Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.4 LAccepted-AOC 4 94D RAJA COTTAGE 1ST FLOOR KANYAKULAM PARVATHIPURAM NAGERCOIL KANNIYAKUMARI TAMILNADU 629 003 | KANNIYAKUMARI | TAMIL NADU | 629003 | ₹42.4 L Quoted ₹42.5 L | L1 | Accepted-AOC BEING LOWEST |
| 2 | L2₹45.8 LRejected-Finance NO 94 OLD NO 100 19TH MAIN ROAD 1ST N BLOCK RAJAJI NAGAR BANGALORE 560 010 | BANGALORE | BANGALORE | KARNATAKA | 560010 | ₹45.8 L | L2 | Rejected-Finance NOT BEING LOWEST |
| 3 | L3₹47.4 LRejected-Finance NO 23 SECOND MAIN ROAD RAJAMMAL NAGAR MADAMBAKKAM CHENNAI 600 126 | CHENNAI | CHENGALPATTU | TAMIL NADU | 600126 | ₹47.4 L | L3 | Rejected-Finance NOT BEING LOWEST |
| 4 | L4₹47.5 LRejected-Finance | ₹47.5 L | L4 | Rejected-Finance NOT BEING LOWEST |
| 5 | L5₹47.5 LRejected-Finance | ₹47.5 L | L5 | Rejected-Finance NOT BEING LOWEST |
| Sl No | Description | Qty | Unit | PREMIER ENGINEERING SYSTEMS L3 | Power and Telecom Systems L5 | M/s Dhapola Elevator and Engineering L6 | KAALIKA ELEVATORS No Rank | ADR ENTERPRISES L1 | MAN ELEVATORS COMPANY PRIVATE LIMITED L2 | KARTHIK INCORPORATE L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Comprehensive maintenance consisting of fort-nightly examination, testing, adjustment, oiling / lubrication, checking, cleaning, servicing, preventive maintenance, necessary repairs and replacement of defective parts etc for smooth operation of electrically operated Bharat Bijlee make lift 8 / 13 passengers capacity lift of 1.00 metre per second speed of AC VVV frequency drive with micro processor miconic control with simplex collective selective control system ARD (Auto rescue Device) in multistorey building to serve ground floor and five upper floors in residential area at DRDO complex (Phase-II) Bangalore including repair / replacement as required of car light LED, call bell, Audio system, fire switch, fire switch glass, car position indicator, car control switch, indicating lamp, door coupler, limit switch, replacement of broken mirror if any, etc ensuring continuous and effective functioning of the lift all as specified and directed by Engineer-in-Charge.
NOTE :- Building Nos C-43 to C-49 and E-32 to E-38) Total lift (14 Nos) at Phase-II Area, The rate quoted included necessary repair to ARD (Auto Rescue Device) to make it properly functional. | 154 | JOB PER MONTH PER LIFT | 9,150 ₹14.1 L | 9,800 ₹15.1 L | 10,000 ₹15.4 L | 9,600 - | 8,000 ₹12.3 L | 9,300 ₹14.3 L | 9,100 ₹14.0 L |
| 1.01NOTE :- 1. Maintenance and repair of all lifts and attending day to day complaints round the clock in all days in three shifts in residential area at DRDO Phase-II all as directed / specified as under:- (a) Nature of duty :- (i) Attending of all day to day complaints of maintenance works. (ii) Lift technician to be present in the area for attending emergency break down for Phase-II Area. (iii) In case emergency arises, contractor has to depute their technical person / Engineer to sites in odd hours to repair the defects and resolve the problem. (iv) Contractor should strictly adhere to the statutory regulation viz minimum wages act, PF act, ESI scheme and other regulations. (v) In case of delay in attending the complaints in time, department will be at liberty to get the work done through any other contractor and cost shall be recovered from the tenderer. | ||||||||||
| 2.00 | All as per Ser item No. 1.00 above but for OMEGA make lift for 8 / 13 passenger capacity lift at E-39 to E-45 (Total lift 07 Nos) at Phase-II Area. | 77 | JOB PER MONTH PER LIFT | 9,450 ₹7.3 L | 9,250 ₹7.1 L | 12,300 ₹9.5 L | 9,150 - | 8,000 ₹6.2 L | 9,000 ₹6.9 L | 9,300 ₹7.2 L |
| 3.00 | All as per Ser item No. 1.00 above but for OMEGA, UTI make lift for 544 Kg, for 8 / 13 passenger capacity lift t E-46 to E- 53 (Total lift 08 Nos) at Phase-II Area. | 88 | JOB PER MONTH PER LIFT | 9,600 ₹8.4 L | 9,600 ₹8.4 L | 11,500 ₹10.1 L | 9,350 - | 8,000 ₹7.0 L | 9,000 ₹7.9 L | 9,450 ₹8.3 L |
| 4.00 | All as per Ser item No. 1.00 above but for Johnson make lift for 680 Kg lift, 10 passenger capacity lift at Assembly Hanger to serve for ground floor and four upper floor GTRE (Total lift 02 Nos). | 22 | JOB PER MONTH PER LIFT | 9,500 ₹2.1 L | 8,850 ₹1.9 L | 13,200 ₹2.9 L | 9,250 - | 8,000 ₹1.8 L | 9,000 ₹2.0 L | 8,850 ₹1.9 L |
| 5.00 | All as per Ser item No. 1.00 above but for Schinder make 9 passenger capacity lift at RTC New Hostel to serve for ground floor and four upper floor at Phase-II Area Total lift 01 No. | 11 | JOB PER MONTH PER LIFT | 8,250 ₹90,750 | 8,250 ₹90,750 | 13,200 ₹1.5 L | 8,400 - | 7,500 ₹82,500 | 8,150 ₹89,650 | 8,800 ₹96,800 |
| 6.00 | All as per Ser item No. 1.00 above but for OTIS make lift for 544Kg / 8 passenger capacity lift at CEMILAC to serve for ground floor and three upper floor Total lift 01 No. | 6 | JOB PER MONTH PER LIFT | 8,250 ₹49,500 | 8,000 ₹48,000 | 11,000 ₹66,000 | 8,650 - | 7,500 ₹45,000 | 8,200 ₹49,200 | 8,500 ₹51,000 |
| 7.00 | All as per Ser item No. 1.00 above but for OTIS make lift for 13 passenger capacity lift at DARE to serve for ground floor and seven upper floor Total lift 02 Nos. | 22 | JOB PER MONTH PER LIFT | 10,950 ₹2.4 L | 9,550 ₹2.1 L | 12,000 ₹2.6 L | 10,300 - | 10,500 ₹2.3 L | 9,500 ₹2.1 L | 9,800 ₹2.2 L |
| 8.00 | All as per Ser item No. 1.00 above but for OTIS make goods of capacity 1 Ton at DARE . Total lift 01 No | 11 | JOB PER MONTH PER LIFT | 10,600 ₹1.2 L | 9,900 ₹1.1 L | 12,000 ₹1.3 L | 10,100 - | 10,500 ₹1.2 L | 10,050 ₹1.1 L | 9,950 ₹1.1 L |
| 9.00 | Comprehensive maintenance of consisting of fort-nightly examination as mentioned below as required and repairs / replace parts specified at the discretion of GE for smooth operation of KONE make 3 Ton capacity G+2 floor goods cum passenger lift at SIMEL building at ADE complete all as specified and as directed by Engineer-in-Charge.
(a) Check that lift stops in download direction properly with 25% over load with operation of the emergency stop when lift is moving at full speed.
(b) Check that leveling is with in limit X=+75mm for single speed lifts.
(c) Check and lubricate by grease cup or top up oil on sleeve type bearing on :-
(i) Motor shaft
(ii) Deflector sheave shaft
(iii) Governor pulley
(d) Check and lubricate sleeve bearing of governor tensioning pulley at the pit . | 11 | EACH LIFT PER MONTH | 8,450 ₹92,950 | 8,600 ₹94,600 | 7,200 ₹79,200 | 8,250 - | 9,000 ₹99,000 | 8,100 ₹89,100 | 8,750 ₹96,250 |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
2 Feb 2026, 6:00 pmClosed
MAJOR ANIRUDDHA SUBBA
DRDO Complex, CV Raman Nagar PO, Bangalore 560 093
COMPREHENSIVE MAINTENANCE OF LIFTS IN RESIDENTIAL ACCN TYPE III C43 TO 49 TYPE V E30 TO E38 TYPE V E39 TO E45 E46 TO E49 E50 TO E53 AND NEW TYPE V RESIDENTIAL ACCN INCLUDING CERTAIN OTHER LIFTS AND CERTAIN MISC REPAIRS TO LIFTS UNDER GE I R AND D EA
2025_MES_746712_1
8675/E8
Open Tender
Civil Works
330 days
GE I R AND D EAST BANGALORE
CLASS D CATEGORY c(ii)
8 documents required · 8 mandatory
₹500
Yes
GE I R AND D EAST BANGALORE
₹92,000
Yes
2 Mar 2026
13 Jan 2026
4 Feb 2026
13 Jan 2026
2 Feb 2026
27 Jan 2026
13 Jan 2026 - 24 Jan 2026
NOTE :- 1. Maintenance and repair of all lifts and attending day to day complaints round the clock in all days in three shifts in residential area at DRDO Phase-II all as directed / specified as under:- (a) Nature of duty :- (i) Attending of all day to day complaints of maintenance works. (ii) Lift technician to be present in the area for attending emergency break down for Phase-II Area. (iii) In case emergency arises, contractor has to depute their technical person / Engineer to sites in odd hours to repair the defects and resolve the problem. (iv) Contractor should strictly adhere to the statutory regulation viz minimum wages act, PF act, ESI scheme and other regulations. (v) In case of delay in attending the complaints in time, department will be at liberty to get the work done through any other contractor and cost shall be recovered from the tenderer.
All as per Ser item No. 1.00 above but for OMEGA make lift for 8 / 13 passenger capacity lift at E-39 to E-45 (Total lift 07 Nos) at Phase-II Area.
All as per Ser item No. 1.00 above but for OMEGA, UTI make lift for 544 Kg, for 8 / 13 passenger capacity lift t E-46 to E- 53 (Total lift 08 Nos) at Phase-II Area.
All as per Ser item No. 1.00 above but for Johnson make lift for 680 Kg lift, 10 passenger capacity lift at Assembly Hanger to serve for ground floor and four upper floor GTRE (Total lift 02 Nos).
All as per Ser item No. 1.00 above but for Schinder make 9 passenger capacity lift at RTC New Hostel to serve for ground floor and four upper floor at Phase-II Area Total lift 01 No.
All as per Ser item No. 1.00 above but for OTIS make lift for 544Kg / 8 passenger capacity lift at CEMILAC to serve for ground floor and three upper floor Total lift 01 No.
All as per Ser item No. 1.00 above but for OTIS make lift for 13 passenger capacity lift at DARE to serve for ground floor and seven upper floor Total lift 02 Nos.
All as per Ser item No. 1.00 above but for OTIS make goods of capacity 1 Ton at DARE . Total lift 01 No
Comprehensive maintenance of consisting of fort-nightly examination as mentioned below as required and repairs / replace parts specified at the discretion of GE for smooth operation of KONE make 3 Ton capacity G+2 floor goods cum passenger lift at SIMEL building at ADE complete all as specified and as directed by Engineer-in-Charge. (a) Check that lift stops in download direction properly with 25% over load with operation of the emergency stop when lift is moving at full speed. (b) Check that leveling is with in limit X=+75mm for single speed lifts. (c) Check and lubricate by grease cup or top up oil on sleeve type bearing on :- (i) Motor shaft (ii) Deflector sheave shaft (iii) Governor pulley (d) Check and lubricate sleeve bearing of governor tensioning pulley at the pit .
All as per Ser item No. 9.00 above but for OMEGA make lift 1 Ton capacity goods lift G+2 floor at FTTT building at ADE.
All as per Ser item No. 9.00 above but for KONE make lift 8 passenger /544 Kg capacity lift G+2 floor at DEBEL.
Supply only spare parts as per existing model suitable for existing Lift all as per specified and directed are as following:
(a) Maintenance free dry battery 17 Amp 12 Volts for ARD System (4 per set). Make EXIDE / AMCO
(b) V3F Main Drive suitable for 11 KW motor. Make FUJI / INVT
(c) V3F Door Drive single phase input 3 phase output for various cap lifts. Make: FUJI / INVT
(d) Door Sensor 2 mtrs long for various cap lifts. Make T L Jones / WECO
(e) Central processing PCB for various cap lifts. Make KONE / JOHNSON
Material and labour for replacement of landing push button with call register button with stainless steel face plate, fixing connection and testing and taking down the existing land push buttons complete all as specified and as directed.
Material and labour for replacement of flexible cable 16 / 32 copper wire wiring complete with connections and testing from control panel to half way junction boxes and control panel to landing push button box and landing gate to switches motor to controller and main switches with copper wire 7/20 gauge etc and taking down the unserviceable wires complete all as specified and as directed.
Supply and fix alarm bell with 6V battery and speaker complete all as specified and as directed.
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
8675Tender.pdf
Tender Documents • 0.81 MB
BOQ_838144.xls
BOQ • 2.42 MB
Download all tender documents and submit your bid