Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.7 L+₹25,042.96 (4.56%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹6.2 L+₹65,976.97 (12.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹6.2 L+₹74,296.89 (13.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹6.3 L+₹82,284.01 (15.0%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹83,200
Closing Date
19 Jan 2026, 12:00 pmClosed
Chief Engineer
NAGAR NIGAM AGRA
Lohamandi Zone, Room No. 18, Ram Nagar, Subhash Nagar Construction of drain and interlocking pavement from Rinku gym to Rahul house via the water tank.
2025_DOLBU_1102330_1
24/12/2025/NAGAR NIGAM AGRA/12-01-2026/102
Open Tender
Construction Works
Percentage
30 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Nagar Nigam
₹83,200
19 Feb 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
19 Jan 2026
13 Jan 2026
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1 cement: 4 coarse sand)
P/L GSB with graded stone ballast with stone grit size stone ballast with hand ramming watering including all material labor T&P etc.all complete (NS)
Supply & fixing of pre-cast M-30 cement concrete RUBBER MOLD INTERLOCKING TILES over 40mm thick local sand bed, with 3mm thick joints filled with local sand including leveling, tempering and sweeping etc., interlocking bricks will be as description given in direction issued by the IRCSC-03-2004 and should be ISI marked all complete. (N.S.) 80mm thick, Strength should not less than M-30 (NS)
Cement plaster in fine sand : 12mm cement plaster of mix : 1:4 (1 cement : 4 fine sand)
1:2:4 (1 cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1.5:3 (1 cement: 1.5 coarse sand (zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS)
Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS)
Supply/Fixing of Black Granite Stone work display board. (NS)
Sub Total
Add/Deduction Rs. For Estimate Figure Amount Match
Grand Total
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 19.06 MB
BOQ_2033512.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .