| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.8 LAccepted-Finance 00 JAMO GORIGANJ GALLAMANDI AMETHI UTTAR PRADESH SULTANPUR UTTAR PRADESH 227801 | AMETHI | UTTAR PRADESH | 227801 | ₹31.8 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹33.0 LRejected-Finance | ₹33.0 L | L2 | Rejected-Finance Upper |
Tender Value
₹32.7 L
EMD Value
₹3.3 L
Closing Date
18 May 2026, 5:00 pmClosed
EXECUTIVE OFFICER
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Construction work IN NPP LONI WORK NO 4
2026_DOLBU_1147901_4
323/NPPLONI/2026-27 DATED 11-05-2026
Open Tender
Civil Works
60 days
NAGAR PALIKA PARISHAD LONI GHAZIABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,894
EXECUTIVE OFFICER
₹3.3 L
26 May 2026
13 May 2026
19 May 2026
13 May 2026
18 May 2026
13 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | E/W in cutting or in embankment in ordinary soil excavation to be in the from of regular pits not be exceeding 0.50 m in depth and earth work in embankment to be in 20 cm. Layers including ramming and dressing the surface to required levels and slop and also including 1.5 m. lift and up to 8 km .SI NO. 253A+261B+231B | 936.38 | CUM | 365 | ₹3,41,778.7 | - |
| 2 | P.C.C.(1:6:12) cement fine sand and brick Ballast 4cm in foundation and under floorsincluding supply of all materials labour tools and plants etc. required for proper completion of the work. s.i no 273 | 24.6 | CUM | 4,000 | ₹98,400 | - |
| 3 | Supplying, fiting and placing HYSD bar reinforcement in Foundation Complete as per Drawing and technical specifications Clause 1000 and 1202 | 33.5 | QTL | 8,700 | ₹2,91,450 | BI01010001010000000000000515BI0100001113 |
| 4 | R.C.C. Work with cement, approved coarse sand & 2 cm (3/4") guage approved stone ballast in proportions of 1:1.5:3 in R.C.C,SLAB excluding supply of reinforcement and its bending. But including its fixing and binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, tools & plants etc. required for proper completion of the work Excluding cost of binding wire. si no. 284 new item slab | 60.96 | CUM | 8,850 | ₹5,39,496 | BI01010001010000000000000515BI0100001113 |
| 5 | Construction of granular sub base (GSB) by providing coarse grade material spreading in uniform layers with mortar grade on prepared surface mixing by mix in place method with rotavetar at OMGSB/RBM spreaing in uniform layor mortar grader on prepared surface mix in place method with rotavaror at OMC at compacting with vibratory roller to achive the desired complete surface. | 92.7 | CUM | 3,998 | ₹3,70,614.6 | BI01010001010000000000000515BI0100001113 |
| 6 | Construction of un-reinforced. plain cement concrete pavement, Thickness as per design, over a prepared sub base with 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade)(1.1½.3) coarse and fine aggregates confirming to IS 383 maximum size of coarse aggregate not exceeding 25mm. mixed in a concrete mixer of not less then 0.2 cum capacity and appropriate weight batcher using approved mix design, laid in approved fixed side form work (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels. rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, admixtures as approved curing of concrete slabs for 14-days, curing compound (Where specified) and water finishing ro lines and grade as per drawing and finishined with power Trowel CUM floter -Trimix Flooring machine Technical specification Clause 1501 SI NO.20.14(a) | 139.05 | SQM | 8,050 | ₹11,19,352.5 | - |
| 7 | Supply of fixing of Board | 1 | NO | 7,500 | ₹7,500 | BI01010001010000000000000515BI0100001113 |
| 8 | GST | 18 | Percent | - | - | BI01010001010000000000000515BI0100001129 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_2148070.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid