| 1 | L1₹60.0 LAccepted-AOC | ₹60.0 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹63.2 L+₹3.2 L (5.38%)Rejected-Finance R 7 10 RAJ NAGAR GHAZIABAD GHAZIABAD GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | ₹63.2 L+₹3.2 L (5.38%) | L2 | Rejected-Finance AS PER ATTACHED REPORT |
| 3 | Rejected-Technical | - | - | Rejected-Technical AS PER REPORT ATTACHED |
| 4 | Rejected-Technical | - | - | Rejected-Technical AS PER REPORT ATTACHED |
| 5 | Rejected-Technical | - | - | Rejected-Technical AS PER REPORT ATTACHED |
Tender Value
₹63.8 L
EMD Value
₹1.6 L
Closing Date
16 Jun 2021, 3:00 pmClosed
ND RAM DE AHQ
BSNL, D. G. M Telecom Projects. D-TAX Hall, Near Parking Area, Eastern Court Complex, Janpath, New Delhi-110001
E-Tender for Laying PLB pipe/ Duct and Associated works by Open Trench Method/Trenchless Technology, Optical Fibre Cable Pulling/Blowing and splicing works etc.,for Sarai Kale Khan- Noida Sec 62- Raj Nagar Ghaziabad (RDC) 48 F OFC route.
2021_BSNL_78091_1
T03_813_21_22
Open Tender
OFC Laying Works
Works
365 days
NEW DELHI NCR
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
Yes
ACCOUNTS OFFICER TP NCR
₹1.6 L
Yes
2 Jul 2021
25 May 2021
17 Jun 2021
25 May 2021
16 Jun 2021
25 May 2021
EXCAVATION OF TRENCHES Horizontal Directional Drilling for laying of U/G PLB/HDPE Pipes upto 50mm dia to a standard depth of 1.65m as specified in laying of practices of OF Cable by HDD method and pulling of signle pipe
LAYING OF PLB UPTO 50mm DIAMETER AND JOINING WITH COUPLER (Material to be supplied by BSNL). Laying & fixing of PLB Pipe with GI clamps (inside building or area which is not exposed to sunlight) as per specifications along with supply of GI clamps (4mm thickness, 25mm width) and all installation materials. Clamp spacing should be approx 1M to take care of the load.
OFC PULLING ( OF Cable & Accessories to be supplied by BSNL) Pulling of O.F. Cable and allied works ( viz. Replacing couplers and Back Filling in case of Manholes, Sealing of PLB ends, refilling sand, Refixing RCC cover and backfiling in case of Joint Chamber/Manholes. No charges to be paid for opening of Manholes/Joint Chambers. Upto 48 F
BORING AND CC WORKS. Providing CC protection of size 20 cmx20 cm in the ratio of 1:2:4 for encasing PLB Pipe / GI Pipe/DWC pipe in Roads, bridges, Crossings and Culverts and for low depth protection, or on wheel guard of bridge as specified in the construction practices of OF cable construction, including material.
JOINTING CHAMBER/HAND HOLE. Construction of joint chamber, with brick soling base, of inner size of 1.2Mx1.2Mx1M made of full brick thick wall with RCC cover (1:2:4 ratio) slab of size 1.7Mx1.7Mx0.1M using 10mm dia TMT bar 150mm centre to centre both ways. All five internal surfaces should be plastered (1:3 ratio). Scope includes required excavation, backfilling with clean sand and all above operations including supply of materials. Details as per specification.
ROUTE/ JOINT INDICATOR Supplying, fixing and concreting of route/joint indicator, painting and sign writing of Route/Joint Indicators, as per specification
CABLE SPLICING AND TERMINATION WORKS Splicing of all the fibers of OF Cable laid at every joint within specified splicjng loss rage ( < = 0.02dB) and making ternination at the ends. All materials and labour except Joint Closoures to be supplied by Bidder/Vendor. For 48 Fibers
Documentation of /route Index Diagram in Soft and Hard copies. ( Three sets of each ) and Recovery of Empty Drum Documentation of Route Index Diagram in soft soil and hard copies ( Three sets of each )
Description of Work / Item(s)
EXCAVATION OF TRENCHES Horizontal Directional Drilling for laying of U/G PLB/HDPE Pipes upto 50mm dia to a standard depth of 1.65m as specified in laying of practices of OF Cable by HDD method and pulling of single pipe
LAYING OF PLB UPTO 50mm DIAMETER AND JOINING WITH COUPLER (Material to be supplied by BSNL). Laying & fixing of PLB Pipe with GI clamps (inside building or area which is not exposed to sunlight) as per specifications along with supply of GI clamps (4mm thickness, 25mm width) and all installation materials. Clamp spacing should be approx 1M to take care of the load.
OFC PULLING ( OF Cable & Accessories to be supplied by BSNL) Pulling of O.F. Cable and allied works ( viz. Replacing couplers and Back Filling in case of Manholes, Sealing of PLB ends, refilling sand, Refixing RCC cover and backfiling in case of Joint Chamber/Manholes. No charges to be paid for opening of Manholes/Joint Chambers. Upto 48 F
BORING AND CC WORKS. Providing CC protection of size 20 cmx20 cm in the ratio of 1:2:4 for encasing PLB Pipe / GI Pipe/DWC pipe in Roads, bridges, Crossings and Culverts and for low depth protection, or on wheel guard of bridge as specified in the construction practices of OF cable construction, including material.
JOINTING CHAMBER/HAND HOLE. Construction of joint chamber, with brick soling base, of inner size of 1.2Mx1.2Mx1M made of full brick thick wall with RCC cover (1:2:4 ratio) slab of size 1.7Mx1.7Mx0.1M using 10mm dia TMT bar 150mm centre to centre both ways. All five internal surfaces should be plastered (1:3 ratio). Scope includes required excavation, backfilling with clean sand and all above operations including supply of materials. Details as per specification.
ROUTE/ JOINT INDICATOR Supplying, fixing and concreting of route/joint indicator, painting and sign writing of Route/Joint Indicators, as per specification
CABLE SPLICING AND TERMINATION WORKS Splicing of all the fibers of OF Cable laid at every joint within specified splicjng loss rage ( < = 0.02dB) and making ternination at the ends. All materials and labour except Joint Closoures to be supplied by Bidder/Vendor. For 48 Fibers
Documentation of /route Index Diagram in Soft and Hard copies. ( Three sets of each ) and Recovery of Empty Drum Documentation of Route Index Diagram in soft soil and hard copies ( Three sets of each )
Eagle Construction Company
Eagle Construction Company
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .