Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90.8 CrAccepted-AOC 4B TOWN SQUARE CHINAR PARK RAJARHAT KOLKATA 700 136 | ₹90.8 Cr | 1 | Accepted-AOC Emerged as successful bidder |
| 2 | 2₹97.8 CrRejected-AOC 14 BILASIPARA P O P S BILASIPARA DIST DHUBRI ASSAM PIN 783348 | DHUBRI | ASSAM | 783348 | ₹97.8 Cr | 2 | Rejected-AOC Did not emerge as successful bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
Tender Value
Refer Docs
EMD Value
₹1.6 Cr
Closing Date
4 May 2023, 1:00 pmClosed
Project Director AHIDMS
Sixmile Guwahati
Construction of 100 Bedded New District Hospital in Dudhnoi, Assam
2023_MDRDE_30017_1
IN-AHIDMS-345987-CW-RFB
Open Tender
Civil Works - Building
1825 days
Dudhnoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹25,000
Yes
₹1.6 Cr
Yes
Sixmile, Guwahati
2 Aug 2023
21 Mar 2023
4 May 2023
21 Mar 2023
4 May 2023
27 Apr 2023
21 Mar 2023 - 6 Apr 2023
31 Mar 2023
Amount
SALVAGE
Credit for Demolition of building structures etc.complete and taking away all fetched material out of campus within 30 days after completing demolition part except the C&D waste kept for recycling and used the recycle product for non structural work such as in foot path, manhole, lean concrete, filling under plinth, re-filling of foundation etc. or as approved by Engineer-in-charge complete in all respect. The serviciable material received from dismantling/demolishing to be kept with executing agency and take away from the site as per direction of engineer-in-charge. Note : This amount to be paid by agency to the department.Quote the lump sum amount (in minus)
CIVIL Works
Planning, Designing, and Construction on EPC Basis RCC framed structure building HOSPITAL (G+4) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building BMW & LAUNDRY BLOCK (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing, and Construction on EPC Basis RCC framed structure building MORTUARY & GAS MANIFOLD (G) ,with support services & allied facilities by incorporating stipulated specifications including handing over complete as per scope of work and directions of Engineer-in-charge by incoprating stipulated specification and adopting NBC-2016 norms , NMC norms & IS Codes and guidelines complete in all respect. Note :- Plinth Area shall be measured for the actual constructed.
Planning, Designing and construction of Civil External development works Levelling, Cement concrete pavement with vaccum dewatered concrete, Foothpath and pathway, External Sewerage, Filtered Water Supply, Distribution line, Peripheral grid 150 mm to 300 mm dia pipes, Unfiltered water supply distribution lines, Storm water drain, Rain Water Harvesting, Trenches for Services, Under ground Sump, Horticulture & Landscape, Earth Cutting/Filling Work, Boundary Wall, Campus Signage, Main Gate & Guard Room, Solar water heating system, Hyderopneumatic water supply system, Sewerage+effluent treatment plant , Water cooler, Tubewell, Sewage & drainage pump , Heat Pump for Water supply system , Electromechanical of WTP & RO System and ESS & Plant Room approval of the same by the Engineer- in-Charge
Planning, Designing and Construction on EPC Basis of INFRASTRUCTURE & EXTERNAL DEVELOPMENT – Electrical Works such as Electrical sub station ,DG set , UPS System, solar photo voltaic power generation system, IP based CCTV system, LAN System, IP based EPABX System, Audio Visual/Conference System, Street lighting with LED and Emergency Light and Illuminated digital signages with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of HVAC WORK with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Medical Gas Pipeline System with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Nursing call system with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Hospital curtain track system & I.V. tree system with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Planning, Designing, and Construction on EPC Basis of Solid waste management with support services & allied facilities by incorporating stipulated specifications, all services including handing over complete as per scope of work and directions of Engineer In charge.
Operation and Maintenance of Services Comprehensive Operation & Maintenance Contract (CMC) Charges for 5 years comprehensive warranty for followings services which will run concurrently with DLP of 12 Months. (i). MGPS
For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
For 5th year (After Four Year Of DLP)
STP,WTP,ETP , FIRE PUMP: Operation & comprehensive maintenance STP,WTP, ETP , FIRE PUMP units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance
For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
For 5th year (After Four Year Of DLP)
Lifts:Operation & comprehensive maintenance LIFT units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumables, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance
For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
For 5th year (After Four Year Of DLP)
ESS, DG SETS, TRANSFORMER: Operation & comprehensive maintenance ESS, DG SETS units after three year warranty charges/maintenance. Operator shall be available at plant 24X7. The rates shall be inclusive of all spare, accessories, consumbles, manpower, tools and tackles , replacement of parts,(except fuel , power and water) including routine servicing and maintenance of equipment etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance
For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
For 5th year (After Four Year Of DLP)
HVAC: Operation & maintenance (routine & preventive ) and breakdown maintenance of high side & low side of the HVAC System comprising of all the machinery, equipment installed etc complete in all respect as per direction of Engineer in charge. Operation& Maintenance
For 1st year (Concurrently with DLP of 12 Months)
For 2nd year (After One Year Of DLP)
For 3rd year (After Two Year Of DLP)
For 4th year (After Three Year Of DLP)
For 5th year (After Four Year Of DLP)
SHREE GAUTAM CONSTRUCTION CO. LTD.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid