Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.9 L+₹9,605.08 (2.00%)Rejected-Finance VILL P O AMJAI BARDHAMAN BARDHAMAN 713203 WEST BENGAL INDIA | BARDHAMAN | BARDHAMAN | WEST BENGAL | 713203 | L2 | Rejected-Finance L2 | |
| 3 | L3₹5.0 L+₹19,210.16 (4.00%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹4.8 L
EMD Value
₹6,100
Closing Date
3 Nov 2023, 11:00 amClosed
GENERAL MANAGER, JHANJRA AREA
OFFICE OF THE GENERAL MANAGER, JHANJRA AREA, PO-LAUDOHA, BO, DIST. - PASCHIM BARDHAMAN, PIN-713385
Transportation Installation of 74BL 2nd pump set 18XD pump set 20XD pump set with 360 mtr.4Inchdia pipeline n 7XD 3rd pump set with 150mtr 6 Inch dia pipeline at 3n4 incline unit jhanjra project colliery
2023_ECL_291553_1
ECL/GM/JNR/EnM/A2/23-24/44 DATED 17-10-2023
Open Tender
Miscellaneous Works
Item Rate
90 days
JHANJRA UNDERGROUND
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,100
4 Jun 2024
18 Oct 2023
4 Nov 2023
18 Oct 2023
3 Nov 2023
19 Oct 2023
18 Oct 2023 - 26 Oct 2023
Amount
Part A:- Transportation & installation of one no. 180mtr. head turbine pump-motor set with electrical at 74BL/-7D.
Loading, transportation & unloading of one 180mtr head turbine pump, 12mtr ISMB-200, DA-oxygen cylinder, chain pulley block, 6" dia valves(foot valve, slice valve, NR valve) from surface to 74BL/-7D(R-VII) with help of haulages. (Total distance--approx. 2500mtr.)
Loading, transportation & unloading of one 150kW/6.6kV 3-ph induction motor & one 150kW/6.6kV starter from surface to 74BL/-7D(R-VII) with help of haulages. (Total distance--approx. 2500mtr.)
Loading, transportation & unloading of one no. 6.6kV VCB & two nos. 30mtr. 6.6kV grade PVCDWA cable from surface to 74BL/-7D(R-VII) with help of haulages. (Distance--approx. 2500mtr.)
Loading, transportation & unloading of 3nos 6" dia. pipe bends & 30mtr. 6" dia. pipes from surface to 74BL/-7D(R-VII) with help of haulages. (Distance--approx. 2500mtr.)
Transportation-placing of drill panel, 100mtr 3.3kV grade PVC armoured cable, 100mtr drill cable & drill machine from 71L/19D(R-VII) to 74BL/-7D(R-VII). (Distance--approx. 1000mtr.
Making of pump-motor base frame by ISMB-200 with gas cutting at site.
Neccesary cleaning-leveling of floor for installation on pump set.
Base frame grouting at 74BL/-7D (R-VII) with drill machine.
Uplift of pump-motor on base frame & fitting-fabrication-allignment.
Laying-fitting-matching 30mtr 6" dia. pipe, 3nos bends and fitting-matching of 6" dia valves(foot valve, slice valve, NR valve) at suction & delivery side of pump & matching of delivery pipeline with existing 6" dia. pipeline at 74BL/-7D(R-VII) which is laid upto 7XD water sump.
Leakage checking & rectification of pump & pipeline.
Supply of Oxygen Cylinder
Supply of DA cylinder
Supply of MS Nut & Bolt of 5/8"x3"
Supply of 6" dia Foot valve
Supply of 6" dia Non-return valve
Supply of 6" dia Sluice valve
Part B:- Transportation & installation of one no. 120mtr. head turbine pump-motor set with electrical at 18XD/60L.
Loading, transportation & unloading of one 120mtr head turbine pump, 90kW 3-ph induction motor, DA-oxygen cylinder, chain pulley block, 4" dia valves(foot valve, slice valve, NR valve) from surface to 18XD/60L(R-VII) with help of haulages. (Total distance--approx. 1800mtr.)
Loading, transportation & unloading of 3nos 4" dia. pipe bends & 30mtr. 4" dia. pipes from surface to 18XD/60L(R-VII) with help of haulages. (Distance--approx. 1800mtr.)
Uplift of pump-motor on base frame & fitting-fabrication-allignment.
Leakage checking & rectification of pump & pipeline.
Laying-fitting-matching 30mtr 4" dia. pipe, 3nos bends and fitting-matching of 4" dia valves(foot valve, slice valve, NR valve) at suction & delivery side of pump & matching of delivery pipeline with existing 4" dia. pipeline at 18XD/60L(R-VII).
Supply of 4" dia Foot valve
Supply of 4" dia Non-return valve
Supply of 4" dia Sluice valve
Part C:- Transportation & installation of one no. 30mtr. head roto pump-motor set with electrical & 360mtr. 3" dia. pipeline at 20XD/66L
Loading, transportation & unloading of one 30mtr head roto pump, base frame & 9kW/550V 3-ph induction motor from surface to 20XD/66L(R-VII) with help of haulages. (Total distance--approx. 2000mtr.)
Loading, transportation, unloading & placing of 550V starter, 550V ACB & 100mtr. 3.3kV 35sq.mm cable from surface to 20XD/66L(R-VII) with help of haulages. (Total distance--approx. 2000mtr.)
Loading, transportation & unloading of 3nos 3" dia. pipe bends & 360mtr. 3" dia. pipes from surface to 20XD/66L(R-VII) with help of haulages. (Distance--approx. 2000mtr.)
Neccesary cleaning-leveling of floor and fitting-allignment of pump-motor-base frame.
Laying-fitting-matching 360mtr 3" dia. pipe, 3nos bends at suction & delivery side of pump. Delivery pipeline will be fitted upto 74L/-7D(R-VII).
Leakage checking & rectification of pump & pipeline.
Supply of MS Nut & Bolt of 5/8" X 2"
Part D:- Transportation & installation of one no. 180mtr. head turbine pump-motor set with electrical & 150mtr. 6" dia. pipeline at 7XD/40L
Loading, transportation & unloading of one 180mtr head turbine pump, 12mtr ISMB-200, DA-oxygen cylinder, chain pulley block, 6" dia valves(foot valve, slice valve, NR valve) from surface to 7XD/40L(R-VIIA) with help of haulages. (Total distance--approx. 900mtr.)
Loading, transportation & unloading of one 110kW/550V 3-ph induction motor & one 110kW/550V starter from surface to 7XD/40L(R-VIIA) with help of haulages. (Total distance--approx. 900mtr.)
Loading, transportation & unloading of one no. 550V ACB & 150mtr. 3.3kV grade 70sq.mm PVCDWA cable from surface to 7XD/40L(R-VIIA) with help of haulages. (Distance--approx. 900mtr.)
Laying-hanging of this 150mtr. 3.3kV grade 70sq.mm PVCDWA cable from 8XD sub-station to 7XD/40L(R-VIIA) ACB.
Loading, transportation & unloading of 5nos 6" dia. pipe bends & 150mtr. 6" dia. pipes from surface to 7XD/40L(R-VIIA) with help of haulages. (Distance--approx. 900mtr.)
Transportation-placing of drill panel, 100mtr 3.3kV grade PVC armoured cable, 100mtr drill cable & drill machine from 74BL/-7D(R-VII) to 7XD/40L(R-VIIA). (Distance--approx. 1600mtr.)
Making of pump-motor base frame by ISMB-200 with gas cutting at site.
Neccesary cleaning-leveling of floor for installation on pump set.
Base frame grouting at 7XD/40L(R-VIIA) with drill machine.
Uplift of pump-motor on base frame & fitting-fabrication-allignment.
Laying-fitting-matching 150mtr 6" dia. pipe, 5nos bends and fitting-matching of 6" dia valves(foot valve, slice valve, NR valve) at suction & delivery side of pump & matching of delivery pipeline with existing 6" dia. borehole at 9XD.
Leakage checking & rectification of pump & pipeline.
Supply of Oxygen Cylinder
Supply of DA cylinder
Supply of MS Nut & Bolt of 5/8"x3"
Supply of 6" dia Foot valve
Supply of 6" dia Non-return valve
Supply of 6" dia Sluice valve
Part E:- Civil foundation of this pump-motor set at 7XD/40L at R-VIIA seam
Recess cutting in stone for 180mtr Head pump
Cleaning of Debris/muck
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering
Centering and shuttering including strutting, propping etc and removal of form work for foundations, footings, bases for columns
Loading material into tub and unloading at site
Total impact of GST for the purpose of CTC
F.R. ENTERPRISE
N.K. ENTERPRISE
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .