Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.9 L+₹22,199.93 (13.4%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹2.2 L
EMD Value
₹4,400
Closing Date
13 Aug 2026, 4:00 pmClosed
XEN REW Kathua
XEN REW Kathua
Const.of r/wall with levelling at fronti near sheetla mandir w no 4 and Constt. Of pacca lane at palyee mohalla W.no.3 Panchayat Barmota Block Bani
2026_RDPR_319901_36
e-NIT No.175/REW/K of 2026-27 Dated 07/08/2026 2nd call
Open Tender
Civil Works
Percentage
90 days
BANI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Rural Development and Panchayati Raj
₹4,400
7 Sept 2026
7 Aug 2026
14 Aug 2026
7 Aug 2026
13 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 8.5 | m3 | 479.3 | ₹4,074.05 |
| 2 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 45.88 | m3 | 256.85 | ₹11,784.28 |
| 3 | Dry stone pitching (any thickness) excluding cost of stones.on Horizontal | 8.5 | m³ | 1,235.55 | ₹10,502.18 |
| 4 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) | 0.87 | m³ | 5,402.9 | ₹4,700.52 |
| 5 | Dry random rubble masonry with hard stone in foundation and plinth: With bond stone. | 11 | m³ | 2,793.8 | ₹30,731.8 |
| 6 | CEMENT CONCRETE (CAST-IN-SITU) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 20 % plumb | 4 | m³ | 4,774.46 | ₹19,097.84 |
| 7 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 5.5 | m³ | 6,591.25 | ₹36,251.88 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form work for : foundations, footings, bases for columns | 22.3 | m2 | 286.35 | ₹6,385.61 |
| 9 | carriage of sand and aggregate by 60kms averge by MT and 2500mt by AT | 14 | cum | 3,193.02 | ₹44,702.28 |
| 10 | carriage of Stone for soiling and R.R masonary by 1 Kms by AT | 21.4 | cum | 1,212.68 | ₹25,951.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.91 MB
BOQ_1061664.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .