| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 CrAccepted-AOC DEVKHATIYA GHAZIPUR | GHAZIPUR | UTTAR PRADESH | 232325 | ₹8.4 Cr | L1 | Accepted-AOC Admitted |
| 2 | L2₹8.8 Cr+₹30.7 L (3.63%)Rejected-Finance | ₹8.8 Cr+₹30.7 L (3.63%) | L2 | Rejected-Finance Not Admitted |
| 3 | L3₹9.6 Cr+₹1.1 Cr (13.3%)Rejected-Finance | ₹9.6 Cr+₹1.1 Cr (13.3%) | L3 | Rejected-Finance Not Admitted |
| 4 | L4₹11.3 Cr+₹2.9 Cr (33.8%)Rejected-Finance AT NAVAKAPURA BADI BAG LANKA GHAZIPUR UTTAR PRADESH PINCODE 233001 BRACH OFFICE ADD VILL PO KULHARIYA BLOCK DISTRICT BUXAR STATE BIHAR PINCODE 802101 | BUXAR | BIHAR | 802101 | ₹11.3 Cr+₹2.9 Cr (33.8%) | L4 | Rejected-Finance Not Admitted |
Tender Value
₹11.3 Cr
EMD Value
₹22.6 L
Closing Date
10 May 2022, 12:00 pmClosed
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
S.E., Jaunpur-Ghazipur Circle, P.W.D., Jaunpur
Varanasi-Gorakhpur (NH-29) Marg Ke Chainage km. 69.730-86.900 tak Riding Quality ke Sudhar ka karya in Distt Ghazipur
2022_CEUVZ_694893_1
1004/SETender/jnp-gzp circle/22-23 date 16-04-2022
Open Tender
Civil Works
Item Rate
210 days
Jaunpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,590
₹22.6 L
Yes
Jaunpur
7 Jul 2022
30 Apr 2022
10 May 2022
30 Apr 2022
10 May 2022
30 Apr 2022
30 Apr 2022
Amount
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including cost of all material T&P , labour cess etc but excluding GST)
Providing and applying primer coat with emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
Providing and laying tack coat-1 with bitumen VG-10 using emulsion distributer at the rate of 0.25 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (II) (Including all material Bitumen T&P , labour cess etc but excluding GST)
Providing and laying dense graded bituminous macadam (grade-2) with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including all material T&P , labour cess etc but excluding GST)
Providing and laying tack coat-2 with bitumen VG-10 using emulsion distributer at the rate of 0.20 Kg / Sqm. on the prepared granular surface treated with primer and cleaned with hydraulic broom as per technical specification clause no. 503 (I) (Including all material Bitumen T&P , labour cess etc but excluding GST)
Providing and laying bituminous concrete (Grade-2) with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (Including all material Bitumen T&P , labour cess etc but excluding GST)
Construction of subgrade and earthen shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with (Lead upto 1 Km) all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement to Table 300-2 (Including cost of all material and Labour, all taxes and labour Cess etc but Excluding Cost of GST)
ANUKTA CONSTRUCTION
V S Y INTERNATIONAL PRIVATE LIMITED
M/S VINOD KUMAR RAI
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
97291877.htm
Tender Document • 0.03 MB
97291878.htm
Tender Document • 0.03 MB
97291879.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .