Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC 106 VISHNUPURI COLONY CIVIL LINE DISTT GONDA | GONDA | GONDA | UTTAR PRADESH | L1 | Accepted-AOC Due to L1 | |
| 2 | L2₹10.6 L+₹40,651.96 (3.98%)Rejected-Finance BAJPAI COLONY LAKHIMPUR KHIRI | LAKHIMPUR KHIRI | LAKHIMPUR KHERI | UTTAR PRADESH | L2 | Rejected-Finance Rejected due to higher rate to L1 | |
| 3 | L3₹14.9 L+₹4.6 L (45.3%)Rejected-Finance | L3 | Rejected-Finance Rejected due to higher rate to L1 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
23 Nov 2020, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer HDSC hardoi
Construction of VRB at km. 15.080 of Bhadaicha dy.
2020_UPIDC_528869_2
03/E.E./22020-21
Open Tender
Civil Works - Canal
Item Rate
60 days
Hardoi
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,266
₹1.5 L
Yes
10 Mar 2021
18 Nov 2020
23 Nov 2020
18 Nov 2020
23 Nov 2020
18 Nov 2020
90 days
Amount
Earth work in exavation of foundation for masonary work including lead & lift with back filling and compection required for proper compection of work.
Centering and shuttering for CC work including cost of shuttering material, labour & T&P etc, required for proper compection of work.
Cement concrete 1:3:6 in foundation with course sand and stone ballast 25-40 mm size including cost of all labour and material etc, required for proper compection of work.
M-150 brick work in 1:4 cement and coarse sand including cost of all material, labour & T&P etc,required for proper compection of work.
Centering and shuttering for RCC work including cost of shuttering material,labour & T&P etc, required for proper compection of work.
Supplying and placing of steel reinforcement per MT including Cutting, bending, binding & placing in position reinforcement including cost of all material, labour & T&P etc.
cement concrete 1:1.5:3 in foundation with course sand and stone ballast 25-40 mm size including cost of all labour and material etc, required for proper compection of work.
Cement pointing in 1:2 cement and coarse sand and mortar including cost of all material, labour & T&P etc, required for proper compection of work.
Earth work in correcting channel of section and making ramps and diversion including all lead & lift with dressing and compection required for proper compection of work.
Dry brick on end soiling including preparation of sub grade and filling joints with local earth.
M/S SHIV CONSTRUCTION
S.S.ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .