| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76.6 LAdmitted-Finance ERODE 638 152 | ERODE | TAMIL NADU | 638152 | L1 | Admitted-Finance | |
| 2 | L2₹78.9 L+₹2.3 L (3.02%)Admitted-Finance 9 A PONGALIVALASU KODUMUDI POST ERODE 638 151 | KARUR | TAMIL NADU | 638151 | L2 | Admitted-Finance | |
| 3 | Rejected-Technical | - | Rejected-Technical not Satisfied |
| Sl No | Description | Qty | Unit | Sri Balaji Constructions L2 | VRR CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. FOR DRAIN | |||||
| 2.00 | Mat | 269 | M3 | 232.99 ₹62,674.31 | 226.15 ₹60,834.35 Lowest |
| 3.00 | Footing | 23 | M3 | 93.29 ₹2,145.67 | 90.55 ₹2,082.65 Lowest |
| 4.00 | Supply and filling crusher stone sand ( M- Sand ) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 26 | M3 | 1,542.22 ₹40,097.72 | 1,497 ₹38,922 Lowest |
| 5.00 | Cement Concrete 1:4:8 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 40 | M3 | 5,543.72 ₹2,21,748.8 | 5,381.17 ₹2,15,246.8 Lowest |
| 6.00Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | |||||
| 7.00 | Mat and Footing | 233 | M2 | 381.74 ₹88,945.42 | 370.55 ₹86,338.15 Lowest |
| 8.00 | Column | 414 | M2 | 1,374.25 ₹5,68,939.5 | 1,333.95 ₹5,52,255.3 Lowest |
| 9.00 | Plinth and tie beam | 185 | M2 | 381.74 ₹70,621.9 | 370.55 ₹68,551.75 Lowest |
| 10.00 | Providing and laying in position ,Standardised Concrete Mix M-25 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials). | 114 | M3 | 8,998.34 ₹10,25,810.76 | 8,734.5 ₹9,95,733 Lowest |
Tender Value
₹95 L
EMD Value
₹95,000
Closing Date
28 May 2025, 3:00 pmClosed
The Commissioner Tambaram Corporation
Zone 4 Perungalathur
Construction of Compound wall East side of proposed New Corporation Office building Zone 4 in Tambaram City Municipal Corporation
2025_DMA_561357_1
340/2025/E1/Z4
Open Tender
Civil Works
Works
60 days
Zone 4
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹95,000
15 Sept 2025
24 May 2025
28 May 2025
24 May 2025
28 May 2025
24 May 2025
Amount
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification. FOR DRAIN
Footing
Supply and filling crusher stone sand ( M- Sand ) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
Cement Concrete 1:4:8 (One Cement, Five sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Mat and Footing
Column
Plinth and tie beam
Providing and laying in position ,Standardised Concrete Mix M-25 Grade in accordance with IS 456-2000, using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser/ super plasticiser) in recommended proportions as per IS:9103 to accelerate , retard setting of concrete, improve workability without impairing strength and durability with about ( 5 Cu.m) 7730 kg of 20mm machine crushed stone jelly and with about (3.3 cu.m) 5156 kg of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying ,Vibrating with mechanical vibrators , finishing ,curing , etc. and providing fixtures like fan clamps in the RCC floor/roof slabs wherever necessary without claiming extra, etc complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS Standards. ( No seperate payment will be made by the Department for the excess usage of materials).
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
Brick work in Cm 1:5 mix using 2nd class chmber burnt work including cost and conveyance of all materials and all labour cahrges etc complete
Plastering in Cm 1:5 -12mm thick including cost and conveyance of all materials and including all labour cahrges etc complete
Supply and fixing of MS Grills design works recommended by the departmental officers including cost of materials fabrication charges and all other labour cahrges etc complete
Painting two coats using cement paint for prime coat including cost and conveyance of all materials and including all labour charges etc complete
Painting two coats using exterior grade emulsion paint with prime coat including cost and conveyance of all materials and including all labour charges etc complete
Painting two coats using ready mix enamel paint including cost and conveyance of all materials and including all labour charges etc complete
Removal of Excavated Excess Earth away from the site to 1K.M including loading and transportation charges etc, complete as per standard specification.
Provision Band works and Elevation works of Walls
Provision Art painting works of Wall
Provision for Electrical works
Sri Balaji Constructions (BID ID -1353353)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .