Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAccepted-Finance | L1 | Accepted-Finance As per BOQ comparative | |
| 2 | L1₹11.2 LAccepted-Finance | L1 | Accepted-Finance As per BOQ comparative | |
| 3 | L1₹11.2 LAccepted-Finance LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH OFFICE OF THE EXECUTIVE ENGINEER RURAL ENGINEERING WING LEH | L1 | Accepted-Finance As per BOQ comparative | |
| 4 | L2₹12.0 L+₹79,915.70 (7.14%)Accepted-Finance | L2 | Accepted-Finance As per BOQ comparative | |
| 5 | L3₹13.1 L+₹1.9 L (16.6%)Accepted-Finance SAKTI LEH | L3 | Accepted-Finance As per BOQ comparative |
Tender Value
₹16 L
EMD Value
₹32,000
Closing Date
5 Jul 2021, 4:00 pmClosed
Executive Engineer SSD Nobra
Office of the Executive Engineer SSD Nobra
Construction of PCC side drain and extension of culvert in internal road to Hunder village at various spot. under Capex.
2021_PWD_3444_3
SSD/N/33 of 2021-22
Open Tender
Civil Works - Roads
Item Rate
60 days
Nobra
Please refer to tender document.
6 documents required · 6 mandatory
₹1,000
Yes
Payable To Executive Engineer SSD Nobra
₹32,000
Yes
16 Jul 2021
19 Jun 2021
7 Jul 2021
19 Jun 2021
5 Jul 2021
19 Jun 2021
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil :70%
Dry stone pitching (any thickness) excluding cost of stones.On Horizontal
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)incl cost of cement carriage.
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)incl cost of cement carriage
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) incl cost of cement carriage.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.incl material and carriage complete.
Centering and shuttering including strutting, propping etc. and removal of form work for: a. Foundations, footings, bases for columns
b.Columns, piers, abutments, pillars, posts and struts
c. Suspended floors, roofs, landings, balconies and access platforms.
d. Edges of slabs and breaks in floors and walls Under 20 cm wide
Providing and laying of MS pipe for x-ing including trench excavation laying of pipe in proper slope refilling and making the surface good in carriage and cost of pipe complete job.(250mm dia).
Carriage of material by mechanical transport loading unloading complete job. a. Sand an avg lead 8 km.
b. Stone agg an avg lead 12 km.
c..Stone an avg lead 5km
M/S DHAMMO STANZIN JIKMET
M/S MOHAMMAD IBRAHIM
nazir hussain
M/S SONAM STOBDAN
M/S MOHD ISSAQ
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .