Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.8 LAccepted-AOC 20 A 2ND FLOOR BLOCK C RAJEEV NAGAR BEGUMPUR DELHI 110086 | NORTH WEST | DELHI | 110086 | L-1 | Accepted-AOC Lowest bidder for the subject work. | |
| 2 | L-2₹21.5 L+₹63,199 (3.03%)Rejected-Finance | L-2 | Rejected-Finance other than the lowest bidder |
| Sl No | Description | Qty | Unit | M/S AL ASMA ENTERPRISES L2 | Shree Sai Ram Enterprises L1 |
|---|---|---|---|---|---|
| 0.00GENERAL SUMMARY | |||||
| 1.00Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:- | |||||
| 1.01 | (a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/27/2024 Sheet No. 01/02, CWE/ARCH/27/2024 Sheet No. 02/02 and Construction of Vocational lab (10m X 7m) as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications, etc complete all as specified and as directed.
NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor. | 1 | Block | 17,86,786 ₹17,86,786 | 17,00,000 ₹17,00,000 Lowest |
| 2.00 | Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 8,625 ₹8,625 Lowest | 18,570 ₹18,570 |
| 3.00 | Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 1,56,000 ₹1,56,000 Lowest | 1,84,460 ₹1,84,460 |
| 4.00 | Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 15,002 ₹15,002 | 11,282 ₹11,282 Lowest |
| 5.00 | Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 28,275 ₹28,275 Lowest | 28,275 ₹28,275 Lowest |
| 6.00 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 15,500 ₹15,500 | 10,596 ₹10,596 Lowest |
| 7.00 | Lump sum price worked out by the contractor for PATH WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately) | 1 | Lump Sum | 66,322 ₹66,322 Lowest | 75,928 ₹75,928 |
| 8.00SCH 'A' Pt - IX (MISCELLANEOUS PARTS) | |||||
Tender Value
₹19.1 L
EMD Value
₹38,140
Closing Date
9 Jun 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Col Pawan Kumar CWE Bhopal
Headquarters, Commander Works Engineer, Bhopal, Military Engineer Services, SI Line, Bhopal, Pin Code - 462001 (Madhya Pradesh)
CONSTRUCTION OF VOCATIONAL LAB (10.6M X 7M) AT PM SHRI KENDRIYA VIDYALAYA NASIRABAD UNDER GE NASIRABAD
2024_MES_690653_2
83974/E8
Open Tender
Civil Works
Item Rate
180 days
NASIRABAD
AS PER NIT CONDITION
7 documents required · 7 mandatory
₹500
Yes
GE NASIRABAD
₹38,140
Yes
7 Oct 2025
15 May 2025
11 Jun 2025
15 May 2025
9 Jun 2025
23 May 2025
15 May 2025 - 23 May 2025
Amount
GENERAL SUMMARY
Lump sum price worked out by the contractor against Schedule ‘A’ Part- I (BUILDING WORKS) for the following building works:-
(a) Lump sump amount worked out by the contractor for Design, development of structural drawings as per the architectural drawing Nos CWE/ARCH/27/2024 Sheet No. 01/02, CWE/ARCH/27/2024 Sheet No. 02/02 and Construction of Vocational lab (10m X 7m) as per architectural drawings, structural drawing, TD drawings, schedule of finishes & given specifications, etc complete all as specified and as directed. NOTE:- The structural design and drawing shall be got vetted from any IITs/NITs before execution of work by the contractor.
Lump sum price worked out by the contractor for EXCAVATION AND EARTH WORK as listed in Schedule ‘A’ Part- II (Ref prepriced schedule attached seperately)
Lump sum price worked out by the contractor for INTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-III (Ref prepriced schedule attached seperately)
Lump sum price worked out by the contractor for INTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part-IV (Ref prepriced schedule attached seperately)
Lump sum price worked out by the contractor for EXTERNAL ELECTRIFICATION WORKS as listed in Schedule ‘A’ Part-V (Ref prepriced schedule attached seperately)
Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS as listed in Schedule ‘A’ Part- VI (Ref prepriced schedule attached seperately)
Lump sum price worked out by the contractor for PATH WORKS as listed in Schedule ‘A’ Part- VII (Ref prepriced schedule attached seperately)
SCH 'A' Pt - IX (MISCELLANEOUS PARTS)
Supply and fixing street light bracket made of 32 mm GI pipe , 1.2 mtr lenght fixed with two nos of clamp , nut and bolts complete all as specified and directed.
S & F single pole and neutral enclosure with a two pin and earth plug and socket complete with one single pole 20 Amp MCB SP `C' series for AC complete all as specified and directed
Supply, laying and testing cable XLPE Insulated ,screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) in wall, trench and under Kota stone/Tiles, 1100 Volts grade with stranded aluminium conductor of size 50 sq mm 3.5 core complete all as specified and directed by Engr in Charge. Note: No extra cost will be paid against cutting of Kota stone or tiles.
M & L for earthing complete with galvanised steel earth plate electrode 60cm x 60cmx 6mm burried directly in ground (earth pit not less than 2.25 mtr deep below ground level) with top edged of the plate not less than 1.5 mtr below normal ground level, connected to galavanised iron earth lead by means of bolt, nut, check nut and washer of galavanised iron steel wire 4mm dia as earthing lead as shown in Electrical Plate No 4 of SSR Part I connected to earthing test point all as specified or indicated including testing on completion including necessary excavation and earth work in soft/ loose soil, earth pit in PCC 1:3:6 type C1 using 20mm stone aggreate, funnel, 20mm dia GI med grade water pipe, 15mm dia GI light grade earth lead protection pipe, CI frame and cover, wire, copper lugs, wire mesh, charcoal or coke and common salt in alterative layer all around the earth electrode compacted thickness 15 cm including excavation and earth work pit cover including disposal of surplus soil to a distance not excessding 50m, complete testing on completion all complete as shown in electrical plate no-4 of SSR part No1 all as directed.
M/S AL ASMA ENTERPRISES (BID ID -3307106)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .