Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹78.3 LAccepted-Finance ANAND SOJITRA ROAD VALLABH VIDHYANAGAR VALLABH VIDHANAGAR VALLLAB VIDHYANAGAR ANAND GUJARAT 388120 | ANAND | GUJARAT | 388120 | ₹78.3 L | L1 | Accepted-Finance OEM Firm |
Tender Value
Refer Docs
Closing Date
8 Sept 2022, 2:00 pmClosed
Comdt N Giri
CGDHQ-11 Bogmalo Post Chicolna Goa PIN-403806
Repair on out put shaft assembly of port gear box onboard ICGS Sangram at Goa
2022_ICG_547498_1
D-11/Sangram/MW-01/22-23 dated 25 Aug 22
Single
Miscellaneous Works
Lump-sum
180 days
CGDHQ-11 Bogmalo Post Chicolna Goa
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
19 Sept 2022
25 Aug 2022
9 Sept 2022
25 Aug 2022
8 Sept 2022
25 Aug 2022
25 Aug 2022 - 8 Sept 2022
Permanent repairs on Port Gear Box (Make- M/s Elecon Engg CO Pvt Ltd, Vallabh Vidhyanagar, Gujrat, Model- ASL-69)output shaft flange hair line crack to be carried out as per OEM firm’s recommendations onboard ICGS Sangram at Goa. Scope of Job as below:-
A Scope of work onboard - Removal of output shaft assembly with damaged flange fitted in port Gearbox a Draining of Gearbox oil b Disconnection of all electrical connections from junction box for electrical sensors c Disconnection of all hydraulic system pipes of Gearbox auxiliaries near vicinity of Gearbox top casing d Removal of all auxiliaries (i.e. Built-on sea water pump, Turning gear with motor, Built on secondary lub oil e Removal of all bearing RTDs f Disconnection/ removal of pressure switches g Disconnection/ removal of instrumentation piping in local indication panel h Removal of LIP if required j Dismantling of output shaft plain bearing housing top half for removal of ahead & astern thrust pads k Removal of output shaft pain bearing top cover L Lifting of Gearbox top housing m Dismantling of output shaft assembly from the Gearbox and preparation for transporting to Elecon B Transportation to Elecon a Transportation of the removed output shaft assembly to Elecon C Scope of work at Elecon – Dismantling off output shaft assembly and removal of bull gear for re-use a Removal of bull gear from damaged output shaft- either using hydraulic press & maximator or by boring of output b Dimensional inspection of bull gear and its bore (based on dimension of bull gear bore, tolerance to be maintained in the new output shaft) D Machining of new output shaft: * Cost not included in the scope of this work E Scope of work at Elecon – Assembly of output shaft using new shaft and old bull gear a Fitment of old bull gear on the new output shaft by shrink fit F Transportation return a Transportation of new shaft assembly for delivery onboard G Scope of work onboard – Fitment of output shaft assembly in Port Gearbox and boxing up the Gearbox a Fitment of the output shaft assembly into the Gearbox b Fitment of all mechanical, hydraulic and electrical parts removed at Ser A and boxing up the gearbox for trials H Harbour Trials a Harbour Trials J Sea Trials a Sea Trials
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_612211.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .