Tender Value
₹8.7 L
EMD Value
₹17,400
Closing Date
31 Jul 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer (RD and PR) Zila Parishad Division, Bangana Distt. Una H.P.
Sh- Civil Work
2025_DRDPR_110928_1
Bangana 473-478-02
Open Tender
Civil Works
Item Rate
90 days
Una
Please refer tender documents
8 documents required · 8 mandatory
₹350
Executive Engineer(RD and PR) ZP Division Bangana
₹17,400
2 Aug 2025
25 Jul 2025
2 Aug 2025
25 Jul 2025
31 Jul 2025
25 Jul 2025
Amount
Excavation by Mechanical means(Hydraulic excavator )/manual means in foundation trenches etc. in earth work in all classifications of soil such as pick work ,pick jumper work , jumper blasting work , soft and hard blasting ,saturated soil , including chiseling or any other mixed variety of soil in all leads dewatering and or removal of slush and other incidentals , including stacking the excavated soil clear from the edge of excavation and than returning the stacked soil in all thickness of layers when required into plinths side of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in- charge with in all leads , lifts and other incidentals complete in all hiehgts . The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Excavation ,Supplying and filling of local earth (including Royality ) by mechanoical transport upto all leads and lifts including ramming , watering and consolidation of earth layers not exceeding 20 cm ( Twenty Centremetre ) in trenches ,plinth , sides of Foundatiopn and any other place within the boundary of Plot complete as per direction of Engineer-in- charge with in all leads , lifts and other incidentals complete in all hiehgts . The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing and laying Mechanically mixed and vibrated P C C 1:4:8( 1 cement :4 sand : 8 stone agg 40mm) One cement :for sand :eight stone agg forty and Nominal size curring complete in or under water including pumping or bailing out water /dewatering ,romooval of slush which may arise at the time of laying under water complete excluding cost of form work in Foundation and Plinth in all depth /hieghts as per HPPWD specifications and as directed by the Engineer In Charge including carriage of material with all leads ,lifts . The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing and laying Mechanically mixed and vibrated reinforced concrete work garde M25 ( M twenty five ) design mix to obtain minimum compressive strength of 25 N/mm2 ( Twenty Five n/mm2) with in cement contents of 400 kg /m3 (four hundred kg/m3) curring complete excluding the cost of form work and reinforcement for reinforced work in foundation footings ,basis of coumn ,walls ( any thickness) ,including attached pilastered ,buttresses ,plinth and string courses ,fillets pillers peirs ,abutments ,posts and struts etc upto all floor V level complete as per approved drawing ,design and specifications as per directions and entire satisfaction of the Engineer In Charge .einfircement .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .All works upto plinth level .
Providing and laying Mechanically mixed and vibrated reinforced concrete work garde M25 ( M twenty five ) design mix to obtain minimum compressive strength of 25 N/mm2 ( Twenty Five n/mm2) with in cement contents of 400 kg /m3 (four hundred kg/m3) curring complete excluding the cost of form work and reinforcement for reinforced work ,Beams ,Girders ,Bressurmers Cantilrvers and the like shelves and work tops etc upto all floor V level complete as per approved drawing ,design and specifications as per directions and entire satisfaction of the Engineer In Charge .einfircement .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing and laying Mechanically mixed and vibrated reinforced concrete work garde M25 ( M twenty five ) design mix to obtain minimum compressive strength of 25 N/mm2 ( Twenty Five n/mm2) with in cement contents of 400 kg /m3 (four hundred kg/m3) curring complete excluding the cost of form work and reinforcement for reinforced work s in column plinth level upto floor level five including pumping of concrete to site of laying but execluding cost of form work complete as per approved drawing ,design and specifications as per directions and entire satisfaction of the Engineer In Charge .einfircement .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing and laying Mechanically mixed and vibrated reinforced concrete work garde M25 ( M twenty five ) design mix to obtain minimum compressive strength of 25 N/mm2 ( Twenty Five n/mm2) with in cement contents of 400 kg /m3 (four hundred kg/m3) curring complete excluding the cost of form work and reinforcement for reinforced work s in vertical surface such as walls of any thickness work upto all floor level five including pumping of concrete to site of laying but execluding cost of form work complete as per approved drawing ,design and specifications as per directions and entire satisfaction of the Engineer In Charge .einfircement .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing and laying Mechanically mixed and vibrated reinforced concrete work garde M25 ( M twenty five ) design mix to obtain minimum compressive strength of 25 N/mm2 ( Twenty Five n/mm2) with in cement contents of 400 kg /m3 (four hundred kg/m3) curring complete excluding the cost of form work and reinforcement for reinforced work s in suspended floors., roofs , landings and their supports ,balconies beams work upto all level five floor including pumping of concrete to site of laying but execluding cost of form work complete as per approved drawing ,design and specifications as per directions and entire satisfaction of the Engineer In Charge .einfircement .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing from work with steel plates 3.15 mm (three decimal fifteen millimeter ) thick welded with angle iron in frame 30X30X5 mm (thirty into thirty into five millimeters )so as to give a fair finish including centering , shuttering ,strutting and propping etc. with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling & removal of same for in-situ reinforced concrete and plain concrete work in foundation s ,footings ,basis of column for mass conctret works as directed by the Egnineer In Charge including carrige of material with in all leads lifts upto floor leve V and other incidentals .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing from work with steel plates 3.15 mm (three decimal fifteen millimeter ) thick welded with angle iron in frame 30X30X5 mm (thirty into thirty into five millimeters )so as to give a fair finish including centering , shuttering ,strutting and propping etc. with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling & removal of same for in-situ reinforced concrete and plain concrete work in Walls (any thickness) including attachedpilasters, butteresses, plinth and stringcourses etc. ,upto floor level five and as directed by the Egnineer In Charge including carrige of material with in all leads lifts and other incidentals .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing from work with steel plates 3.15 mm (three decimal fifteen millimeter ) thick welded with angle iron in frame 30X30X5 mm (thirty into thirty into five millimeters )so as to give a fair finish including centering , shuttering ,strutting and propping etc. with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling & removal of same for in-situ reinforced concrete and plain concrete work in Suspended Floors , roofs , landings shelves and their supports , balconies beams ,girders, bressumers and cantilever for all floors levels V , complete as per direction of the Engineer-in Charge including carriage of material with in all leads ,lifts and ,upto floor level five and as directed by the Egnineer In Charge including carrige of material with in all leads lifts and other incidentals .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providing from work with steel plates 3.15 mm (three decimal fifteen millimeter ) thick welded with angle iron in frame 30X30X5 mm (thirty into thirty into five millimeters )so as to give a fair finish including centering , shuttering ,strutting and propping etc. with wooden battens and ballies for all heights of propping and centering below supporting floor to ceiling & removal of same for in-situ reinforced concrete and plain concrete work in edges of slabs and breaks in floors including carriage of material with in all leads ,lifts and ,upto floor level five and as directed by the Egnineer In Charge including carrige of material with in all leads lifts and other incidentals .The rate is including Octroi ,Royality ,Malkana,Toll tax Sale Tax,GST or any other taxes imposed by the Government .
Providiing and laying Tore steel of SAIL/TISCO/JINDAL/KAMDHENU/SHYAM STEEL reinforcement for thermo mechanicaly coated bars of grade Fe 550 D for reinforced cement concrete work including bending,bindind and placing in position complete .Including cost of binding wire and other incidentals for its completion upto all floor level Five complerte as per drawing ,desidgn and specificatrions and as per directions and enitre setisfaction of Engineer In Charge . Rates are icluding carraiage of material with in all leads lifts and other incidentals the rates are including Royality ,Octroie ,Toll Tax ,Slae Tax GST or any other tax imposed by the Government .
Brick work using 2 nd class common burnt clay F.P.S ( None modular ) building brick of class designation 7.5 in super structure upto all floor level upto floor level Five in cement mortar 1:6 ( 1 cement :6 sand ) and curring complete as per approoved drawing ,design and specifications and as per diections and intire satisfaction of theEngineer In Charge . Rates are icluding carraiage of material with in all leads lifts upto floor level V and other incidentals the rates are including Royality ,Octroie ,Toll Tax ,Slae Tax GST or any other tax imposed by the Government .
providing and applying 6 mm thick (6 milimetre ) thick cement plaster to ceiling with cement mortar 1:3 ( 1 cement : 3 sand ) upto all floor level (floor five ) complete as per approoved drawing design and specification and as per directions of the Engineer In Charge . Rates are icluding carraiage of material with in all leads lifts and other incidentals the rates are including Royality ,Octroie ,Toll Tax ,Slae Tax GST or any other tax imposed by the Government .
providing and applying 15 mm thick (Fifteen milimetre ) thick cement plaster with cement mortar 1:6 ( 1 cement : 6 sand ) in single coat on rough /fare sides of concrete /brcks and stone wall for interor/exteroir plaster upto all floor level (Floor Five ) complete as per approoved drawing design and specification and as per directions of the Engineer In Charge . Rates are icluding carraiage of material with in all leads lifts upto floor level V and other incidentals the rates are including Royality ,Octroie ,Toll Tax ,Slae Tax GST or any other tax imposed by the Government .
Providing and laying 300x450 mm 1 st qualty glazed tiles 8 mm thick of Orent /bell /nitco /Kajaria/in skirting , riosewrs ofg steps and dedo upto all floor level ( floor five level ) over 12 mm thick bed of cement mortar 1:3 ( 1 cement :3 sand ) and jointed with grey cement slurry @3.3 kg per sqmtr ,including pointing in white cement mixed with pigment of matching shade complete including carraige of material with all leads ,lift upto floor level five complete directions of the Engineer In Charge . Rates are icluding carraiage of material with in all leads lifts and other incidentals the rates are including Royality ,Octroie ,Toll Tax ,Slae Tax GST or any other tax imposed by the Government .
aman kumar (BID ID -540333)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .