Loading…
Loading…
Tender Value
₹6.1 L
EMD Value
₹6,200
Closing Date
11 Jun 2026, 6:00 pm5d left
Executive Engineering UPSIC KANPUR
Executive Engineering UPSIC KANPUR
Construction of Stairs And Drain At ward 15 9/20 Allah Baksh Takia Kabristan Sisamau vidhan Sabha Kanpur Nagar
2026_MSME_1157003_5
466/EE4/26-27
Open Tender
Civil Works
120 days
KANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Engineering UPSIC KANPUR
₹6,200
4 Jun 2026
4 Jun 2026
12 Jun 2026
4 Jun 2026
11 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | e/w in surface excavation not exceding 30 cm in depth but exceding 1.5 m width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m as directed by the engineer-in-charge 2.1.1 all kind of soil. Chapter-4 SI no 1 ref. to DSR/PWD 2.6 (2.6.1) | 41.81 | cum | 205.71 | ₹8,600.74 |
| 2 | 1:4:8 (1 cement :4 coarse sand : 8 graded brick aggregate 40 mm nominal size | 5.42 | cum | 5,383.39 | ₹29,177.97 |
| 3 | 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 3.56 | cum | 6,783.29 | ₹24,148.51 |
| 4 | Centering and Shuttering including strutting propping etc. and removel of form work for (upto 5th floor) foundation , footings base for column PWD/DSR 4.3.1 | 15.48 | Sqm | 309.91 | ₹4,797.41 |
| 5 | 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size DSR/PWD 4.1.2 | 4.09 | cum | 8,576.87 | ₹35,079.4 |
| 6 | Centering and Shuttering including strutting propping etc. and removel of form work for (upto 5th floor) foundation ,footings base for column PWD/DSR 4.3.1 | 16.79 | Sqm | 581.96 | ₹9,771.11 |
| 7 | Centering and Shuttering including strutting propping etc. and removel of form work for (upto 5th floor) foundation ,footings base for column PWD/DSR 4.3.1 | 10.5 | Sqm | 732.79 | ₹7,694.3 |
| 8 | Steel reianforcement for r.c.c work including straightering,cutting bending placing in position and binding all complete upto plinth level.PWD/DSR5.22 | 7.51 | Qtl. | 8,463.9 | ₹63,563.89 |
| 9 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in foundation and plinth in: cement mortar 1:4 DSR 6.1.1 | 52.83 | cum | 5,636.48 | ₹2,97,775.24 |
| 10 | Brick work with common burnt clay (Non Modular) Bricks of class-150 in Superstructure above plinth level up to floor v level in all shape and sizes: cement mortar 1:4 (Coarse sand) DSR 6.4.1 | 7.75 | cum | 7,384.66 | ₹57,231.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_2168012.xls
BOQ • 0.27 MB
TermsandConditionTenderCivilWorks.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid