Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical ATTACH |
| 2 | Accepted-Technical | Accepted-Technical ATTACH |
| 3 | Accepted-Technical | Accepted-Technical ATTACH |
| 4 | Accepted-Technical | Accepted-Technical ATTACH |
| 5 | Rejected-Technical | Rejected-Technical ATTACH |
Tender Value
₹9.7 L
EMD Value
₹98,000
Closing Date
14 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MI BANDA
EE MI BANDA
Renovation of CheckDam Parampurva Block Barokhar Khurd Lot-16
2026_UPMID_1186385_61
03/MI/JET/2026-27 Dt 10-09-2026
Open Tender
Civil Works
Percentage
60 days
BANDA
Renovation of CheckDam Parampurva Block Barokhar Khurd Lot-16
2 documents required · 2 mandatory
₹950
EE MI BANDA
₹98,000
Yes
EE MI BANDA
21 Nov 2026
17 Sept 2026
15 Oct 2026
17 Sept 2026
14 Oct 2026
17 Sept 2026
18 Sept 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentaling of all old damaged CC, RCR ,Plaster &Pointing Work | 1 | Job | 20,000 | ₹20,000 |
| 2 | C.C.in 1:3:6 Cement, Sand and 20 to 40 mm Granit Stone Ballast including the cost of materials labours and etc. required for proper completion of work. | 15.66 | m³ | 4,228 | ₹66,210.48 |
| 3 | R.C.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 89.12 | m³ | 5,312.7 | ₹4,73,467.82 |
| 4 | R.R Stone massonery work in 1:4 Cement Sand Mortar including the cost of material, labour etc. required for proper completion of work. | 31.89 | m³ | 4,201.2 | ₹1,33,976.27 |
| 5 | C.C.in 1:2:4 Cement, Sand and 10 to 20 mm Granit Stone grit including the cost of materials labours and etc.to required for proper completion of work. | 29.01 | m³ | 5,127.9 | ₹1,48,760.38 |
| 6 | Raised struck pointing in 1:2 Cement sand mortar including the cost of material labour etc.to required for proper completion of work. | 80.56 | sqm | 135.5 | ₹10,915.88 |
| 7 | Plaster in 1:3 Cement, Sand Mortar on stone masonery of checkdam. | 47.32 | sqm | 201.2 | ₹9,520.78 |
| 8 | Dry stone boulder filling in Tallus Filter D/S bed on Nala after floor. | 3.84 | m² | 1,844.5 | ₹7,082.88 |
| 9 | Devlopment of Nala for increasing resorvoir by cutting both banks & bed of Nala Iin u/s and d/s cf checkdam as per requird (40% of total e/w | 273.89 | m³ | 95.2 | ₹26,074.33 |
| 10 | Devlopment of Nala for increasing resorvoir by cutting both banks & bed of Nala Iin u/s and d/s cf checkdam as per requird (60% of total e/w | 410.83 | m³ | 107.7 | ₹44,246.39 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2234258.xls
BOQ • 0.35 MB
NIT.pdf
PDF • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .