All Bids
RequiredManufacturer / The valid registration certificate of Class-I to Class-III up to 20.00 lakhs works (Electrical), As per G.O Ms No.21 I & CAD Dept. Govt. Dt. 13-04-2017 & As per G.O Ms No.94 I & CAD Dept. Govt. Dt. 01-07-2003 and Electrical Contractors Electrical Grade-A or Grade-B License
RequiredPAN Card
RequiredRegistration under GST
RequiredThe contractor /Manufacturer should have similar experience in supply, installation &Commissioning of Nature switches i.e., 50% of ECV in any one financial year of the last (10) FY within the block period. The bidder should enclose experience certificates issued by not below the rank of EE or equivalent and countersigned by the officer of the rank of SE and OEM/ULBs state/central DP
Required1.0 % EMD drawn in favour of the Commissioner, GHMC payable at Hyderabad in the form of Online Payment/ Challan Generation
RequiredThe tenderer who have quoted more than 25% less over ECV has to upload the DD towards ASD, the DD should be drawn after tender notification in favour of Commissioner, GHMC. If the tenderer who ever quoted less below 25% of ECV should upload the undertaking letter. Undertaking Format is enclosed in the terms and conditions
RequiredCommitment letter (L1 bidder should produce 10% Bank Guarantee at the time of concluding agreement). Format is enclosed in the terms and conditions
RequiredConsent Letter (The successful bidder (L1) should complete the work for supply, installation & Commissioning of CCMS Boxes within 30 days from date of LOI if fails awarded work automatically get cancelled). Format is enclosed in the terms and conditions
RequiredContractor has to submit single D.D from concern agency only. If not, the Agency will be rejected.
RequiredEven though the tender meet the above qualification criteria , they are subject to be disqualified if they have made misleading or false representation in the forms, statements and attachments submitted in proof of the qualification requirements : and /or record of proof performance such as abandoning the works, not properly completing the contract inordinate delays in completion , litigation
RequiredThe bidder should upload required documents only as per tender conditions if uploaded un necessary documents, the agency will be rejecte
RequiredVerification Protocols: The Contractor shall produce detailed verification protocols for all citizen participants. Verification shall include either physical verification or video call verification, supported by valid identity proof issued by any Government authority.
RequiredThird-Party Engagement: The Contractor shall engage independent and credible third-party agencies to carry out the verification and social audit processes to ensure transparency and authenticity
RequiredPenalties for Manipulation: In the event that any manipulation, falsification, or irregularity is detected in the social audit or verification process at any stage, suitable penalties shall be imposed on the Contractor, which may include blacklisting and other actions as deemed appropriate by the Competent Authority