Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹9.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.7 L+₹39,263.28 (4.21%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹9.8 L+₹49,079.10 (5.26%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹9.8 L
EMD Value
₹29,447
Closing Date
22 Sept 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
Repair work of damaged roads by patching at various places in Ward 90 Shaheednagar III.
2026_DOLBU_1184978_79
131/Nirman/2026-27 Date 10.09.2026
Open Tender
Civil Works
Percentage
CE
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
₹29,447
28 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | FOR B.C | 1,159.46 | SQM | 17.6 | ₹20,406.5 |
| - | For D.G.B.M | 115.99 | SQM | 21.7 | ₹2,516.98 |
| 3 | Providing and laying dense graded bituminous macdam (D.G.B.M.) with HMP producing an average output of 75 tonnes per hour using crushed aggregates from approved quarry of specified grading premixed with bituminous binder [email protected] PER cent by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade level alignment rolling with smooth wheeled vibratory and tandem rollers to achieve the desired compaction adjustment for bitumen shall be done as per job mix formula and e-in-c latter no 2651DT 27.07.12 for proper completion of work as per direction of engineer in charge including all labour | 5.79 | cum | 14,199.6 | ₹82,215.68 |
| 4 | Providing and laying bituminous concrete (B.C.) with HMP crushed aggregates from approved quarry of specified grading premixd with bituminous binder(VG30)@5.40% by weight of total mix and filler transporting the hot mix to work site laying with a hydrostatic paver finisher to the required grade level alignment rolling with smooth wheeled vibratory and tandem roller to achieve the desired compaction | 44.59 | cum | 16,297.6 | ₹7,26,709.98 |
| 5 | GST | 18 | Percentage | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
BOQ_2229682.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .