Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
27 Apr 2026, 1:00 pmClosed
Executive Engineer Flood Control Division Kakapora
Executive Engineer Flood Control Division Kakapora HQ Marwal
Restoration, Maintenance and Removal of encroachment on Wankran Nallah including their tributaries and gates for the year 2026-27 Flood Zonal Committee Kakapora Flood Control Sub. Division Pulwama
2026_IFC_308264_3
e-NIT NO.01 of 2026-2027
Open Tender
Civil Works
Percentage
315 days
Kakapora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Flood Control Division Kakapora
₹3,000
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
27 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing of JCB (Hyd. Excavator) for emergency works during floods or heavy rains as and when required including cost of fuel and other allied charges. | - | Working Hour | - | - |
| 2 | Hire charges for pokelean for emergency works during floods or heavy rains as and when needed including opertational charges and fuel for working hours involved . | - | Working Hours | - | - |
| 3 | Providing of Cutting Saw Machine for tree felling during floods or heavy rains as and when required including cost of fuel and other allied charges. | - | Working Hours | - | - |
| 4 | Providing of Pumpset of capacity 4000 litres/hour during floods or heavy rains as and when required including cost of fuel and other allied charges. | - | Working Hours | - | - |
| 5 | Supply of Safeda ballies 125mm diameter. | - | Mtr. | - | - |
| 6 | Providing Mazdoor( unskilled labor) whereverrequired for manual works. | - | Day | - | - |
| 7 | Supply of sand during floods, heavy rains as and when required including all leads & lifts at site & mechanical carriages upto dumping site with loading/unloading etc. | - | m³ | - | - |
| 8 | Supply of stone dust during floods, heavy rains as and when required including all leads & lifts at site & mechanical carriages upto dumping site with loading/unloading etc. | - | m³ | - | - |
| 9 | Supply of earth during floods, heavy rains as and when required including all leads & lifts at site & mechanical carriages upto dumping site with loading/unloading etc. 5 km | - | m³ | - | - |
| 10 | Filling of EC bags with sand/earth/stone dust including stiching / sewing & excluding cost of sand/earth/stone dust & EC bags. | - | No. | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_999186.xls
BOQ • 0.34 MB
Corricheklist.pdf
PDF • 0.47 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .