M 35, Grade, design mix using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS.
Vibrated reinforced Cement Concrete of grade M 35 Design Mix using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for RCC Capping Beam above Column Pier
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND RETURNS.
Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.
Vibrated reinforced cement concrete M 35, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB, KERB .
Vibrated Reinforced Cement Concrete M-40, using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for CRASH BARRIER
Vibrated reinforced cement concrete M 30 Grade, Design Mix using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APROACH SLAB.
Vibrated Cement Concrete M20 grade design Mix using 20&12 mm mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete,working at heights for parapet over Wing Wall.
Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.
Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges " Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.
Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings
Provinding and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASECOURSE BELOW APPROACH SLAB.
Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for wearing coat of 75mm uniform thickness over deck slab and approach slab.
Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.
Provision for Approach Road
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 3km for formation of Approach Road.
98% COMPACTION
100% CO0MPACTION
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading III of MORTH Revision IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the specifications For Sand, Gravel & 6 mm Aggregate Mix
Provding and Laying Water bound macadam Grading - II consisting of clean crused aggregates mechanically interlocked by rolling and bonding together with Screening binding materials and finised in acordance with the requirements of the specifications and thickness as per approved plans or as directed by engineer.
Provding and Laying Water bound macadam Grading -III consisting of clean crused aggregates mechanically interlocked by rolling and bonding together with Screening binding materials and finised in acordance with the requirements of the specifications and thickness as per approved plans or as directed by engineer.
Proivding and laying of Tack coat using Emulsion Bitumen at the rate of 4.0kg/sq.m over the promer treated WBM surface preparatory to another construction over it.
Provding and laying Compacting open grade Premix carpet 20 mm thick with a liquid seal coat which shall consist of open graded carpet of 20 mm thickness in a single course composed of suitable small size aggregates premixed with 60/70 Grade of Bituminous binder with application of liquid seal coat for sealing the voids in a bituminous surface conforming to the specifications.
Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.
Provision for Approach Road CC Pavement
Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer using Carted Eath with a lead of 3km for formation of Approach Road.
98% COMPACTION
100% CO0MPACTION
Providing and Laying Granular Sub base as per table No 400-1/400-2 and Grading III of MORTH Revision IV with and any other Granular material or a combination those of for 150 mm thick to give a CBR of 20 on prepared sub grade in accordance with the requirements of the specifications For Sand, Gravel & 6 mm Aggregate Mix
Vibrated Cement Concrete of grade M 15 Nominal Mix using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for approach road base Course
Vibrated Plain Cement Concrete of grade M 20 Design Mix\ using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications approach road wearing coat
Provision for RCC Retaining wall
Earthwork excavation in all calsses of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION OF RETAINING WALLS. -1 Cu.m
Vibrated Cement Concrete of Grade M-15, Nominal Mix,using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELLING COURSE BELOW FOOTINGS OF RCC RETAINING WALLS.-1 Cum.
Vibrated Cement Concrete of Grade M-30, Design Mix, using 20mm & 12mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOOTINGS OF RCC RETAINING WALLS.
Providing and fixing PVC seepage pipes of 100mm dia. PVC pipes of requied lengths for abutments and wngs including cost and conveyance of all materials to work site, cost and labour for 900mm dia. semi-spherical back fill arangements with 100mm size broken ganite chips at the periphery and labour charges for fixing, etc.,to drain of the backfill IN BETWEEN THE RETAINING WALLS, -
Vibrated Cement Concrete of grade M30 Design Mix using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for STEM OF RETAINING WALLS-
Supply and Fabrication of High Yield Strength Deformed Bar with Grade Designation Fe-500, conforming to IS:1786-1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the rods straightening, cutting, bending, tying grills, including overlapping to the required length wherever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc, complete,Fe-500 grade.
Provision for PCC Retaining wall
Earthwork excavation in all calsses of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS208, including cost of all labour, equipments and all incidental charges such as providing and maintaining necessary cofferdams, sheeting,shoring, bracing, and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc, complete as per relevant standard specification for FOUNDATION UNDER RETAINING WALL
Vibrated Cement Concrete of Grade M-15, Nominal Mix,using 20mm HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for FOUNDATION BELOW
Vibrated Plain Cement Concrete of grade M 20 Design Mix\ using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placinbg in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., ciomplete as per standard specifications for RETAINING WALL FOUNDATION
Vibrated Cement Concrete of Grade M-15, Nominal Mix,using 20mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL
Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size b
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VEDIAPPAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .