Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.2 L+₹3,059.45 (2.53%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.6 L+₹39,078.95 (32.3%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.8 L+₹60,289.95 (49.9%)Rejected-Finance | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | SHRI PAWAN KUMAR L2 | M/S TANVI CONTRACTOR L3 | RR CONSTRUCTION L1 | M/S M. S INFRACON L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting jhunds and moonj with disposal away from site. | 250 | M2 | 10 ₹2,500 Lowest | 28.5 ₹7,125 | 19.6 ₹4,900 | 15 ₹3,750 |
| 2.00 | Cleaning thick bushes and thorny jungle without uprooting. | 5,065 | M2 | 2 ₹10,130 Lowest | 4.3 ₹21,779.5 | 5.43 ₹27,502.95 | 6 ₹30,390 |
| 3.00 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 3,590 | M3 | 31 ₹1,11,290 | 36.5 ₹1,31,035 | 24.64 ₹88,457.6 Lowest | 40.95 ₹1,47,010.5 |
Tender Value
₹2.1 L
EMD Value
₹5,000
Closing Date
25 May 2026, 11:00 amClosed
Executive Engineer
L.M.B.D.G.C., Mathura
Internal clearance work of Pirsua Drain Between Km. 11.600 to 13.500
2026_UPIDC_1148556_8
01EE Lower Mat 2026-27
Open Tender
Civil Works - Canal
Item Rate
10 days
L.M.B.D.G.C.
Please refer Tender documents.
2 documents required · 2 mandatory
₹589
₹5,000
8 Jun 2026
20 May 2026
25 May 2026
20 May 2026
25 May 2026
20 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting jhunds and moonj with disposal away from site. | 250 | M2 | - | - |
| 2 | Cleaning thick bushes and thorny jungle without uprooting. | 5,065 | M2 | - | - |
| 3 | Earth work in Silt clearance in bed of drain including lift upto 1.50m and lead upto 6.0 m by machines with rough/partial dressing. the earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by engineer in charge. (By Poclain) | 3,590 | M3 | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_2150013.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .