| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.8 CrAdmitted-Finance | -22.71% | ₹3.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.8 Cr+₹4.6 L (1.22%)Admitted-Finance | -21.77% | ₹3.8 Cr+₹4.6 L (1.22%) | L2 | Admitted-Finance |
| 3 | L3₹4.0 Cr+₹24.3 L (6.47%)Admitted-Finance | -17.71% | ₹4.0 Cr+₹24.3 L (6.47%) | L3 | Admitted-Finance |
| 4 | L4₹4.0 Cr+₹25.4 L (6.74%)Admitted-Finance 78 NEAR CHOPAL VILLAGE NIZAMPUR DISTT PANIPAT | PANIPAT | HARYANA | -17.50% | ₹4.0 Cr+₹25.4 L (6.74%) | L4 | Admitted-Finance |
| 5 | L5₹4.3 Cr+₹51.5 L (13.7%)Admitted-Finance | -12.13% | ₹4.3 Cr+₹51.5 L (13.7%) | L5 | Admitted-Finance |
Tender Value
₹4.9 Cr
EMD Value
₹9.7 L
Closing Date
27 Jul 2026, 6:00 pmClosed
Addl. Chief Engineer PWD Zone - I Jodhpur
Addl. Chief Engineer PWD Zone - I Jodhpur
Const. of Bridge on Gudha Jetsingh River
2026_CEPWD_570314_6
NIT No 05 of 2026-27 ACE PWD Zone I Jodhpur
Open Tender
Civil Works - Bridges
Percentage
240 days
Pali
As per Tender documents
7 documents required · 7 mandatory
₹5,000
As per Tender documents
₹9.7 L
Yes
14 Aug 2026
23 Jun 2026
28 Jul 2026
23 Jun 2026
27 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Const. of bridge on Gudha Jetsingh river
CD Work 23 span 8.00 mtr
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per MoRTH Specification Clause 202. By Mechanical Means Cement Concrete | 472.5 | cum | 252 | ₹1,19,070 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per MoRTH Specification Clause 202. Rubble Stone Masonry in Cement Mortar | 1,543.5 | cum | 155 | ₹2,39,242.5 |
| 3 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 In ordinary soil Depth upto 3 metre. | 6,434.71 | cum | 161 | ₹10,35,988.31 |
| 4 | Earth work in excavation for foundation of structure complete with all lift, dewatering, shoring and shuttering etc. including refilling of trenches in 250 mm layers, ramming, watering and disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth as per MoRTH specification Clause 301 to 305 In hard soil Depth upto 3 metre | 4,201.23 | cum | 209 | ₹8,78,057.07 |
| 5 | Providing and laying Cement concrete for plain/reinforced concrete in open foundation as per drawing and technical specification as per MoRTH Specification : Section 1500, 1700 & 2100 including form work at any level. P.C.C. grade M15 | 1,311.32 | cum | 3,100 | ₹40,65,092 |
| 6 | Stone masonry work in cement mortar 1:3 with mechanical mixer for foundation (any level) complete, including all scaffolding etc. but excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 Random rubble masonry | 1,672.41 | cum | 2,877 | ₹48,11,523.57 |
| 7 | Stone masonry work in cement mortar 1:3 with mechnical mixer for foundation complete including all scaffolding etc. excluding pointing and plastering as per drawing and technical specification as per MoRTH Specification : Section 1000,1400 Random rubble masonry (coursed/uncoursed) Upto 5 metre height | 3,463 | cum | 2,992 | ₹1,03,61,296 |
| 8 | Structural Cement concrete for reinforced concrete in superstructure at any level complete including steel formwork, scaffolding etc. as per drawing and technical specification as per Design mix MoRTH Specification 1500 & 1700. M 25 grade solid slab superstructure | 1,372.44 | P. Cum | 4,548 | ₹62,41,857.12 |
| 9 | Supplying, fitting, and placing HYSD bar reinforcement (Primary Steel) in Foundation, Substructure and superstructure at any level complete as per drawing and MoRTH specifications Clauses 1009,1600 and 2302 | 97.8 | P.MT | 80,077 | ₹78,31,530.6 |
| 10 | Providing A.C pipe Weep holes 150mm dia in Masonry/Plain Concrete/.Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specfication as per MoRTH Specification Clause 2205 | 488.4 | P.mtr | 186 | ₹90,842.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.23 MB
Tendernotice_2.pdf
PDF • 3.77 MB
Tendernotice_3.pdf
PDF • 8.63 MB
BOQ_Pali_16.xls
Tender Documents • 0.31 MB
Technical_Pali_16.pdf
Tender Documents • 0.89 MB
BOQ_1015018.xls
BOQ • 0.31 MB
CorrigendumDateExtend.pdf
PDF • 0.64 MB
2Agreement01Jan2023_Pali_16.pdf
PDF • 7.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .