Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.4 LAdmitted-Finance | -26.01% | ₹9.4 L | L1 | Admitted-Finance |
| 2 | L2₹9.7 L+₹26,800.57 (2.85%)Admitted-Finance | -23.90% | ₹9.7 L+₹26,800.57 (2.85%) | L2 | Admitted-Finance |
| 3 | L3₹11.4 L+₹2.0 L (20.9%)Admitted-Finance DAPALI PAVWA BAHRAICH UP INDIA | -10.57% | ₹11.4 L+₹2.0 L (20.9%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical AS PER DOCS |
Tender Value
₹12.7 L
EMD Value
₹25,403
Closing Date
14 Aug 2026, 3:00 pmClosed
CHIEF ENGINEER
1 SAROJINI NAYDU MARG CIVIL LINE PRAYAGRAJ
Zone-08 Ward-52 Havelia R K Puram me Rajendra Shukla ke makan se Ram Shiromani Yadav ke makan tak CC sadak, nali aur puliya nirmaan karya.
2026_NNAMC_1174183_17
40 work of 14.08.2026
Open Tender
Civil Works
Percentage
60 days
CIVIL LINE
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,535
AS PER DOCS
₹25,403
15 Sept 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
14 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of existin damaged brick nali and including stacking of materials with all complete work | 12.67 | cum | 468 | ₹5,929.56 |
| 2 | Earth work Exavation in foundation as in wet and foul position lead lift &30 m lead with aqll complete work (S.I.No.251) | 54.26 | cum | 160 | ₹8,681.6 |
| 3 | PCC 1:6:12 cement sand and 40mm brick ballast and all compelte the work (s.I.No.-273) | 12.4 | Cum | 3,500 | ₹43,400 |
| 4 | M-150 brick work (1:4) cement sand mortor including all complete work (S.I.No.303) | 37.74 | cum | 5,300 | ₹2,00,022 |
| 5 | Struck Pointing (1:2) cement sand mortor including all complete work (S.I.No.574) | 204 | sqm | 197 | ₹40,188 |
| 6 | Flush pointing (1:2) cement sand mortor including all complete the work (S.I.NO.575) | 61.2 | Sqm | 166 | ₹10,159.2 |
| 7 | Dismentling of existin enchrochment CC and inding stacking of materials with all complete work | 30.6 | Sqm | 936 | ₹28,641.6 |
| 8 | Earth work cutting in ordinary soil up to 1.5 m lift &30m led with all complete work (S.I.No.253) | 34.58 | cum | 87.3 | ₹3,018.83 |
| 9 | Construction of Granular Sub base (G.S.B) by providing closed graded material mixing by mix in place method including water and compacting with vibratory rollers as per MORT& H specification401 | 95.78 | cum | 1,654.8 | ₹1,58,496.74 |
| 10 | of 100 micron polythelene under the foundation & floor for anti saltpeter treatment i/c supply of all materials, labour T&P required for proper completion of the work New item | 408 | sqm | 74.88 | ₹30,551.04 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tendernotice_2.pdf
PDF • 1.51 MB
BOQ_2206442.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .