Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
18 Nov 2026, 3:00 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Municipal Commissioner
444,Thiruvengadam salai Sankarankovil
Providing drinking water distribution pipeline at vani street in sankarankovil municipality
2026_MAWS_717971_4
0128/2026/E2
Open Tender
Maintenance Works
Works
45 days
Sankarankovil Municipality
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,000
26 Oct 2026
26 Oct 2026
18 Nov 2026
26 Oct 2026
18 Nov 2026
26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 591 | Cum | 1.25 | ₹738.75 |
| 2 | Labour for cutting open road for laying water mains or sewer including cost and conveyance all materials to site and all labour charge etc complete. | 166 | Cum | 1.25 | ₹207.5 |
| 3 | Supply and Delivery of pipe and Specials including cost and conveyance of all materials to site etc,complete 63mm PVC Pipe | 1,200 | Rm | 1.25 | ₹1,500 |
| 3.01 | 63mm PVC Cupler | 10 | Nos | 1.25 | ₹12.5 |
| 3.02 | 63 mm PVC Elbow | 10 | Nos | 1.25 | ₹12.5 |
| 3.03 | 63 mm PVC Bend | 10 | Nos | 1.25 | ₹12.5 |
| 3.04 | 63 mm PVC Tee | 10 | Nos | 1.25 | ₹12.5 |
| 3.05 | 63mm PVC End Cap | 10 | Nos | 1.25 | ₹12.5 |
| 4 | Towards labour charge for laying with PVC Pipes & Specials including cost and conveyance materials to site and all labour charge etc complete. | 1,200 | Rm | 1.25 | ₹1,500 |
| 5 | Re-Filling excavated earth including cost and conveyance all materials to site and all labour charge etc complete. | 760.53 | Cum | 1.25 | ₹950.66 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_862408.xls
BOQ • 0.37 MB
corrigendum.pdf
PDF • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .