Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Oct 2026, 11:00 am5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
DSCO
Soil Conservation Complex phase 6 mohali
Construction of Gabion Structures Village KasaulI Bhaginidi and Run off control structure villafe kasauli
2026_DOA_177474_1
DSWC/MOH/2026-27/23
Open Tender
Civil Works
Percentage
90 days
SAS NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
₹1.2 L
14 Oct 2026
14 Oct 2026
23 Oct 2026
14 Oct 2026
23 Oct 2026
14 Oct 2026
DEPARTMENT OF SOIL AND WATER CONSERVATION, PUNJAB
Tender No. DSWC/MOH/2026-27/23
1.Construction of Gabion Structures Village Kasauli, Bhagindi Tehsil Kharar, District S.A.S Nagar 2. Run Off Control Structure Village kasauli ,Tehsil Kharar, District SAS Nagar
RATES FOR CIVIL WORK( Approved by CCS PUNJAB Chandigarh)
Name & Address of Firm/ Bidder
Total Estimated Cost 5764448
Quoted by Contractor (as %age less of estimated Amount) Less (-%) Amount Quoted
1 Construction of Gabion Structures 1 to 18 (Land Protection Work), Village BHAGINDI, Tehsil Kharar, District S.A.S Nagar
Estimate San.No. 15946/D.B. Dated 11-09-2026 for Rs. 45,68,600.00/-
A. GABION STRUCTURE-1
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 45 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 257.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 257.5 Sqm 70
4 Filling stones or spalls into crate and hand packing 75 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 30347
B GABION STRUCTURE-2
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 70 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 473.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 473.5 Sqm 70
4 Filling stones or spalls into crate and hand packing 157.5 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 157.5 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 63728
C Gabion STRUCTURE-3
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 37.5 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 222.75 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 222.75 Sqm 70
4 Filling stones or spalls into crate and hand packing 68.75 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 68.75 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 27818
D GABION STRUCTURE-4
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 45 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 330.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 330.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 97.5 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 97.5 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount
GRAND TOTAL say 280506
E GABION STRUCTURE-5
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 22.5 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 134.75 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 134.75 Sqm 70
4 Filling stones or spalls into crate and hand packing 41.25 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 41.25 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 16691
F GABION STRUCTURE-6
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 52.5 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 423.75 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 423.75 Sqm 70
4 Filling stones or spalls into crate and hand packing 131.25 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 131.25 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 53106
G GABION STRUCTURE-7
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 178.75 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 178.75 Sqm 70
4 Filling stones or spalls into crate and hand packing 55 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 55 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 22254
H GABION STRUCTURE-8
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 221.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 221.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 65 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 65 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 26300
I GABION STRUCTURE-9
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 50 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 339.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 339.5 Sqm 70
4 Filling stones or spalls into crate and hand packing 112.5 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 112.5 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 45520
J GABION STRUCTURE-10
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 221.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 221.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 65 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 65 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 26300
K GABION STRUCTURE-11
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 221.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 221.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 65 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 65 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 26300
L GABION STRUCTURE-12
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 221.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 221.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 65 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 65 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 26300
M GABION STRUCTURE-13
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 60 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 406.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 135 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 135 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 54624
N GABION STRUCTURE-14
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 45 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 330.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 330.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 97.5 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 97.5 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount
GRAND TOTAL say 280506
O GABION STRUCTURE-15
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 60 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 406.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 135 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 135 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 54624
P GABION STRUCTURE-16
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 60 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 406.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 135 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 135 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 54624
Q GABION STRUCTURE-17
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 30 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 221.25 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc 221.25 Sqm 70
4 Filling stones or spalls into crate and hand packing 65 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 65 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount 26300
R GABION STRUCTURE-18
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 18 cum 200
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 136 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 41 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
CARRIAGE Total Amount Say 16589
TOTAL COST OF PROJECT 4545948
GRAND TOTAL COST OF PROJECT - 1 (SAY) 4545948
2 Construction of Gabion Structures 1 to 4 & Run Off Control Structure , Village Kasauli , Tehsil Kharar, District S.A.S Nagar
Estimate San.No. 17361 Dated 05.10.2026 for Rs. 12,18,500/-
A. GABION STRUCTURE-1
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 60 cum 37
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 406.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 135 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 135 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 52835
B. GABION STRUCTURE-2
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 40 cum 37
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 273.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 90 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 90 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Total Amount (say) 35223
GRAND TOTAL 242056
C GABION STRUCTURE-3
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 37.5 cum 37
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 240.75 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 67.5 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 67.5 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 26417
D GABION STRUCTURE-4
DETAILS OF CHARGES
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1 Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. 60 cum 37
2 Weaving wire netting for wire crates including binding sides and partitions to make crate of 15cm by 15 cm mesh 406.5 Sqm 187
3 Spreading wire crates over pitching connecting with side protective wall inclusive of wire etc Sqm 70
4 Filling stones or spalls into crate and hand packing 135 cum 1384
GST difference 12 to 18 % @5.35%
Total abstract of Labour charges
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 135 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Grand Total Amount (say) 52835
E. RUN OFF CONTROL STRUCTURE
Sr. No Particulars Qty Unit Rate Rate (In figures) Amount (Rs.)
1.21 Excavation in soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m for foundation and abutments 5.98 Per Cum 38.98
1.22 CC 1:8:16 (Gatka) in foundation 1.01 Per Cum 3433.36
1.23 CC 1:2:4 (Bajri) 0.38 Per Cum 5058.91
1.24 Square rubble masonry (coursed rubble) in foundation and plinth in cement mortar 1:5 4.26 Per Cum 5602.51
1.25 Add for work in super structure 4 metres above plinth level 3.83 Per Cum 6089.23
1.26 12.5 mm thick Cement Sand plaster in 1:4 12.81 Per Sqm 213.54
CARRIAGE OF MATERIALS FOR CIVIL WORK AS PER MATERIAL STATEMENT
Sr. No. Item Qty Premium (%) Rate after premium Unit Total Amount= Amount x Qty.
Less Intial 5 km Carriage 13.56 7 195.17 Cum
Carriage Amount Total
G. Total after GST factor (for gst diff of 12% to 18%) (105.35%)
Total Amount (say) 5306
GRAND TOTAL 60853
TOTAL COST OF PROJECT - 2 (SAY) 1218500
GRAND TOTAL OF PROJECT 1 & 2
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
dnit.pdf
Tender Documents • 0.52 MB
finbid.xls
Additional Documents • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .