Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.1 LAccepted-AOC | ₹10.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.8 LRejected-Finance V P O NIZAMPUR NIZAMPUR 132103 | PANIPAT | HARYANA | 132103 | ₹10.8 L | L2 | Rejected-Finance L2 |
| 3 | L3₹11.8 LRejected-Finance | ₹11.8 L | L3 | Rejected-Finance L3 |
| 4 | L4₹11.9 LRejected-Finance | ₹11.9 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | the ridhi sidhi co operative labour and const society L2 | THE EKTA CO-OP L AND C SOCIETY LTD. L4 | THE SHREE SHYAM CO-OP L AND C SOCIETY LTD. PANIPAT L1 | THE EXPRESS COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD PANIPAT L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Covering of pothole with ready mix shellmac material duly approved from CRRI including cost of material, its supply to the site and labor for procedural laying of the same in complete satisfaction of engineer-in-charge. The weight of the bag should no be less than 50 kgs and bitumen content and design mix should be as per norms fixed by MORTH/CRRI. Note: - The metal requires for filling of pothole will be measured and paid separately.............. | 50 | Bag | 700 ₹35,000 | 1,250 ₹62,500 | 1,000 ₹50,000 | 960 ₹48,000 |
Tender Value
₹12.5 L
EMD Value
₹25,000
Closing Date
15 May 2026, 12:00 pmClosed
Gopal Kalawat
Municipal Corporation Panipat
Regarding Repairing of Damaged Culverts, pothole drains and patchwork in various wasrd of west side of urban Division for the redressal of complaints received in Mhari Sadak portal in ward no. 24, under M.C Panipat urban Area For L and C Society
2026_HRY_520040_1
2026F8F224B1 9F2F 463B AF72 257CD102E8AD286ULB
Open Tender
Civil Works
210 days
Panipat
2 documents required · 2 mandatory
₹1,000
₹25,000
Yes
13 Jun 2026
7 May 2026
15 May 2026
7 May 2026
15 May 2026
7 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Covering of pothole with ready mix shellmac material duly approved from CRRI including cost of material, its supply to the site and labor for procedural laying of the same in complete satisfaction of engineer-in-charge. The weight of the bag should no be less than 50 kgs and bitumen content and design mix should be as per norms fixed by MORTH/CRRI. Note: - The metal requires for filling of pothole will be measured and paid separately.............. | 50 | Bag | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_598929.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid