| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.6 LAccepted-Finance | ₹40.6 L | L1 | Accepted-Finance Quoted below |
| 2 | L2₹40.9 L+₹34,801.29 (0.86%)Rejected-Finance | ₹40.9 L+₹34,801.29 (0.86%) | L2 | Rejected-Finance Quoted Above |
| Sl No | Description | Qty | Unit | PTK and CO L2 | K.B.Subbaiyan L1 |
|---|---|---|---|---|---|
| 1.00Name of Work:Strengthening to the road from Tiruppur main road to Kurumbapalayam via burial ground Km 0/0 - 0/880 (R-77) H/o Bellathi panchayat | |||||
| 2.00 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 792 | Sqm | 10 ₹7,920 | 6 ₹4,752 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 869.93 | Sqm | 25 ₹21,748.25 | 23 ₹20,008.39 Lowest |
| 4.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) | 18 | Cum | 2,285 ₹41,130 | 2,280.5 ₹41,049 Lowest |
| 5.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 326.22 | Cum | 2,370 ₹7,73,141.4 | 2,367 ₹7,72,162.74 Lowest |
| 6.00 | Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 2,609.8 | Sqm | 90 ₹2,34,882 | 85 ₹2,21,833 Lowest |
| 7.00 | Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete | 2,609.8 | Sqm | 22 ₹57,415.6 | 19.5 ₹50,891.1 Lowest |
| 8.00 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 65.24 | Cum | 10,830 ₹7,06,549.2 | 10,827 ₹7,06,353.48 Lowest |
| 9.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 132 | Cum | 440 ₹58,080 | 436.7 ₹57,644.4 Lowest |
| 10.00 | Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete | 4 | No | 580 ₹2,320 | 574.54 ₹2,298.16 Lowest |
Tender Value
₹41.1 L
EMD Value
₹41,100
Closing Date
13 Jan 2026, 3:00 pmClosed
Block Development Officer (BP) Karamadai
Block Development Office Karamadai
Strengthening to the road from Tiruppur main road to Kurumbapalayam via burial ground Km 0/0 - 0/880 (R-77) H/o Bellathi panchayat under Union General Fund 2025-26 in Karamadai Block,Coimbatore District
2026_RDTN_639945_1
Roc No.912/2025/A2 Dt.31.12.2025
Open Tender
Civil Works
Item Rate
90 days
Karamadai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹41,100
15 Sept 2026
8 Jan 2026
13 Jan 2026
8 Jan 2026
13 Jan 2026
8 Jan 2026
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in Subbase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. complete
Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Supplying and fixing Hecta Metre stones including painting and lettering as directed by the departmental officers etc., complete
Provision of 1 Nos.rumble strips covered with premix bitiminous carpet 15-20mm high at centre 250mm wide placed at 1m centre to centre at approved locations to control speed,marked with white strips of road marking paint.
90cm High Octagon Stop sign board
Construction of Retaining wall - Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement Concrete 1:4:8 (One Cement, Four M.Sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick, well rammed, consolidated and curing etc. complete complying with standard specification
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton.
Plain Cement Concrete 1:3:6 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
Supplying and fixing Name board including painting and lettering as directed by the departmental officers etc., complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.52 MB
pricebid.pdf
Tender Documents • 0.88 MB
technicalbid.pdf
Tender Documents • 1.02 MB
BOQ_766192.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .