Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED | |
| 2 | L2₹6.9 L+₹128.25 (0.02%)Rejected-Finance | L2 | Rejected-Finance QUOTA 2ND LOWEST | |
| 3 | L3₹6.9 L+₹178.25 (0.03%)Rejected-Finance 01 BALIA BALIA SAGARDIGHI MURSHIDABAD WEST BENGAL 742237 | MURSHIDABAD | WEST BENGAL | 742237 | L3 | Rejected-Finance QUOTA 3RD LOWEST |
| Sl No | Description | Qty | Unit | SANTOSH DASMAHAPATRA L1 | M/S SHYAMSUNDAR PAL L2 | DAS ENTERPRISE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Brick Aggregate (single size):50 mm nominal size | 52.97 | cum | 1,499 ₹79,408.03 Lowest | 1,500 ₹79,461 | 1,500 ₹79,461 |
| 2.00 | Moorum | 12.64 | cum | 116 ₹1,465.78 Lowest | 117 ₹1,478.41 | 117 ₹1,478.41 |
| 3.00 | Carriage of Carriage of Moorum | 12.64 | cum | 622 ₹7,859.59 Lowest | 623 ₹7,872.23 | 623 ₹7,872.23 |
| 4.00 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 12.64 | cum | 61 ₹770.8 Lowest | 61 ₹770.8 Lowest | 61 ₹770.8 Lowest |
| 5.00 | Polythene sheet (150 gm per sqm) | 97.2 | kg | 109 ₹10,594.8 Lowest | 109 ₹10,594.8 Lowest | 109 ₹10,594.8 Lowest |
| 6.00 | Stone Aggregate(single size): 10 mm nominal size | 27.22 | cum | 1,633 ₹44,443.73 Lowest | 1,633 ₹44,443.73 Lowest | 1,633 ₹44,443.73 Lowest |
| 7.00 | Stone Aggregate(single size):20 mm nominal size | 55.4 | cum | 1,800 ₹99,727.2 Lowest | 1,800 ₹99,727.2 Lowest | 1,800 ₹99,727.2 Lowest |
| 8.00 | Portland Cement | 39.66 | tonne | 5,717 ₹2,26,722.5 Lowest | 5,717 ₹2,26,722.5 Lowest | 5,717 ₹2,26,722.5 Lowest |
| 9.00 | Carriage of Stone aggregate below 40 mm nominal size | 82.62 | cum | 623.3 ₹51,497.05 Lowest | 623.3 ₹51,497.05 Lowest | 623.3 ₹51,497.05 Lowest |
| 10.00 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 82.62 | cum | 77 ₹6,361.74 Lowest | 77 ₹6,361.74 Lowest | 77 ₹6,361.74 Lowest |
Tender Value
₹8.6 L
EMD Value
₹17,200
Closing Date
3 Oct 2026, 5:45 pmClosed
BLOCK DEVELOPMENT OFFICER, MOHANPUR DEV. BLOCK
OFFICE OF THE BLOCK DEVELOPMENT OFFICER, MOHANPUR
42 SUPPLYING OF MATERIALS FOR CONSTRUCTION OF CC ROAD FROM SAMSAN TO PRABIR PATRA LAND UNDER TANUA GP FUND-VBG RAMG
2026_ZPHD_5023065_1
E-01(42)/VBG-RAMG/BDO/MNP OF 2026-27
Open Tender
CIVIL WORKS
Item Wise
30 days
TANUA
Please refer Tender documents.
3 documents required · 3 mandatory
₹800
₹17,200
Yes
7 Oct 2026
9 Sept 2026
6 Oct 2026
9 Sept 2026
3 Oct 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Brick Aggregate (single size):50 mm nominal size | 52.97 | cum | 1,500 | ₹79,461 |
| 2 | Moorum | 12.64 | cum | 117 | ₹1,478.41 |
| 3 | Carriage of Carriage of Moorum | 12.64 | cum | 623.3 | ₹7,876.02 |
| 4 | Loading unloading & stacking lime, moorum, building rubish and similar miscellaneous material | 12.64 | cum | 62 | ₹783.43 |
| 5 | Polythene sheet (150 gm per sqm) | 97.2 | kg | 110 | ₹10,692 |
| 6 | Stone Aggregate(single size): 10 mm nominal size | 27.22 | cum | 1,633 | ₹44,443.73 |
| 7 | Stone Aggregate(single size):20 mm nominal size | 55.4 | cum | 1,800 | ₹99,727.2 |
| 8 | Portland Cement | 39.66 | tonne | 5,717 | ₹2,26,722.5 |
| 9 | Carriage of Stone aggregate below 40 mm nominal size | 82.62 | cum | 623.3 | ₹51,497.05 |
| 10 | Loading unloading & stacking Sand/ stone aggregate (less than 40mm nominal size) | 82.62 | cum | 77 | ₹6,361.74 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.05 MB
SOQ.pdf
Tender Documents • 1.50 MB
BIDDERS1.pdf
Tender Documents • 0.00 MB
BOQ_5106037.xls
BOQ • 0.33 MB
BIDDERS1.pdf
PDF • 0.00 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .