Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC | ₹7.0 L | L1 | Accepted-AOC Low Rate Quoted |
| 2 | L2₹7.0 LRejected-Finance | ₹7.0 L | L2 | Rejected-Finance High Rate Quoted |
| Sl No | Description | Qty | Unit | E KAMARAJ CONTRACTOR L1 | N VENKATESAN L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation | 9.92 | m3 | 263 ₹2,608.96 Lowest | 265 ₹2,628.8 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete. | 5.94 | m3 | 5,565 ₹33,056.1 Lowest | 5,600 ₹33,264 |
| 3.00 | Supplying and filling in basement with exavated earth in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification | 2.7 | m3 | 45 ₹121.5 Lowest | 50 ₹135 |
| 4.00 | Supplying and filling in foundation and basement with filling sand in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification | 2.7 | m3 | 1,817 ₹4,905.9 Lowest | 1,850 ₹4,995 |
| 5.00 | R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 16.4 | m3 | 9,472 ₹1,55,340.8 Lowest | 9,500 ₹1,55,800 |
| 6.00 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Matt Footing Alround | 19.15 | m2 | 547 ₹10,475.05 Lowest | 547 ₹10,475.05 Lowest |
| 7.00 | Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting.
Column | 86.38 | m2 | 1,094 ₹94,499.72 Lowest | 1,094 ₹94,499.72 Lowest |
| 8.00 | Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification. | 0.81 | MT | 91,943 ₹74,473.83 Lowest | 91,943 ₹74,473.83 Lowest |
| 9.00 | Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification. | 15.62 | m3 | 6,165 ₹96,297.3 Lowest | 6,165 ₹96,297.3 Lowest |
| 10.00 | Supplying and Appluing two coats of putty of 3mm thick over the exposed RCC Surface of ceilling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and surubbing | 61 | m2 | 308 ₹18,788 Lowest | 310 ₹18,910 |
Tender Value
₹7 L
EMD Value
₹7,000
Closing Date
19 Sept 2025, 5:00 pmClosed
BLOCK DEVELOPMENT OFFICER
ADMIN REASON
CONS OF DRAMA STAGE AT NAVAL UNDER MLACDS
2025_RDTN_604500_1
A6/4343/2025 NAVAL
Open Tender
Civil Works
Lump-sum
90 days
BLOCK DEVELOPMENT OFFICE
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
17 Jul 2026
16 Sept 2025
19 Sept 2025
16 Sept 2025
19 Sept 2025
16 Sept 2025
Amount
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay soil and hard gravel soil as per standard specification SS 20 B for narrow foundation
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and conveyance of materials to site and all other labour charges, etc. complete.
Supplying and filling in basement with exavated earth in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification
Supplying and filling in foundation and basement with filling sand in layers not more than 15cm. thick wellrammed, watered and compacted complete complying with standard specification
R.C.C. 1:11/2:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. Matt Footing Alround
Supplying and errecting centering for sides and soffits including supports and strutting up to 3.29m. Height for plain surfaces including strutting. Column
Supplying, fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc., complete complying with standared specification.
Brick work in cement mortar 1:5 (one cement five sand) using country Bricks ground moulded of size 23x11x7 cm. for the following including curing etc., complete complying with standard specification.
Supplying and Appluing two coats of putty of 3mm thick over the exposed RCC Surface of ceilling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and surubbing
Plastering with Cement Mortar 1:5 (one cement and five sand) 12 mm. thick in all floors including curing etc., complete complying with standard specification and as directed
Colour Washing with best Distember two coats of approved colour, including cost and conveyance of all materials and all labour charges, etc.
Providing Granolithic floor finish with CC 1:2:4 using 10-12mm hbg jelly
Painting two coats with approved Emulsion paint over one priming coat of cement plastered wall surface including cleaning preparing the surface and curing etc, complete-10m2
N VENKATESAN (BID ID -1465722)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].