| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.8 LAccepted-AOC | L1 | Accepted-AOC Accepted as lowest bidder | |
| 2 | L2₹38.3 L+₹47,223 (1.25%)Rejected-AOC NOT MENTIONED | L2 | Rejected-AOC Rejected due to higher bid | |
| 3 | L3₹39.7 L+₹1.9 L (5.11%)Rejected-AOC HAMIRPUR ROAD NEAR BUS STAND UNA DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | L3 | Rejected-AOC Rejected due to higher bid | |
| 4 | L4₹43.1 L+₹5.3 L (14.0%)Rejected-AOC | L4 | Rejected-AOC Rejected due to higher bid | |
| 5 | L5₹44.0 L+₹6.3 L (16.6%)Rejected-AOC VILLAGE AND POST OFFICE JEORI TEHSIL RAMPUR DISTT SHIMLA H P | JEORI | SHIMLA | HIMACHAL PRADESH | L5 | Rejected-AOC Rejected due to higher bid |
Tender Value
₹49.2 L
EMD Value
₹81,310
Closing Date
25 Feb 2023, 11:30 amClosed
Executive Engineer
Jal Shakti Division, Baddi District Solan (HP)
Replacement and Automation of pumping machinery of various Water Supply Schemes of Tube well Sub Division Baddi in Doon area of Solan District (HP) Job No.-2.
2023_HPIPH_69168_1
8084-8183 Dated 16/02/2022
Open Tender
Civil Works - Others
Item Rate
180 days
Baddi
Please refer Tender documents.
6 documents required · 6 mandatory
₹800
₹81,310
Yes
13 Jun 2023
17 Feb 2023
25 Feb 2023
17 Feb 2023
25 Feb 2023
17 Feb 2023
Amount
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kathloh Tujhar(Booster Stage).
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 4.10 LPS Head = 25.00 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kathloh Tujhar Booster stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kathloh Tujhar) (1st Stage).
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the followingrequirements.
1 set of duty condition discharge of = 4.10 LPS Head = 317.78 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kathloh Tujhar Ist Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kathloh Tujhar) (2nd Stage).
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 3.45 LPS Head = 236.49 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kathloh Tujhar 2nd Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Patta Kaunta)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 12.00 LPS Head = 195.99 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Patta Kaunta).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Beh Mandi (1st Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 2.06 LPS Head =107.04 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Beh Mandi) (Ist Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Beh Mandi) (2nd Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 3.74 LPS Head = 355.50 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Beh Mandi. (2nd stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kaintha Chadyar) (Booster Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 4.20 LPS Head = 25.00 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kaintha Chadyar.(Booster Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kaintha Chadyar)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 4.20 LPS Head = 501.00 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kaintha Chadyar).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kandol Tujhar (Booster Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 1.94 LPS Head = 24.00 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kandol Tujhar. (Booster Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kandol Tujhar) (1st Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the following requirements.
1 set of duty condition discharge of = 1.94LPS Head = 280.51 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kandol Tujhar (Ist Stage).
Supply and erection of Centrifugal pumping machinery with allied accessories of LWSS Kandol Tujhar) (2nd Stage)
PUMPING MACHINERY CENTRIFUGAL:- Supply ,Installation ,Testing & Commissioning of star rated energy efficient horizontal spindle, horizontal/ radial split casing/end suctions (back pull out arrangement)single/ double/ multistage centrifugal pump suitable for operation, in parallel of recommended make such as Mather and platt/ KSB/Kirloskar/Jyoti /Beaconweir BS&BE or any other approved make confirming to BIS-1520-1980 with upto date ammendments, read with IS:9137-1978 or latest edition suitable for lifting clear water for under mentioned characteristics with bronze/Bronze with 2.5% Nickel impellers, dia of 405 mm priming funnels, casing ring and shaft sleeves of bronze/ steel, shaft of SS:410/AIS 1431 Chrom in plated with cast iron casing coupled directly through a flexible coupling on a Common MS base plate to squirrel cage screen protected drip proof induction motor/TEFC/CACA of standard make such as Kirloskar/BHEL/ Crompton/NGEF/GEC/ Siemens / Jyoti/Area Brown Boven (ABB)/CGL and suitable for operation on 11 KV HT, 50 cycles/second 3 phase AC electric supply. The power of electric motor/motors should be at least (+) 10% in excess of the maximum power required by the pump / pumps in the operation range of (+) 10% and (-) 15% of the duty point head. The motor/ motors should be as per IS: 325-1978 with upto date amendments read with IS:900-1972. The starting current of the motor shall be limited to not more than 4.5 to 5 times of full load current. It should include cost of bearing nuts, bolts and painting etc and should meet the following requirement including Pump sets (working + standby), , the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender. The rates shall be for complete Job to run the machinery in proper working. The pump set should include Base plate, water level guards, erection clamps, cable clips, depth gauge of approved class etc. The work should be completed to the entire satisfaction of the Engineer-in Charge. The HP are indicative, the design/drawings of Pumping Machinery is to be got approved by L-1 Contractor from the competent authority before placing supply order for the same after finalisation of tender The rates shall be for complete Job to run the machinery in proper working. The pumping machinery & its accessories etc should meet with the followingrequirements.
1 set of duty condition discharge of = 1.94LPS Head = 251.21 Mtr
The BHP is to be offered by the bidder and rate shall be filled in by the contractor per set.
1 No. panel (Suitable for above P/M of LWSS Kandol Tujhar.(2nd Stage).
ShriBalajiEnginearingWorks
SS ENGINEERING WORKS
SACHN KUMAR
NARAYAN SINGH
ROYAL ENGINEERING WORKS
GREWALSUBMERSIBLE AND ELECTRICAL SERVICE
ANITA KUMARI CONTRACTOR
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .