Tender Value
₹1.4 Cr
EMD Value
₹2.8 L
Closing Date
28 Jul 2026, 6:00 pmClosed
Superintending Engineer
Superintending Engineer W.R. Circle Baran
Repair and Renovation work of Digod Jagir Talab near village Digod Jagir Tehsil Chhipabarod District Baran
2026_WRDAS_575265_1
SE WR Circle Baran NIT NO-01/2026-27
Open Tender
Civil Works
Percentage
365 days
Baran
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
EE WR Division-II Chhabra
₹2.8 L
Yes
30 Jul 2026
16 Jul 2026
29 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. ordinary | 14,659.5 | Sqm | 1.45 | ₹21,256.27 |
| 2 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard soil mixed with kankar / boulders, morrum | 1,087.93 | Cum | 99 | ₹1,07,705.07 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m. and lift up to 1.5m. in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Soft / disintegrated rock | 1,813.22 | Cum | 134 | ₹2,42,971.48 |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated rock within initial lead of 50 m. and lift up to 1.5m. in dry or moist including dressing of excavated area, dewatering wherever required complete in all respect. Hard rock not requiring blasting | 362.64 | Cum | 201 | ₹72,890.64 |
| 5 | Hard rock (dry or moist ) requiring blasting(where hardness of rock is more than 2 )inclucing disposal of excavated material in the designated spoil bank / embankment and dressing of excavated material with all leads and & lifts of excavation and disposal . The contractor is free to use the usable excavated stone else where for which any transition expenditure & royalties , tax etc. if required to be paid then it will be liability of contractor as the cost of useable stone has already been deducted from the rate. | 362.64 | Cum | 361 | ₹1,30,913.04 |
| 6 | Preparation of foundation of structure including removal of all loose stones, silt and final washing. by manual labour | 267.12 | Cum | 23 | ₹6,143.76 |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20mm | 177.62 | Cum | 4,654 | ₹8,26,643.48 |
| 8 | Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (20 mm) (For mix design Cement content considered 320 kg/ cum of concrete) | 1,026.24 | Cum | 5,226 | ₹53,63,130.24 |
| 9 | Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; 20mm (For mix design Cement content considered 400 kg/ cum of concrete) 20mm | 442.01 | Cum | 5,744 | ₹25,38,905.44 |
| 10 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete) | 88.5 | Cum | 140 | ₹12,390 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
Tendernotice_2.pdf
PDF • 2.95 MB
BOQ_1023048.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].