| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹40.3 LAccepted-AOC | 1 | Accepted-AOC Lottery | |
| 2 | Rejected-Technical AT BELTIKIRI SADAR DHENKANAL | DHENKANAL | ODISHA | 759001 | - | Rejected-Technical lottery | |
| 3 | Rejected-Technical | - | Rejected-Technical lottery | |
| 4 | Rejected-Technical AT BELTIKIRI SADAR DHENKANAL | - | Rejected-Technical lottery | |
| 5 | Rejected-Technical | - | Rejected-Technical lottery |
Tender Value
₹42.4 L
EMD Value
₹42,370
Closing Date
5 Feb 2026, 5:00 pmClosed
SESERWD KamakhyanagarRWD Kamakhyanagar
SERWD Kamakhyanagar
Repair to Bridge approach over Ramial Nallah at 3rd KM on Mathakargola to Arakhapal Jiral Road
2026_CERWI_125255_1
On line K,Nagar 25(2025-26)
Open Tender
Civil Works - Roads
Percentage
30 days
Kamakhyanagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
Yes
₹42,370
Yes
30 Apr 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
5 Feb 2026
31 Jan 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30m outside the perifhery of the area as per Technical Specification Clause 201 of MORD by Manual means as per the direction E.I.C. | 800 | sqm | 8.44 | ₹6,752 |
| 2 | Dismetalling brick or stone masonary in lime or cement mortar above 3 m height including stacking the useful materials for reuse and removing the derbis within 50 m lead. etc complete | 60.75 | cum | 1,706.55 | ₹1,03,672.91 |
| 3 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads. Transporting to site by mechanical means within a lead of 5 kms, spreading, grading to required slope and compacting to meet requirement of table 300-2 & Clause 305 of MORTH Specifications for Road & Bridge works (4th Revision) | 202.5 | cum | 201 | ₹40,702.5 |
| 4 | Collecting supplying sand for filling of foundation with cost , conveynce, royality, labour for filling etc complete | 830.25 | cum | 1,124.88 | ₹9,33,931.62 |
| 5 | Construction of granular sub-base by providing close graded granular sub base Grading III material as per table 401-1, spreading in uniform layer with moter grader on prepared surface, mixing by mix in place method with rotavator at OMC ,and compacting with vibratory roller to achieve the desired density complete as per clause 401 of MoSRT&H Specification for Road & Bridge works (4 th Revision) | 118.13 | Cum | 3,074.26 | ₹3,63,162.33 |
| 6 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including pre mixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per Clause 406 of MoSRT&H Specifications for Road & Bridge works (4th Revision). | 101.25 | Cum | 3,600.96 | ₹3,64,597.2 |
| 7 | Providing applying primer coat with bitumen emulsion (SS-I) over prepared surface of granular base including clearing road surface and spraying primer at the rate of 0.6 kg / sqm | 675 | sqm | 38.28 | ₹25,839 |
| 8 | Providing and applying tack coat with Bitumen using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared surfaces cleaned etc as per Technical Specification as per the direction of the Engineer-in-charge | 675 | sqm | 13.97 | ₹9,429.75 |
| 9 | Providing and laying Bituminous Macadam with 100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction | 24.75 | Cum | 9,015.19 | ₹2,23,125.95 |
| 10 | Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH spefn. clause No. 508 complete. | 16.88 | Cum | 11,197.55 | ₹1,89,014.64 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_578437.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
Tendernotice_2.pdf
PDF • 3.75 MB
BOQ_578437.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .