Tender Value
₹18.9 Cr
EMD Value
₹37.7 L
Closing Date
6 Aug 2026, 3:00 pm
Construction of LHS in lieu of LC no 36 under IOW/BPR and at LC no. 287 under IOW/BEM.
NER-IZN-2026-117
NER-IZN-2026-117
Open
Works - General
12 Months
Unknown (Unspecified Location)
₹0
₹37.7 L
14 Jul 2026
14 Jul 2026
23 Jul 2026
Item Breakup - A-CPWD DSR- 2021.
Item Breakup - B-USSOR-2021.
cum Provision of barricading with contractor's bamboos / ballies vertical post of 100mm dia. planted at every 2m interval, projecting at least 1.5m above ground level and driven firmly (minimum 0.5m) inside ground and including painting verticals & horizontals with red luminous paints / strips at alternative bay on barricade. Barricades shall be maintained through out the execution of the work and shall be removed in workman like manner on completion of the work only after instruction of Engineer in-Charge. Note: (1) 60% payment shall be made on provision of barricading at work- site and balance 40% payment after removal of barricades. (2) The released bamboos / ballies shall be the property of the Contractor.
420.00 minimum 50mm dia. spaced equally Exploratory drilling of boreholes down to required depth, drilling of 150mm dia. boreholes in all type of soils except hard rock & large boulders (boulder core more than 30cm) including refilling, reinstating surface and disposing off surplus material including use of mechanical rigs with power operated winches as well as percussion/chiselling tool for advancing through occasional seams of hard strata to be employed, where necessary in Dry area.
Metre Conducting in-situ full size Plate Load Test (PLT) at selected location as per IS:1888 including making loading arrangements & casting of RCC/cast in-situ concrete footing as per codal provisions including excavation and refilling of trial pit.
Each IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY Earthwork in excavation by mechanical means (Hydraulic Excavator)/Manual Means for foundations and floors of the bridges, retaining walls etc. including setting out, dressing of sides, ramming of bottom, getting out the excavated material, back filling in layers with approved material and consolidation of the layers by ramming and watering etc. including all lift, disposal of surplus soil up to a lead of 300m, all types of shoring and strutting with all labour and material complete as per drawing and technical specification as directed by Engineer in charge. Note: This item will be used for excavation work in connection with other miscellaneous works also like side drains, foundation for OHE masts and other miscellaneous structures in connection with Gauge Conversion, Doubling, New lines.
cum Providing and laying in position Plain cement concrete of specified Nominal Mix f o r miscellaneous works like side drains, foundation for OHE masts and other miscellaneous structures excluding the cost of Cement, centering and shuttering - All work up to plinth level :
310.00 III) : 3 graded stone aggregate 20 mm nominal size) Providing and laying in position machine batched, machine mixed and machine v i b r a t e d Cement Concrete of specified grade as per approved Design Mix (mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants) using 20mm graded crushed stone aggregate and coarse sand of approved quality for the following Reinforced cement concrete structural elements up to height of 9.0 m from foundation top level, including finishing, using Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Note: 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons for not using plasticiser at the stage of Mix Design and in that case deduction shall be made as per relevant item.
11.00 ballast wall at formation level
260.00 1:3:6 with graded stone aggregate of 40mm nominal size, in foundation and floors, retaining walls of bridges including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials and labour complete but excluding the cost of cement and shuttering as per drawings and technical specifications as directed by Engineer. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
330.00 Abutments, Wing walls and Return walls etc., of new bridges with 110mm dia UPVC pipe Type A ISI marked with all contractor's men, material, transportation, all taxes as per specifications and as directed by Engineer-in-Charge.
4150.00 machine mixed and machine vibrated Cement Concrete of specified grade as per approved Design Mix, mixed in Mobile Concrete Batching/Mixing Plant at site or RMC from approved plants, (Cast in- Situ/Pre-cast) in bottom/top slab, side walls, toe wall and sumps haunch filling head walls, thrust bed or any other component using 20mm graded crushed stone aggregate and coarse sand of approved quality of RCC box of any size including finishing, Plasticiser in approved proportions (as per IS:9103), to modify workability without impairing strength and durability, complete as per drawings and technical specifications as directed by Engineer in c h a r g e . N o t e : 1. Payment for cement, reinforcement and shuttering shall be made extra under relevant item. 2. Plasticiser shall invariably be used in approved proportion to increase workability with minimum possible quantity of cement for all grade of Design Mix Concrete unless it is specifically approved citing reasons at the stage of Mix Design and in that case deduction shall be made as per relevant item.
743.60 or bitumen confirming to IS:3117- latest version on the top and sides of RCC box/slabs @ 1.70 kg/sqm after cleaning the surface with all labour and materials complete job as directed by the Engineer. Centering and shuttering including strutting, propping etc. and removal of form for :
4700.00 abutment, wing wall, retaining wall, RCC box type foundations, Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm wall etc. up to 5m above ground level
4400.00 025031 & 025032 wherever required with adequate bracing, propping etc. over initial height of 5 metres for every additional height of 1 metre or part thereof. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
922.11 box of all sizes with or without common web section including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Box pushing technique" as per approved drawings/scheme, with or without surcharge in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : 1. The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC B o x ; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. 2. In case Drag Sheet and/or Rail Cluster are to be used as per approved scheme and design, the same shall be paid extra under relevant item. 3. The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes.
922.11 t h i c k , for protection of t r a c k from subsidence while pushing the box as per design over item no. 031120. Note: The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes.
40.00 cluster below the running track to ensure safety of track during box pushing in correct position and alignment with Railway rails and contractors MS flats, wooden blocks, and 12 mm dia bolts etc., as per approved drawing including removing and filling back of ballast below track under traffic conditions of Electrified/Non-Electrified section with all contractors, labour, tools, tackles, consumables plants, and 50MT capacity crane and any other material required for execution of work in all respect with all lead and lift, transportation and as directed by Engineer in-charge. Payment quantity shall be as per the weight of rail in rail cluster used at site or as per approved drawing, whichever is minimum. Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge up to 60 kms.
MT IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
MT Loading, transportation of Precast RCC Girders / Slabs / Ballast retainers / Steel Girders etc. from Casting Yard to Site of Work, unloading and stacking at site of work at prescribed location as directed by Engineer-in-Charge above 60 kms.
MT-Km Providing and fixing various size HTS holding down bolts conforming to relevant Codes/Specification in concrete column or in other structures with proper nuts, bolts, washers/plates, grouting of holes with cement or epoxy concrete with all material, labour, T&P as a complete job.
2600.00 paid extra.
135.00 and/or bolted and/or riveted steel work in built up sections, trusses and framed work, staging, racks, Height Gauge etc. for Steel Structures other than bridge girders, using RSJ, tees, angles and channels/flats, plates, gussets, round or square bars, cleats, bolts etc., with contractors own steel including cutting, bending, straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting etc., with Providing stiffeners wherever required as per approved drawing including applying a priming coat of a approved steel primer with all contractor's materials, labour, tools & plants, lead & lift including crossing of tracks if required etc., complete as per specification and as directed by Engineer-in-charge. Note: The payment shall be made on the theoretical weight of main components and gusset plates only.
320.00 less than 35 kg each at specified bridge locations.
100.00 consolidation with all labour, lead, lift, tools, plants, crossing of tracks as per drawing and technical specification as directed by the Engineer in charge in case loose slush is encountered at site of foundation before casting the foundation or laying the filtering media.
500.00 20 mm dia. with approved fixing compound after drilling holes for grouting as per Technical Specifications including subsequent cutting/removal and sealing of the hole as necessary after completion of grouting. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY Grouting of masonry/concrete by injection process duly Sealing of cracks, through nipples complete as per Technical Specification and procedure given in IRBM Para No 209 including necessary admixture. Payment shall be as per use of cement by weight in case of neat cement/cement mortar grouting and weight of Epoxy in case of Epoxy Grouting. (Cement will be paid extra).
4200.00 compound w.r.t. cement.
450.00 consisting of granular materials of GW, GP, SW groups as per IS:1498 (latest) in required profile behind boulder filling of abutments, wing walls / return walls etc. above bed level with all labour and material complete job as per drawing and technical specification of RDSO Guidelines. Providing & laying non pressure NP-4 Class RCC pipe with collars, jointing with 1:2 cement and ordinary sand mortar including testing of joints, but excluding earthwork with all labour and material as a complete job. Cement for mortar will be paid separately.(Pipes of 600mm dia and above will be laid using crane/hydra).
320.00 return wall, retaining wall with hand packed boulders & cobbles with smaller size boulders toward the back including all lead, lift, labour & other incidental charges as complete work in all respect. Payment for boulder/cobbles will be done extra.
40000.00 from any location. Payment to be done for Hour Horse power of pump multiplied by pumping hours. Designing and developing Detailed structural and working Drawings for following items for ROB/RUB/Bridge based on Railway's approved GADs, duly collecting necessary data from Railways and R&B authorities, duly designing members and submission of check plot duly getting proof- checked by Railway approved institutes, submitting for Railway's verification and approval, making corrections duly incorporating suggestions in drawings/designs, further submission of original in transparent film paper and soft copy (CD) for Railways approval etc. with contractor's technical expertise and instruments, labour, consumables, repeatedly attending till final approval etc., complete as directed by Engineer in-charge.
2.00 23748.39 retaining wall, abutment and approach slab IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY Dismantling and removing rail of all section & length from track, laid on any type & density of sleeper by removing fish plates, fastenings & fish bolts and other materials including stacking all released materials within an average distance of 500 metres as directed by Engineer in-charge. Note: 1.Cutting of rails shall be paid separately. 2.Work to be done under traffic block.
RM Insertion of rails of all types & length in track, laid on any type & density of sleeper to the specified gauge under traffic block. Rates include fastening of rail with sleepers with standard set of fastenings and fixing of fish plates and bolts or, if required, providing gap for welding and stacking of released material without infringement within 250m as directed by Engineer-in- Charge. Note: Rail drilling and cutting to be paid separately.
RM Replacement of any type of sleepers in track with PSC sleepers lying on cess or at Bridge Approaches for casual renewal at isolated locations with all fittings complete to specified gauge & cross level with contractor's tools including packing and dressing of ballast, as directed by Engineer in-charge. Released materials shall be neatly stacked and handed over at specified location within an average lead of 250 m or near either side of Bridge approaches as directed.
Each Manufacturing, supply and stacking of machine crushed Track Ballast conforming to RDSO Specification (IRS-GE-1) with latest correction slips at Railway depot or nominated location. Note: Distance of nearest quarry mentioned in each sub-item is only for the purpose of selecting the items for preparation of estimates/tender schedule, based on the minimum distance b e t w e e n nearest quarry and centre of supply points and will not affect the selection of quarry during physical supply in any way till prescribed specification is met fully.
200.00 than 200 km and up to 250 km IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
420.00 Specifications and guidelines RDSO/2020/GE: IRS-0004 or latest in running line with suitable soil to the designed profile The work shall include uprooting and disposing of all the vegetation, benching at every 30 Cm vertical height, earthwork in benching portion and compaction using suitable slope vibratory Rollers/Compactors etc. to achieve prescribed MDD. Note: 1. Payment of cess repairs shall be based on the quantities worked out from the cross sectional calculations only and worked out from the initial ground levels before doing benching and final levels as done for new embankment. The earth work in benching portion shall not be paid extra as the same has been included in the rate. 2. The earth work shall be started only after Completing of the benching and certified. 3. The benching Work shall be done for a maximum height of 1.50 m at any time based on the progress of earthwork starting from toe of the embankment.
210.00 making cess on other side of the track (when no approaches available along track or no road vehicles to work at site) by dumping contractor's own earth, collected along toe of bank of any height on to other side of track & side slope of the existing bank by head load, duly crossing of tracks with all contractor's materials, labour, tools, plant including loading of earth in baskets, lifting, leading to the non-cess side of bank including crossing of tracks & dumping etc. and as directed by the Engineer in-charge.
210.00 available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. First or Second Through Packing of track of all sleeper density including giving a general lift, as desired to eliminate sag after Deep Screening work, lifting of track, lowering of track and major realignment of curves and formation rehabilitation as per procedure prescribed in latest edition of IRPWM. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
200.00 of 1660 IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY Third or subsequent Through Packing of track for all sleeper density including picking of slacks, as required after second through packing, subsequent to Deep Screening work as per procedure prescribed in latest edition of IRPWM. This item can also be used after lifting/regrading/realignment works also. Note: General lift is normally 25 mm and isolated lift may be up to 50 mm.
8.00 approach sleepers on either sides giving required lift to make up general track level, packing and profiling as directed. Quick cutting with abrasive rail cutter of all types of rail sections including wear resistant, head hardened rails up to 110 UTS, with contractors tools & plants, equipment, consumable with all lead & lift etc. complete as directed by Engineer in- charge. Abrasive Rail Cutter will be as per RDSO Specification No. TM/SM/1 (Rev. 01 of 2012) with latest status of RDSO; Rail Cutting Wheel Abrasive Disc will be as per RDSO Specification No.TM/SM/2 (Rev. 01 of 2020)
Each Drilling holes of 16 mm to 32 mm dia. with Rail Drilling machine including chamfering with appropriate chamfering tools in all types of rail section with contractor's tools & plants, equipment, consumable with all lead & lift etc. complete, as directed by Engineer in-charge. Rail Drilling Machine will be as per RDSO Specification No. TM/SM/3, dated 24.04.1991.
80.00 Crossing, blocks, bolts & nuts and stacking these in a countable manner near LC, free from any infringements as directed by Engineer in-charge.
and sleepers/blocks required for matting and bearing as per approved design for use below and above CC Crib for insertion of Temporary Girder etc.. Note: The item is for one time use and released wooden sleepers/blocks shall be the property of the Contractor. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY Manufacturing, fabricating and supplying retro-reflective Engineering Indicator boards, made of 2mm thick aluminium sheet or 3mm thick aluminium composite sheet, face to be fully covered with high intensity encapsulated type heat activated retro- reflective sheeting conforming to type-IV of ASTM-D4956-01 in yellow & black or other colour combination including subject matter, message, symbols, borders etc. as approved by Engineer In-charge or as per IRPWM guidelines, pasted on substrate by an adhesive backing which shall be activated by applying heat and pressure conforming to class-2 of ASTM-D-4956-01 and fixing the same with suitable sized aluminium alloy rivets @ 20 cm c/c to back-support frame of M.S. angle iron of size 25mm x25mm x 3mmprovided all along the edges of board with theft resistant measures back side of board shall be with non-peelable weatherproof paint, consisting of one coat of zinc chromate primer and two coats of epoxy paint. Vertical post shall have black & white anti-corrosive paint or powder coating complete, as directed.
Indicator 1400mmx400mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long
4.00 triangular shape having each side of 1000mm with back support frame fixed to vertical post of MS angle of size 50mmx50mmx6mm of 3650 mm long
4.00 shape having diameter of 1000mm with back support frame welded to vertical post of MS angle of size 50mmx50mmx6mm of 3950 mm long Erection or removal of temporary Engineering Indicator Board or any other board at specified locations without causing infringement to track etc. complete and as directed.
Each Hiring of machinery for minor miscellaneous works for short duration including operator/driver, fuel, lubricants and consumable. The contractor shall arrange all statutory permits as required by rules and regulations prevailing in the area of work. Payment shall be made for actual working hours at site.
200.00 with minimum 1.10 cum bucket capacity
40.00 crane of 12T capacity for misc. works of handling of material IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
200.00 the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. Total 58926602.73
Item Breakup - C-USSOR-2021.(Reinforcement)
625500.00 Fe-500D or more of approved brands/makes. Total 62518725.00
Item Breakup - D-USSOR-2021.(Cement)
43 approved brands/makes Total 11632561.60
Item Breakup - E-NS Items.
Supplying & driving the cold twisted MS Kg sheet piles generally 10 mm and 10 meter deep below formation level having interlocking design and taken out the same after launching with all necessary vibro hammers and other T&P equired as a complete job. It includes all necessary labour and material, cost of all T&P, all leading, loading, transportation of the same with all toll taxes (To and Fro), GST and other applicable taxes as per extent rules, all ascent, descent, crossing of track, cost of all fuels and lubricants, the necessary arrangement of lighting, camping at site etc. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
Providing lighting arrangement during night Hour block to be availed between 20.00 Hrs (night)t to 6.00 Hrs. (morning) in the section os ADEN/ on hiring basis with contractors generator of minimum 5 KVA capacity 6 halogen lamps of 500 watt operation and maintenance of generator set & Halogen lamps with his own labour,T&P transportation etc.The payment will be done for only that day when Site Engineer actually required .Standby arrangement has to be ensured by agency for any possible failure as block may be brust on this account only.
Providing & applying two or more coats of Sqm Aliphatic Acrylate Paint (Anti Carbonation paint) of approved brand and manufacturer over a coat of Primer of approved brand to give a smooth and even finish as per Technical specification including preparation of surface by grinding the segment joints, complete in all heights (viaduct and station), as directed by Engineer-In-Charge. The rates includes all materials, Labour, tools, plants, equipment, skylifts etc. Nothing shall be paid extra on this items.
Taking out old hand pump machine and Each lowering in another new boring with repairing and charging of leather bucket, sheet valve etc. (Exe. The costt of material charged)
Providing and fixing permanently colour Sqm coated trapezoidal profiled sheet of depth 28-30mm at 195-205mm pitch distance with precisely engineered "Rib & Flute" design. Profiled sheets shall be min. 0.5mm CT/0.45mm BMT high tensile zinc aluminium alloy coated zincalume / galvalume steel sheet (550 mpa yield strength) having a coating of mass of 150 gsm zinc-aluminium coating AZ-150 total on both sides as per, AS 1397:1993 finished with 20 microns approved colour coating of Silicon Modified Polyester (SMP) / Super Polyester paint coat on exposed surface over a primer coat of 5 microns and a back coat of 5 microns on reverse side over a 5 microns primer coat. There shall be 2 small ribs /square flutes between profiles for providing additional strength. The sheet to be fixed over the purlins with hexagonal head self drilling suitable fasteners with neoprene / EPDM washer on crests of the sheet
Supplying and fixing of 6 mm thick Sqm Polycarbonatesheet LEXAN or equivalent suitable to required shapeand colour with alluminium alcox section, EPDM rubbergasket and sealent to make it leak proof i/c requiredscrew, scaffolding, labour and T & P etc. as perdrawing and direction og Engineer in charge. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
Maufacuring, fabrication and erectiing in MT position Gate post, Whistle board, Curve boards, Shunting limit board, Wicket gate, Curve marker, Rail fencing etc. including concreting of fundation as per approved drawing with all material(rail, steel section, sheets, cemebt required for this shall be supplied by the Railway free of cost at the Railway station/PWI/IOW's stores). (Excavation in foundation & cement will be paid seprately).
Preparation of drawing through Auto Cad as Sqm per direction of Engineer in-charge.
Cost of Portland Cement (OPC-43 Grade)
Topographical Survey plan with total station Per machine atshowing all necessary details as Day level of Track, roads, drains, locacation of link road, temple, masjid, school, community centre, shops, houses and other required & temporary structures i/c permanent submission of all plans, map, cross sections etc. complete in all respect i/c all taxes and GST as per direction of Engineer in charge at site.
Supply and fixing of PPGI PUF porta cabin Sqm with varandah (2400mm X 1800mm cabine size & 2400mm X 1800mm verandah size height 2745mm to 3050mm). The structure contain MS pipe for verandah section, PPGI sheet profile sections, 50mm thick PPGI PUF PPGI panels side wall, 30/60mm thick corrugated PPGI PUF PPGI roofing pannels & 910mm X 1980mm size PPGI PUF PPGI door (01 No.) with 03 nos. 910mm X 910mm aluminium sliding window. All materials as per standards quality and as approved by site Enginner
Carring out soil investigation at site for Job bearing capacity and other parameters for designing the foundation for the satisfaction of engineer in charge at the required depth as per the direction of engineer incharge. The quoted rates will including the cost of submitting the soil test report from the agency of reputed as approved by the site engineer incharge (with contractors own tools and eqipment if required) as per special conditon of contract.The method of testing will be as per the direction of site Engineer. IZZATNAGER DIVISION-ENGINEERING/NORTH EASTERN RLY
Insertion of temporary girder in place of Each formation involving dismantling of track, removalof ballast and neatly stacking for future use, excavation & installation of CC crib or woodencrib at both ends as per approved design in one or more traffic blocks, excavation forcreating space for insertion of girder as required, placement of girder by contractor'sCrane, tools & plants, filling of earth/sand filled bags at different stages as required,linking of track and connecting with the approaches, ballasting, boxing and packingapproach sleepers to make track fit for 20 kmph to the satisfaction of Engineer in-charge.Note: 1. The CC Cribs as required and Temporary Girder shall be supplied by Railways atavailable location. 2. Transportation of Temporary Girder to site shall be paid separatelyunder relevant item. 3. The charges for wooden sleepers/blocks required for matting andbearing as per approved design shall be paid extra as per relevant item. 4. In case bridgetimber / channel sleepers are required to be laid on girder, the same shall be paidseparately under relevant item.RH /Temporary girder of length above 16.3m and up to 26.00 using Road crane capacity required as per site condition.
Removal of temporary girder, crib on both Each ends and placing temporary girder on crib /cess away from Railway track as directed by engineer at site under traffic block; filling ofRailway's earth by ramming, pulling ballast from stack / adjoining track / same track,laying track, linking with approach track and packing of ballast for opening track at 20kmph speed, boxing & dressing of cess, ballast profiling etc. Note: If earth is to bebrought by contractor from outside, the same will be paid separately.RH /Temporary girder of length above 16.3m and up to 26.00 using Road crane capacity required as per site condition.
Designing and Preparation of all Drawings of Job LHS no 36 SPL with design as per Railway loading and as per Code/Relevant IS code duly checked by Government Engineering college/IIT. Submission of report in three copies. Total 20191992.10
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
HQletterregardingmaintinanceperiodofLHS.pdf
ATTACHMENT
SFMSPolicyBGverificationviaSFMS.pdf
ATTACHMENT
SpecialConditionforpushingmethodFinal1.pdf
ATTACHMENT
GCC2022LatestcorrectionslipupdateduptoACS11.pdf General Condition of Contract
ATTACHMENT
Instructionstotendererwithspecialconditions.pdf
ATTACHMENT
PowerofAttorneyspecialcondition.pdf
ATTACHMENT
HQJPO_Digginginthevicinityofcable_20.05.24.pdf
ATTACHMENT
TrackConditionnew.pdf
ATTACHMENT
GCC2022LatestcorrectionslipupdateduptoACS11.pdf
ATTACHMENT
Download all tender documents and submit your bid