Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.9 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹4.0 L+₹7,288.78 (1.87%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹4.0 L+₹12,099.38 (3.11%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹4.0 L+₹15,160.67 (3.90%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹4.1 L+₹24,295.94 (6.25%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹4.8 L
EMD Value
₹9,700
Closing Date
10 Aug 2026, 6:00 pmClosed
xen rew udhampur
xen rew udhampur
NIT
2026_RDPR_316310_13
e-NIT No. 51 REW UDHAMPUR of 2026-27 Dated 16-07-2026
Open Tender
Civil Works
Percentage
60 days
udhampur
BOQ
2 documents required · 2 mandatory
₹600
xen rew udhampur
₹9,700
Yes
14 Aug 2026
17 Jul 2026
11 Aug 2026
17 Jul 2026
10 Aug 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Part 1 Add cost of sign board | 1 | No. | 1,000 | ₹1,000 |
| 2 | Earth work in bulk excavation by mechanical means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. 100%All kinds of soil | 10.2 | cum | 187.3 | ₹1,910.46 |
| 3 | Earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 100%All kinds of soil | 9.13 | cum | 256.85 | ₹2,345.04 |
| 4 | Providing and lying in position cement concrete 1 cement:5fine sand:10 graded crushed stone aggregates 40mm size.excludingthe cost of centring and shuttering all work upto plinth Level | 1.82 | cum | 4,826.5 | ₹8,784.23 |
| 5 | Providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. | 4.72 | cum | 5,733.6 | ₹27,062.59 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,
landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral
stair cases upto five level including curing but excluding the cost of centring, shuttering,
finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.17 | cum | 9,821.85 | ₹31,135.26 |
| 7 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.94 | cum | 9,395.7 | ₹18,227.66 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 460.2 | Kg | 123.2 | ₹56,696.64 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in Cement mortar 1:6 ( 1 cement : 6 coarse sand) (Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level) | 2.23 | cum | 9,027.2 | ₹20,130.66 |
| 10 | 15mm Cement plaster of mix: 1 : 6 ( 1 cement : 6 fine sand) | 25.28 | Sqm | 306.85 | ₹7,757.17 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1030790.xls
BOQ • 0.31 MB
extensionfinal.pdf
PDF • 0.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .