Loading…
Loading…
Tender Value
₹1 L
EMD Value
₹1,000
Closing Date
27 Aug 2026, 3:00 pm3d left
Commissioner
Municipal Office Ambasamudram
Construction of culvert at 140011R251 Subramaniyapuram ayyakovil east street in Ward no 11 in Ambasamudram municipality
2026_MAWS_693570_1
283/2024/E1-C
Open Tender
Civil Works
Works
Municipal area
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,000
12 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
27 Aug 2026
12 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavating and depositing on bank with initial lead of 10 metres and lift of 2 metres in all kinds of soil except medium rock, dense medium rock and hard rock requiring blasting including refilling the sides of foundation with excavated earth in layers of 15 cm thick, watering and consolidation and depositing the surplus earth with in the compound in places as shown by the departmental officers with initial lead and lift, cleaning, leveling the site etc., complete complying with standard specifications | 7.1 | Cum | - | - |
| 2 | Cement Concrete M7.5 (1:4:8) (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications | 0.93 | Cum | - | - |
| 3 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification | 3 | Cum | - | - |
| 4 | Providing granolithic floor finish of 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two crushed sand (M-Sand) and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 3.4 | Sqm | - | - |
| 5 | Supplying, fabricating and placing in position of mild steel (or) Ribbed tor steel rods of required size for reinforcement of all RCC work including cost of steel rods, binding wire and labour charges and incidental charges for cutting & bending rods, tieing into grills, placing in position etc., complete as directed by the departmental officers. (TNBP No:15886) | 270 | Kg | - | - |
| 6 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB | 2 | Cum | - | - |
| 7 | Provision for GST 18% | 1 | 1Each ( Each) | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_833905.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].