Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.1 LAccepted-AOC 502 FLOWER VALLEY COMPLEX EASTERN EXPRESS HIGHWAY NEAR BANTA COMPOUND KHOPAT THANE WEST 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹40.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.2 LRejected-AOC | ₹40.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹40.4 LRejected-AOC OFF EASTERN EXPRESS HIGHWAY 6TH FLOOR 6 603 FLOWER VALLEY NITIN CADBURY FLYOVER KHOPAT THANE 400601 | THANE | THANE | MAHARASHTRA | 400601 | ₹40.4 L | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | ADITI CONSTRUCTION L1 | D. S. CONSTRUCTION L2 | VEER INFRATECH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 344 | Square Meter | 52 ₹17,888 | 52 ₹17,888 | 52 ₹17,888 |
| 2.00 | Providing and applying two coats of EP Plus 800 (HIGH BUILT EPOXY COATING) it can be applied to most of the surfaces to provide a water proof, dust proof and hard wearing surface with excellent chemical resistance. Mixing ratio of resin and hardener is 88:12 the finish surface should be smooth and semi glossy. Film thickness 125 to 150 microns per coat. Packaging of material is of 5 and 25 Kg etc. complete | 344 | Square Meter | 3,400 ₹11.7 L | 3,410 ₹11.7 L | 3,450 ₹11.9 L |
| 3.00 | Removing of existing RCC slipper & stacking at a place as per direction of Engineer-in-charge | 287 | Square Meter | 80 ₹22,960 | 80 ₹22,960 | 85 ₹24,395 |
| 4.00 | Providing and erecting FRP sleeper cover including all materials, labour, Loading Unloading, transporation, all taxes, duties etc. Completed. | 287 | Square Meter | 9,755 ₹28.0 L | 9,770 ₹28.0 L | 9,800 ₹28.1 L |
Tender Value
Refer Docs
EMD Value
₹40,300
Closing Date
8 Apr 2026, 11:00 amClosed
Superintending Engineer, MIDC Circle Office, CSN
Superintending Engineer, MIDC Circle Office, CSN
Refurbishing and other allied works to CLF at WTP Khodegaon
2026_MIDC_1290957_1
33/D/01
Open Tender
Electrical Works
CSN
Please refer Tender documents.
2 documents required · 2 mandatory
₹8,850
₹40,300
22 Apr 2026
27 Mar 2026
9 Apr 2026
27 Mar 2026
8 Apr 2026
2 Apr 2026
27 Mar 2026 - 1 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Removing the existing cement plaster of any thickness without causing dust nuisance and stacking the debris upto a distance of 50 metres or spreading in the compound and cleaning the site etc. complete. | 344 | Square Meter | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Providing and applying two coats of EP Plus 800 (HIGH BUILT EPOXY COATING) it can be applied to most of the surfaces to provide a water proof, dust proof and hard wearing surface with excellent chemical resistance. Mixing ratio of resin and hardener is 88:12 the finish surface should be smooth and semi glossy. Film thickness 125 to 150 microns per coat. Packaging of material is of 5 and 25 Kg etc. complete | 344 | Square Meter | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Removing of existing RCC slipper & stacking at a place as per direction of Engineer-in-charge | 287 | Square Meter | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and erecting FRP sleeper cover including all materials, labour, Loading Unloading, transporation, all taxes, duties etc. Completed. | 287 | Square Meter | - | - | BI01010001010000000000000515BI0100001116 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
BOQ_2219130.xls
BOQ • 0.28 MB
TenderDocument.pdf
Tender Documents • 0.27 MB
ItemSpecification.pdf
Other Document • 0.02 MB
Download all tender documents and submit your bid