| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC | ₹4.2 L | L1 | Accepted-AOC ACCEPTED |
| 2 | L2₹4.2 L+₹1,320.50 (0.32%)Rejected-Finance | ₹4.2 L+₹1,320.50 (0.32%) | L2 | Rejected-Finance REJECTED |
| Sl No | Description | Qty | Unit | K N Prasanna L1 | GREEN ENVIRO SYSTEMS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling the exiting damaged Reinforced cement concerte surface Up to 3M height including clearing away from the site and all labour charge etc complete . | 5 | M3 | 4,840 ₹24,200 Lowest | 4,845 ₹24,225 |
| 2.00 | Dismantling the existing damaged Plain cement concrete surface Up to 3M height including clearing away from the site and all labour charges etc complete . | 12 | M3 | 545 ₹6,540 Lowest | 550 ₹6,600 |
| 3.00 | Earth work excavation for foundation (for narrow excavation) in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 50 | M3 | 144 ₹7,200 Lowest | 145 ₹7,250 |
| 4.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means | 6 | M3 | 5,575 ₹33,450 Lowest | 5,580 ₹33,480 |
| 5.00 | centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification | 100 | M2 | 487 ₹48,700 Lowest | 490 ₹49,000 |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by manual means | 23.5 | M3 | 7,055 ₹1,65,792.5 Lowest | 7,060 ₹1,65,910 |
| 7.00 | Centering for soffits of RCC slabs plane surface including strutting upto 3.00m height using mild steel of size 90cmx60cmx10 gauge fitted with MS angle of size 25mmx25mmx3mm laid over silver oak (CW) joists of size 10cmx6cm spaced at 90cm c/c and supported by causrina props of 10cm to 13cm dia spaced at 75cm c/c complying with standard specification | 27 | M2 | 974 ₹26,298 Lowest | 975 ₹26,325 |
| 8.00 | Supplying and fabrication placing in position of M.S. (or) RTS rods for required size and length as directed by the departmental officers approved design including bending cutting tying and cost of binding wire cost and conveyance of all materials to site etc., complete as per standard specification - 1 Qtl | 550 | kg | 94 ₹51,700 Lowest | 95 ₹52,250 |
| 9.00 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without inspiring strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost ofreinforcement grill and fabricating charges, centering and shuttering and also including laying,vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc.,complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | 5 | M3 | 8,345 ₹41,725 Lowest | 8,360 ₹41,800 |
| 10.00 | conveyance of excavated excess earth including loading unloading and refilling as directed by the departmental officers etc.,complete-1m3 3KM | 50 | M3 | 79 ₹3,950 Lowest | 80 ₹4,000 |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
11 Feb 2026, 5:00 pmClosed
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246, MEENASHI SUNDARANAAR SAALAI, ERODE
Re-Construction of culvert at Chidhambaram colony 1st street E-W road in ward no.45
2026_MAWS_654880_1
E1-0118-2025-3-30-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
60 days
ERODE CITY MUNICIPAL CORPORATION
Please refer Tender documents.
1 document required · 1 mandatory
₹885
₹5,000
8 Sept 2026
11 Feb 2026
11 Feb 2026
11 Feb 2026
11 Feb 2026
11 Feb 2026
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .