| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 Cr+₹4.7 L (4.50%)Rejected-Finance | ₹1.1 Cr+₹4.7 L (4.50%) | L2 | Rejected-Finance L2 |
| 3 | Not Admitted-Fee/PreQual/Technical 4 243 MAIN STREET VANNIKONENTHAL TIRUNELVELI DISTRICT | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical A 11 N G O B COLONY TIRUNELVELI 627 007 | TIRUNELVELI | TAMIL NADU | 627007 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
23 Jul 2024, 3:00 pmClosed
Project Director
DRDA, Tirunelveli
Strengthening of roads in Palayamkottai Block
2024_RDTN_458929_18
AS no A4/2111723/2024 dated 24/06/2024
Open Tender
Civil Works
Item Rate
180 days
Tirunelveli District
As per Technical bid
5 documents required · 5 mandatory
₹0
₹1.1 L
DRDA, Tirunelveli
13 Sept 2024
4 Jul 2024
23 Jul 2024
4 Jul 2024
23 Jul 2024
16 Jul 2024
5 Jul 2024
Amount
1) Strengthening of TDR - Palai -Ambai Road To Vadaku Vettiyapanthi Road Km 0/0-1/650 (Plastic Waste)
Clearing and Grubbing road landing uprooting wild vegetation , grass, bushes , shrubs, saplings and trees of girth upto 300mm, removal of the stumps such trees cut earlier and disposal of unserviceable materials and stacking of servicable materials also to be used or auctioned, upto lead 100m including and disposal of top organic soil not exceeding 150mm thickness as per Technical specification claus 201,(i) (A) - Scrub Jungle Clearance
Scarifying the existing bituminous road surface to a depth of 150mm and disposal of scarified materia with a lift upto 3m and lead upto 1000m as per Technical Specification clauses 301.4
Earth work excavation in all classes of soils such as hard stiff clay stiff black cotton soil, hard red earth shales murrums and ordinary soil as per SS 20A for widening the berms
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying reqiured quantity of bituminous emulsion by mechamical sprayer including hire and fuel charges for all tools and plants employed etc complete as per clause 503 of MOST specification
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50mm Consolidated thick Bituminious Mecadam using 0.24 cum of 26.50-13.20 mm Graded metal and 0.23 cum of 2.36mm & below with 50.3kgs of 60/70 of Plastic Waste for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to reqiured temperature and mixing them in required temperature in centrak hot mix plant 20-30 ton capacity conveying the mix by tipper truck to paver site, spreading the mix to uniform thickness of 50mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory / Pneumatic rollers to the requried density etc including labour for loading bitumen inti bitumen tank and metal to feeder unit labour for attending to paver site etc
Providing and laying Bituminous concrete to specified thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 46.28kgs of VG30/VG40 heating the bitumen and 4.02 kg plastic wastage aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc. including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks, paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 (Using plastic waste )
Providing Rumble strips covered with premix Bituminous Carpet 20mm high at center, 250mm vide placed at 1m center to center at approved locations to control speed marked with white strips pf road marking paint
Providing and laying of hot applied thermoplstic compound 2.50mm thick including refletorising glass beads @250 gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC : 35, the finished surface to be level uniform and free from streals and holes etc complete as per morth specification No.803
Construction of Retaining wall @ Ch 0/922 - 1/000 km
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Below G.L.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Above G.L.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for 60cm Equilateral Traingle
Provision for Informatory Sign Board
Provision for Reflector
Provision for 60cm Mandatory sign Board
Provision of Kilometre stone 1.65 x 0.45 x 0.15m
Provision of Hectametre stone 0.23x0.15x0.75m
2) Strengthening of Palayamchettikulam Lourd matha kovil road Km 0/0-0/340
Clearing and Grubbing road landing uprooting wild vegetation , grass, bushes , shrubs, saplings and trees of girth upto 300mm, removal of the stumps such trees cut earlier and disposal of unserviceable materials and stacking of servicable materials also to be used or auctioned, upto lead 100m including and disposal of top organic soil not exceeding 150mm thickness as per Technical specification claus 201,(i) (A) - Scrub Jungle Clearance
Scarifying the existing bituminous road surface to a depth of 150mm and disposal of scarified materia with a lift upto 3m and lead upto 1000m as per Technical Specification clauses 301.4
Earth work excavation in all classes of soils such as hard stiff clay stiff black cotton soil, hard red earth shales murrums and ordinary soil as per SS 20A for widening the berms
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMM surface at 7.00Kg of SS-1 Bitumen Emulsion including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying reqiured quantity of bituminous emulsion by mechamical sprayer including hire and fuel charges for all tools and plants employed etc complete as per clause 503 of MOST specification
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Providing Rumble strips covered with premix Bituminous Carpet 20mm high at center, 250mm vide placed at 1m center to center at approved locations to control speed marked with white strips pf road marking paint
Providing and laying of hot applied thermoplstic compound 2.50mm thick including refletorising glass beads @250 gms per sqm area , thickness of 2.5mm is exclusive of surface applied glass beads as per IRC : 35, the finished surface to be level uniform and free from streals and holes etc complete as per morth specification No.803
Provision for Informatory Sign Board
Provision for 60cm Mandatory sign Board
Provision of Hectametre stone 0.23x0.15x0.75m
Provision for Reflector
Retaining Wall @Ch 0/10 - 0/40 Km
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. Below G.L.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. above G.L.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
S.NAVANEETHAKRISHNAN (BID ID -1090040)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .