| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-AOC | ₹10.9 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹11.1 L+₹17,333.10 (1.59%)Rejected-AOC | ₹11.1 L+₹17,333.10 (1.59%) | L2 | Rejected-AOC Rejected |
| 3 | L3₹11.1 L+₹19,145.18 (1.75%)Rejected-AOC | ₹11.1 L+₹19,145.18 (1.75%) | L3 | Rejected-AOC Rejected |
| 4 | L4₹11.2 L+₹24,573.59 (2.25%)Rejected-AOC | ₹11.2 L+₹24,573.59 (2.25%) | L4 | Rejected-AOC Rejected |
| 5 | L5₹11.2 L+₹30,271.19 (2.77%)Rejected-AOC NEDUNGULAM | THIRUVALLUR | TAMIL NADU | 600019 | ₹11.2 L+₹30,271.19 (2.77%) | L5 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | ILAVARASAN CONTRACTOR L14 | M SANKAR L12 | KUBERAN CONSTRUCTION PRIVATE LIMITED L4 | VETRI CONSTRUCTION AND DEVELOPERS L9 | C JEYAMURUGAN L7 | KARTHIGAISAMY L8 | suresh G L13 | K.Rajkumar L11 | P.SASIVARNAM L6 | IVR & CO L10 | V MEGAVARNAM L1 | MANGALANATHAN KANNAN L3 | POOGNANASINGHPRABU MALAIRAJ L2 | ALGARSAMY KAYAMBU L5 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00CONSTRUCTION OF COMPOUND WALL AT CHIEF MINISTER'S MINI STADIUM PARAMAKUDI IN RAMANATHAPURAM DISTRICT | |||||||||||||||||
| 1.01 | Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation. | 65.84 | Cum | 260 ₹17,118.4 | 245.31 ₹16,151.21 | 216 ₹14,221.44 | 224 ₹14,748.16 | 220.25 ₹14,501.26 | 223 ₹14,682.32 | 145 ₹9,546.8 Lowest | 263.78 ₹17,367.28 | 350 ₹23,044 | 250 ₹16,460 | 200 ₹13,168 | 210 ₹13,826.4 | 216 ₹14,221.44 | 223.55 ₹14,718.53 |
| 1.02 | Filling with clear M.sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete. | 6.56 | Cum | 2,050 ₹13,448 | 1,968.66 ₹12,914.41 | 4,510 ₹29,585.6 | 1,799 ₹11,801.44 | 1,767.56 ₹11,595.19 | 1,798 ₹11,794.88 | 1,800 ₹11,808 | 6,950 ₹45,592 | 2,300 ₹15,088 | 2,000 ₹13,120 | 100 ₹656 Lowest | 2,100 ₹13,776 | 1,736 ₹11,388.16 | 1,826.65 ₹11,982.82 |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance, labour charges etc. | 6.56 | Cum | 5,600 ₹36,736 | 5,498.58 ₹36,070.68 | 4,848 ₹31,802.88 | 5,026 ₹32,970.56 | 4,936.9 ₹32,386.06 | 5,025 ₹32,964 | 6,000 ₹39,360 | 5,378 ₹35,279.68 | 6,100 ₹40,016 | 5,300 ₹34,768 | 5,000 ₹32,800 | 4,750 ₹31,160 Lowest | 4,848 ₹31,802.88 | 5,066.85 ₹33,238.54 |
| 1.04 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance labour charges etc. | 31.58 | Cum | 6,050 ₹1,91,059 | 8,962.29 ₹2,83,029.12 | 5,139 ₹1,62,289.62 | 5,249 ₹1,65,763.42 | 5,156 ₹1,62,826.48 | 5,248 ₹1,65,731.84 | 6,000 ₹1,89,480 | 5,696 ₹1,79,879.68 | 6,400 ₹2,02,112 | 5,600 ₹1,76,848 | 5,600 ₹1,76,848 | 5,350 ₹1,68,953 | 5,063 ₹1,59,889.54 Lowest | 5,247 ₹1,65,700.26 |
| 1.05 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete | 33.72 | sqm | 540 ₹18,208.8 | 5,696.12 ₹1,92,073.17 | 448 ₹15,106.56 | 465 ₹15,679.8 | 456.75 ₹15,401.61 | 465 ₹15,679.8 | 516 ₹17,399.52 | 498 ₹16,792.56 | 1,200 ₹40,464 | 500 ₹16,860 | 400 ₹13,488 Lowest | 440 ₹14,836.8 | 449 ₹15,140.28 | 464.1 ₹15,649.45 |
| 1.06 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete | 95.93 | sqm | 950 ₹91,133.5 | 509.18 ₹48,845.64 Lowest | 898 ₹86,145.14 | 931 ₹89,310.83 | 914.32 ₹87,710.72 | 930.75 ₹89,286.85 | 1,100 ₹1,05,523 | 996 ₹95,546.28 | 900 ₹86,337 | 950 ₹91,133.5 | 800 ₹76,744 | 890 ₹85,377.7 | 898 ₹86,145.14 | 930.75 ₹89,286.85 |
| 1.07 | RCC 1 :1.5 : 3 mix using 20mm ISS HBG metal including cost and conveyance of all materials but excluding centering charges including labour charges for mixing laying concrete etc., complete | 25.81 | Cum | 9,240 ₹2,38,484.4 | 1,018.35 ₹26,283.61 Lowest | 7,346 ₹1,89,600.26 | 8,194 ₹2,11,487.14 | 8,049.4 ₹2,07,755.01 | 8,165 ₹2,10,738.65 | 7,800 ₹2,01,318 | 8,144 ₹2,10,196.64 | 9,400 ₹2,42,614 | 8,400 ₹2,16,804 | 8,000 ₹2,06,480 | 8,000 ₹2,06,480 | 7,905 ₹2,04,028.05 | 7,731.6 ₹1,99,552.6 |
| 1.08 | Supply and fabrication of steel for RCC works including cost and conveyance charges etc | 2.15 | MT | 90,500 ₹1,94,575 | 85,448.93 ₹1,83,715.2 | 75,342 ₹1,61,985.3 | 78,098 ₹1,67,910.7 | 76,720.28 ₹1,64,948.6 | 78,098 ₹1,67,910.7 | 90,000 ₹1,93,500 | 83,601 ₹1,79,742.15 | 92 ₹197.8 Lowest | 78,500 ₹1,68,775 | 75,000 ₹1,61,250 | 76,490.85 ₹1,64,455.33 | 75,342 ₹1,61,985.3 | 77,273.5 ₹1,66,138.03 |
| 1.09 | Plastering in CM 1:5, 12mm thick including cost and conveyance charges etc., | 542.65 | sqm | 280 ₹1,51,942 | 267.69 ₹1,45,261.98 | 236 ₹1,28,065.4 | 245 ₹1,32,949.25 | 240.34 ₹1,30,420.5 | 243.95 ₹1,32,379.47 | 350 ₹1,89,927.5 | 261 ₹1,41,631.65 | 290 ₹1,57,368.5 | 260 ₹1,41,089 | 220 ₹1,19,383 Lowest | 230 ₹1,24,809.5 | 236 ₹1,28,065.4 | 244.8 ₹1,32,840.72 |
Tender Value
Refer Docs
EMD Value
₹27,340
Closing Date
30 Jul 2026, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICER(B.PT)
PANCHAYAT UNION OFFICE, PARAMAKUDI
CONSTRUCTION OF COMPOUND WALL AT CHIEF MINISTER S MINI STADIUM PARAMAKUDI IN RAMANATHAPURAM DISTRICT
2026_RDTN_685749_2
PMK/SDAT-2026-27/A2/912/2026
Open Tender
Civil Works
Item Rate
120 days
PANCHAYAT UNION OFFICE PARAMAKUDI
PLEASE REFER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
₹27,340
17 Aug 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
30 Jul 2026
15 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1CONSTRUCTION OF COMPOUND WALL AT CHIEF MINISTER'S MINI STADIUM PARAMAKUDI IN RAMANATHAPURAM DISTRICT | |||||
| 1.01 | Earth work excavation and depositing on banks with initial lead and lift in gravelly soil stiff clay, hard stiff clay, murram, boulders mixed with gravel as per SS 20-B for foundation. | - | Cum | - | - |
| 1.02 | Filling with clear M.sand in foundation including cost & conveyance to site and labour charges for watering raming and all other incidental charges etc., complete. | 1 | Cum | - | - |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance, labour charges etc. | 1 | Cum | - | - |
| 1.04 | Brick work in CM 1:5 mix using country Bricks including cost and conveyance labour charges etc. | 1 | Cum | - | - |
| 1.05 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete | 1 | sqm | - | - |
| 1.06 | Supply and errecting sheet centering of size 90 cm x 60cm 10 G sheet laid over silver oak joist and supported by casurina post of size 10 cm x 13 cm dia spaced at 75 cm center to center etc. complete | - | sqm | - | - |
| 1.07 | RCC 1 :1.5 : 3 mix using 20mm ISS HBG metal including cost and conveyance of all materials but excluding centering charges including labour charges for mixing laying concrete etc., complete | 1 | Cum | - | - |
| 1.08 | Supply and fabrication of steel for RCC works including cost and conveyance charges etc | 1 | MT | - | - |
| 1.09 | Plastering in CM 1:5, 12mm thick including cost and conveyance charges etc., | 1 | sqm | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_824297.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
COMPOUND.pdf
Tender Documents • 0.71 MB
BOQ_824297.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .