| Sl No | Description | Qty | Unit | M.R ASSOCIATES L1 | SUBRAMANIAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling old damaged Brick work/ stone masonry walls in cement mortar under 3m height and Clearing away and carefully stacking materials useful for re-use for any thickness of walls etc., complete as per std specification | 6.5 | m3 | 302 ₹1,963 Lowest | 400 ₹2,600 |
| 2.00 | Earth work excavation for desilting the existing rivers / canals / channels/odai/ nullas / drains/flood bowls/ tanks/ reservoirs etc., consisting of very loose soil, silt, oily silt, slushy, marshy, loany, organic soil, sea shell and flat mica particles with zero present air void in unhygienic & insanitary conditions in under water and not under water deploying earth moving machinery with suitable floats buoys barge/ hydraulic excavator & other mechanical devices including the cost of hire charges for machinery, with cost of skilled operators with helper & cleaners for the entire operations to reach the banks in which the removed silt & sludge has to be dumped over either one of the rivers / canals / channels/odai/ nullas / drains/floods bowls / tanks / reservoirs etc, bank whichever is convenient as per the prevailing site conditions for easy conveyance and including jungle clearance etc.. complete (Rate excluding conveyance to dumping yard or low lying area) | 6.5 | m3 | 116 ₹754 Lowest | 150 ₹975 |
| 3.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum For Drain - Upto 1.25m Width - First Depth Upto 2m | 36 | m3 | 165 ₹5,940 Lowest | 170 ₹6,120 |
| 4.00 | Removal of excess earth 3km away from site including loading and inloading charges and all labour charges as instructed by the Departmental Offices etc,complete as per standard specifications . | 39.5 | m3 | 67.5 ₹2,666.25 Lowest | 70 ₹2,765 |
| 5.00 | Plain Cement Concrete 1:4:8 (one cement four Parts of crushed stone M-sand and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification (The crushed stone sand to be used on cocrete work shell conform to gradation as per IS :383-1970 ) | 5.5 | m3 | 5,503 ₹30,266.5 Lowest | 5,503 ₹30,266.5 Lowest |
| 6.00Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation - Drain Side Walls - Upto 900mm | |||||
| 6.01 | Side Wall | 95.5 | m2 | 489 ₹46,699.5 Lowest | 500 ₹47,750 |
| 6.02 | Slab | 6.5 | m2 | 1,085 ₹7,052.5 Lowest | 1,085 ₹7,052.5 Lowest |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two m.sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 18.5 | m3 | 6,892 ₹1,27,502 Lowest | 6,892 ₹1,27,502 Lowest |
| 8.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.45 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc., complete complying with standard specification and as directed by the departmental officers | 2 | m3 | 8,605 ₹17,210 Lowest | 8,605 ₹17,210 Lowest |
Tender Value
₹3.2 L
EMD Value
₹3,200
Closing Date
6 Nov 2025, 3:00 pmClosed
THE COMMISSIONER UDUMALPET MUNICIPALITY
THE COMMISSIONER UDUMALPET MUNICIPALITY
Maintenance and Repairs to Drain with Culverts at Babu khan street east side (from Commissioner subbiah street to Kasthuri street) in Ward no 18 and 24 Udumalpet Municipality
2025_MAWS_617312_1
1736/2024/E1
Open Tender
Civil Works - Others
Item Rate
60 days
UDUMALPET
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,200
8 Jun 2026
25 Oct 2025
7 Nov 2025
25 Oct 2025
6 Nov 2025
25 Oct 2025
25 Oct 2025 - 6 Nov 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.45 MB
BOQ_737716.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].