| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAdmitted-Fee/PreQual/Technical/Finance NOCHIPALAYAM AUTHUR PO KARUR 2 | ₹4.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | GOBALAKRISHNAN P L2 | K.SELVARAJ L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers | 532 | M2 | 100 ₹53,200 | 95 ₹50,540 Lowest |
| 2.00 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 2 | M3 | 5,300 ₹10,600 | 5,272 ₹10,544 Lowest |
| 3.00 | Providing and laying tack coat of 2.00Kgs /10 sqm over the BT surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specification | 572 | M2 | 50 ₹28,600 | 34 ₹19,448 Lowest |
| 4.00 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36 and below metal by adding theshredded plastic 10 % of bitumen quality 3.02 kg (30.20 x 10% = 3.02 kg) shredded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 47.28 kgs of hot bitumen VG30 bitumen (160 degree celious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick of bituminious concrete including the cost of materials to CMP site, heating the bitumen and aggregate to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 kn vibratory Roller/Pneumatic Roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver to site etc, including hire charges and fuel charges for 20-30 TCMP with bitumen boiler, tipper trucks, paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 17.5 | M3 | 16,000 ₹2,80,000 | 15,345 ₹2,68,537.5 Lowest |
| 5.00 | GST 18% | 1 | Nos | 62,832.51 ₹62,832.51 Lowest | 62,832.51 ₹62,832.51 Lowest |
Tender Value
₹4.2 L
EMD Value
₹4,200
Closing Date
29 Jul 2026, 3:00 pmClosed
THE COMMISSIONER UDUMALPET MUNIICPALITY
MUNICIPAL OFFICE, UDUMALPET
Providing Renewal BT at UKC Nagar 11th Street in Udumalpet Municipality.
2026_MAWS_685330_1
1536/2026/E1
Open Tender
Civil Works
Works
30 days
UDUMALPET
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,200
29 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
29 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for cutting the B.T surface to 5 to 7 cm depth using milling machine, conveying the Milled waste materials to at least for 20 km distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental and unforeseen item etc. complete as per the direction of the departmental officers | 532 | M2 | - | - |
| 2 | Advance Patch work 13.20mm Providing Advancve Patch work using 50mm consolidated Thickness by using 1 m3 of 13.20mm IRC Metal with 44kg of Bittumen per 1 m3 of Metal For Pre Mixing For existing surface advance Patch work including cost and conveyance of materials to the work site and stacking them to the departmental metric guage for the premeasurement, heating the bitumen in bitumen boiler, heating the aggregates and mixing them with bitumen in mini hot mix plant for premix carpet only rolling by 60-70KN power roller for premix carpet and seal coat seperately including labour charges for spreading the mix for premix carpet application of bitumen for seal coat over premix carpet, including labour charges for spreading seal coat seperately over premix carpet etc. including higher charges and fuel charges for , bitumen boiler and all other tools and plant employed etc. complete as per of MoRTH Rev - V Specifications | 2 | M3 | - | - |
| 3 | Providing and laying tack coat of 2.00Kgs /10 sqm over the BT surface treated with binder using 2.0 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specification | 572 | M2 | - | - |
| 4 | Providing and laying Bituminous concrete to 30mm thick using 0.13 cum of 19.00-9.50mm graded metal, 0.17 cum of 9.50-2.36mm graded metal and 0.26 cum of 2.36 and below metal by adding theshredded plastic 10 % of bitumen quality 3.02 kg (30.20 x 10% = 3.02 kg) shredded plastic waste over the aggregate heated to 170 degree celcious in the central hot mix plant mixed well with 47.28 kgs of hot bitumen VG30 bitumen (160 degree celious) 60/70 grade for premixing per 10 sqm to lay 30mm compacted thick of bituminious concrete including the cost of materials to CMP site, heating the bitumen and aggregate to the required temperature and mixing the minimum required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 80-100 kn vibratory Roller/Pneumatic Roller to the required density etc., including labour for loading bitumen in to bitumen tank and metal to feeder unit, labour for attending to paver to site etc, including hire charges and fuel charges for 20-30 TCMP with bitumen boiler, tipper trucks, paver Finisher/9m paver finisher, Vibratory/Pneumatic roller and all other tools and plant required including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5. | 17.5 | M3 | - | - |
| 5 | GST 18% | 1 | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_823835.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].